• Title/Summary/Keyword: Manning Equation

Search Result 54, Processing Time 0.019 seconds

Assessment of Design Method about Sanitary Sewer Network according to RDII and Established Scenario (RDII발생 및 기존 시나리오에 따른 오수간선 네트워크 설계방법 검토)

  • Kim, Jungryul;Oh, Jeill
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.367-374
    • /
    • 2016
  • In this study, the RDII impact on sewer designing in the upstream monitoring area (A site) was considered. Based on the long-term (1/1/2011~12/31/2011) rainfall and flow data consisting of 10-min interval sampling in the nearby design area (B site), the maximum RDII/DWF ratio was selected. The sewer network system at B site was evaluated by the Manning equation. Scenario 1 considering the hourly maximum flow with respect to the flow velocity showed that none of the sewer pipes satisfied the minimum flow velocity condition (0.6 m/s), and 40 pipes did not achieve half of the velocity condition. In scenario 2 considering I/I, 1 the pipes satisfied 0.6 m/s, and 35 pipes showed 0.3 m/s. Scenario 3 reflected the effect of RDII. Velocities in 26 pipes were less than 0.3 m/s, and 4 pipes satisfied the velocity condition. With respect to the allowance rate, 17 pipes were shown to have more than 99%, and none of the pipes satisfied less than 95% of the allowance rate in scenario 1. In scenario 2, 17 Ed: Per the Table pipes showed more than 99% and one pipe showed less than 95%. In scenario 3, 16 pipes showed more than 99% of the allowance rate, and 19 pipes showed less than 95%. Based on these results, it is predicted that deposition would occur due to the slow flow velocity; however, capacity would not be a problem.

Manning Structure and Working Conditions of British Merchant Seamen during the 18th Century (18세기 영국 상선 선원의 기승 구조와 근로 요건)

  • Kim, Sung-June
    • Journal of Navigation and Port Research
    • /
    • v.26 no.1
    • /
    • pp.55-65
    • /
    • 2002
  • The eighteenth century in Great Britain was the period of transformation, Great Britain externally experienced several wars intermittently mid internally transformed into the industrial country in the course of the 18th century. British shipowners were faced with short of seamen mainly due to several wars and expansion of shipping tonnage British shipowners tried to solve the mooing problem by decreasing the number of seamen from 22-23 sailors per ship of 100 tonnage in 1710's to 5 in 1810 and increasing seamen's wage from shillings per common seaman per month in the 17th century to 25 shillings in the middle of the 18th century and equation omitted during the French Revolutionary and Napoleonic Wars. What caused and resulted by specialized shipowners to cope with changeable market situation with flexibility was decrease of the number of seamen per ship and increase of wage.

Development and Application of ROADMOD for Analysis of Non-point Source Pollutions from Road: Analysis of Removal Efficiency of Sediment in Road by Sweeping (도로 비점오염 해석을 위한 ROADMOD개발 및 적용: 도로청소 효과 분석)

  • Kang, Heeman;Jeon, Ji-Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.2
    • /
    • pp.103-113
    • /
    • 2021
  • In this study, an Excel-based model (ROADMOD) was developed to estimate pollutant loading from the road and evaluate BMPs. ROADMOD employs the Chezy-Manning equation and empirical expression for estimating surface runoff, and power function for pollutant buildup, and exponential function for pollutant washoff in SWMM. The results of model calibration for buildup and washoff using observed data revealed a good match between the simulation results and the observed data. The long-term surface runoff and sediment simulated by ROADMOD demonstrated a good match with those by SWMM with 2 ~ 14% of relative error. The shorter sweeping interval (within 8 days) remarkably decreased sediment loads from the road. It was found that the effect of reducing sediment loads from the road was greatly affected not only by the sweeping interval but also by sweeping on the day before a rainfall event. The 48% of removal efficiency of sediment loads from the road was achieved with 26 times of road sweeping per year when sweeping was performed on the day before the rainfall event. A 4-day sweeping interval showed similar removal efficiency (48%) with 96 times of sweeping per year. It is considered that the road sweeping on the day before a rainfall event could maximize the effect of reducing the non-point source pollution from the road with minimization of the number of road sweeping. So, the road sweeping on the day before a rainfall event can be considered as one of the useful and best management practices (BMPs) on road.

A Method of Rating Curve Adjustment (수위유량곡선보정방법에 대하여)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.2
    • /
    • pp.4116-4120
    • /
    • 1976
  • With the use of many rivers increased nearly to the capacity, the need for information concerning daily quantities of water and the total annual or seasonal runoff has became increased. A systematic record of the flow of a river is commonly made in terms of the mean daily discharge Since. a single observation of stage is converted into discharge by means of rating curve, it is essential that the stage discharge relations shall be accurately established. All rating curves have the looping effect due chiefly to channel storage and variation in surface slope. Loop rating curves are most characteristic on streams with somewhat flatter gradients and more constricted channels. The great majority of gauge readings are taken by unskilled observers once a day without any indication of whether the stage is rising or falling. Therefore, normal rating curves shall show one discharge for one gauge height, regardless of falling or rising stage. The above reasons call for the correction of the discharge measurements taken on either side of flood waves to the theoretical steady-state condition. The correction of the discharge measurement is to consider channel storage and variation in surface slope. (1) Channel storage As the surface elevation of a river rises, water is temporarily stored in the river channel. There fore, the actual discharge at the control section can be attained by substracting the rate of change of storage from the measured discharge. (2) Variation in surface slope From the Manning equation, the steady state discharge Q in a channel of given roughness and cross-section, is given as {{{{Q PROPTO SQRT { 1} }}}} When the slope is not equal, the actual discharge will be {{{{ { Q}_{r CDOT f } PROPTO SQRT { 1 +- TRIANGLE I} CDOT TRIANGLE I }}}} may be expressed in the form of {{{{ TRIANGLE I= { dh/dt} over {c } }}}} and the celerity is approximately equal to 1.3 times the mean watrr velocity. Therefore, The steady-state discharge can be estimated from the following equation. {{{{Q= { { Q}_{r CDOT f } } over { SQRT { (1 +- { A CDOT dh/dt} over {1.3 { Q}_{r CDOT f }I } )} } }}}} If a sufficient number of observations are available, an alternative procedure can be applied. A rating curve may be drawn as a median line through the uncorrected values. The values of {{{{ { 1} over {cI } }}}} can be yielded from the measured quantities of Qr$.$f and dh/dt by use of Eq. (7) and (8). From the 1/cI v. stage relationship, new vlues of 1/cI are obtained and inserted in Eq. (7) and (8) to yield the steady-state discharge Q. The new values of Q are then plotted against stage as the corrected steadystate curve.

  • PDF