Lee, Si Young;Jin, Young Gyu;Kim, Sun Kyo;Yoon, Yong Tae
Journal of Electrical Engineering and Technology
/
v.9
no.3
/
pp.1089-1095
/
2014
Innumerable microgrids would be operated independently by individual operators in a future smart grid. This kind of decentralized power system requires entirely different operation scheme in the actual power system and electricity market operation. Especially, frequency regulation is very important for successive energy trade in this multi-microgrid circumstance. This paper presents an optimal energy and reserve market participation strategy and operation strategy of energy storage system (ESS) by a microgrid operator (MGO). For definite evaluation of the proposed strategy, we postulate that the MGO should participate in the Power Exchange for Frequency Control (PXFC) market, which was devised by Maria Ilic and her coworkers and is suitable to the decentralized operation circumstances. In particular, optimal reserve capacity of the frequency control market and optimal market participation ratio of ESS between frequency control market and energy market are derived theoretically and evaluated by simulations utilizing Nordic Pool Elspot price data.
Proceedings of the Korean Operations and Management Science Society Conference
/
1998.10a
/
pp.239-244
/
1998
The environment of the access network service market is characterized by uncertain demand and various competing alternative technologies. In Korea, despite the introduction of competition, dominant Public Network Operator(PNO) still leads the market. Therefore, the decision of PNO has a great impact on the access network evolution. In this paper, we propose an model which aims to reduce risks and both investment and operating costs, to cope with the uncertain demand and technology evolution. We expect this model to provide a tool analyze risks and evaluate various strategies on the network evolution.
Proceedings of the Korean Operations and Management Science Society Conference
/
1996.10a
/
pp.182-185
/
1996
This paper analyzes how the international callback services affect on the international telecommunications market. We present a simple game-theoretic model to compare the equilibrium outcomes before and after the arrival of callback operator. We find that the callback service arises from the inefficiencies in the national telecommunications market and the accounting rate system between international telecommunications carriers. Also, we identify the conflicting interests among the governments and carriers, by examining how the callback service affects the collection rate, quantities demanded, carrier's profit and social welfare of each country.
Jiang, Jiein;Jin, Zilong;Wang, Boheng;Ma, Li;Cui, Yan
KSII Transactions on Internet and Information Systems (TIIS)
/
v.14
no.2
/
pp.687-701
/
2020
In the production of industrial fabric, it needs automatic real-time system to detect defects on the fabric for assuring the defect-free products flow to the market. At present, many visual-based methods are designed for detecting the fabric defects, but they usually lead to high false alarm. Base on this reason, we propose a Sobel operator combined with patch statistics (SOPS) algorithm for defects detection. First, we describe the defect detection model. mean filter is applied to preprocess the acquired image. Then, Sobel operator (SO) is applied to deal with the defect image, and we can get a coarse binary image. Finally, the binary image can be divided into many patches. For a given patch, a threshold is used to decide whether the patch is defect-free or not. Finally, a new image will be reconstructed, and we did a loop for the reconstructed image to suppress defects noise. Experiments show that the proposed SOPS algorithm is effective.
There exists a popular belief that the elderly are more conservative than the younger people in acceptability of new technology. This study explores whether the generation gap in technology acceptance exists in the case of using telepresence robots, which project the presence and mobility of remote operator, for the universal purpose of social participation rather than for specific applications. Two groups of senior citizens and undergraduate students in their twenties personally experienced the telepresence robots operation and conducted a survey on how they perceived the social participation of a remote operator mediated by telepresence robot and to what extent the remote operator deserve equal rights to be treated as if one really exists in the local environment. The results show that the elderly have higher expectation on the role and functions of telepresence robots, and more favorable in principle for a remote operator to exercise equal rights by operating telepresence robot. It suggests that the stereotypes, the elderly lag behind younger generation in accepting new technology, is unlikely to fit into the telepresence robot market, for the elderly have more favor and support using telepresence robots as an universal avatar for social participation.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.35
no.6
/
pp.147-152
/
2019
The purpose of this study is to derive priority improvement items through business expansion and efficient implementation for green remodeling business operator in order to enhance the activating of green remodeling business in a long-term perspective. For this purpose, survey of 128 business operator respondent is conducted based on 13 items. Also, priority improvements items were derived based on the results of the survey by using IPA(Importance Performance Analysis) techniques. As a result, In order to revitalize the green remodeling, it is necessary to induce market participation motivation through monetary profit. Additionally, The management of green remodeling business operator and the opinions of owners should be reviewed. In the future, the items that reflect the views of business operator and owners will be investigated and further research on improvements for expanding green remodeling 'interest subsidies on existing private buildings will be conducted.
This paper presents a formulation and a solution method for the optimization problem with a fuel constraint in a competitive electricity market. Take-or-Pay (TOP) contract for an energy resource is the typical constraint as a limiting factor. Two approaches are proposed in this paper for modeling the dispatch calculation in a market mechanism. The approaches differ in the subject who considers and inserts the fuel-constraint into its optimization problem. Market operator and each power producer having a TOP contract are assumed as such subjects.
This paper uses the horizontal regulation system as the base analysis framework. The study clearly defines the regulatory goals of the followings: the horizontal cross-ownership regulations on program provider (PP) and platform provider, the vertical regulation on cross-ownership between PP and platform operator, the regulation on cross-ownership of program provider by terrestrial broadcasting company, and the regulation on cross-ownership between terrestrial broadcasting company and platform provider. Then, by analyzing the conformity between goals and criteria of regulations and the adequacy of the regulation level according to regulatory purposes, this paper examines the justifiability of each regulation and extracts improvement measures that suite regulatory purposes. This analysis finds following appropriate measures: replacing the horizontal cross-ownership regulation on PP with conduct regulations, such as designating major broadcasting programs or replacing the current criterion of cross-ownership regulation from sales to the audience market share; reshaping the horizontal cross-ownership regulation on platform provider so that system operator (SO), satellite broadcaster and Internet protocol television (IPTV) operator would be applied by the same regulation based on the number of subscribers of pay television services; and discontinuing other cross-ownership regulation. In this way, the study shows that with appropriate regulations on cross-ownership of PP, there would be no need for additional regulation on vertical integration between PP and platform operator. On the other hand, given that the regulation on terrestrial broadcasting cross-ownership of PP could be justified only by regulatory purpose of the protection of the diversity of public opinions, it would be desirable to replace the current criteria of the number of PPs with the criteria of the audience market share. Lastly, the study shows that when platform operator is targeted by the cross-ownership regulation based on the number of subscribers of pay television services, the regulation on cross-ownership between terrestrial broadcasting company and platform provider should be replaced with conduct regulations, such as designating must-offer channels and major broadcasting programs.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.8
/
pp.1504-1511
/
2009
By development of renewable energies and high-efficient facilities and deregulated electricity market, the operation cost of distributed generation(DG) becomes more competitive. The amount of distributed resource is considerably increasing in the distribution network consequently. Also, international environmental regulations of the leaking carbon become effective to keep pace with the global efforts for low-carbon paradigm. It contributes to spread out the business of DG. Therefore, the operator of DG is able to supply electric power to customers who are connected directly to DG as well as loads that are connected to entire network. In this situation, community energy system(CES) having DGs is recently a new participant in the energy market. DG's purchase price from the market is different from the DG's sales price to the market due to the transmission service charges and etc. Therefore, CES who owns DGs has to control the produced electric power per hourly period in order to maximize the profit. If there is no regulation for carbon emission(CE), the generators which get higher production than generation cost will hold a prominent position in a competitive price. However, considering the international environment regulation, CE newly will be an important element to decide the marginal cost of generators as well as the classified fuel unit cost and unit's efficiency. This paper will introduce the optimal operation of CES's DG connected to the distribution network considering CE. The purpose of optimization is to maximize the profit of CES and Particle Swarm Optimization (PSO) will be used to solve this problem. The optimal operation of DG represented in this paper is to be resource to CES and system operator for determining the decision making criteria.
Journal of the Korea Institute of Information and Communication Engineering
/
v.22
no.4
/
pp.648-655
/
2018
Our government has concentrated its policy capabilities on Software industry in order to realize software-centric society. Through such efforts, software industry has developed continuously. As well, it has been a high-valued industry by the association with other various industries, so its importance has been great and its market has grown explosively. However, owing to the hasty support policies focused on software industry, various problems and adverse effects, such as the decline of construction quality due to the confusion of business operator selection and the business area conflict, has occurred. Therefore, in this thesis, I will find the problem and its cause about software support policies and relevant laws according to rapid market change, and will suggest the improvement plan about them. So, I intend to minimize the problems associated with the confusion of business operator selection, through the business area clarification(software industry and information communication construction industry) about complex ICT industry.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.