• Title/Summary/Keyword: Management of Public Application

Search Result 746, Processing Time 0.027 seconds

공공보건의료인력 임상교육효과 평가: 지역거점공공병원 간호사 대상 (The Effects of Clinical Education Program for Nurses in Regional Public Hospital)

  • 신윤희;박관준;변은경;이동원;주웅
    • 보건행정학회지
    • /
    • 제26권4호
    • /
    • pp.373-381
    • /
    • 2016
  • Background: The purpose of this study is to evaluate the outcomes of clinical education program for nurses in regional public hospital, utilizing the Kirkpatrick's model. Methods: Kirkpatrik's 4-level model was applied to this study. Trainees were asked to fill out questionnaires in the middle and at the end of the program. Also administrators of excellent trainees were asked to fill out the questionnaires regarding nursing management performance after 1-2 months from the end of the training course. Results: All trainees had positive reactions to the clinical education program. Not only the results of individual level (satisfaction and achievement scores, academic achievement scores, practical application rate, and educational transition factors) but also the scores of organization level (nursing management performance scores) are improved. Conclusion: By showing a correlation between the effectiveness factors we need to verify the relationship between these factors in a future study. In addition, development of quantitative and qualitative performance indicators are needed. To establish a long-term education system, it is required to applying the excellent trainee's successful experiences.

공공건설사업에서의 국가기반시설 건설정보 서비스 방안에 관한 연구 (Research on the Plans of Construction Information for National Infrastructure in Public Construction Projects)

  • 옥현;김진욱
    • 한국콘텐츠학회논문지
    • /
    • 제13권12호
    • /
    • pp.1026-1035
    • /
    • 2013
  • 최근 정보화는 기술경쟁력 강화를 위한 핵심 요소로서 업무 수행의 보조적인 역할에서 벗어나, 새로운 전략적인 도구로 활용되고 있다. 특히 건설분야는 국내외 경기침체에 따른 건설기술 경쟁력 확보를 위해 다양한 정보기술의 접목과 활용을 통해 비용절감 및 업무프로세스 개선을 실시하고 있다. 이에 국토교통부 소속 산하기관은 정보화를 통한 건설사업 관리의 투명성 및 효율성을 강화하고, 고부가가치 창출 및 경쟁력을 확보할 수 있도록 다양한 정보시스템을 구축하여 건설사업관리 및 유지관리 업무를 수행하고 있다. 하지만, 구축된 정보시스템이 일부 공공건설사업에 국한되어 활용됨에 따라 국가기반시설 전반의 현황을 파악하기에는 아직 미흡한 실정이다. 따라서 국토부 소속기관에서 활용되고 있는 건설사업정보시스템(건설CALS시스템)을 중심으로 산하기관 정보시스템으로부터 주요 건설정보의 수집 및 연계, 가공을 통해 공공건설사업에서의 국가기반시설 전반에 대한 건설정보 서비스 방안과 향후 추진방법 및 절차를 제시하고자 한다. 이를 통해 공공건설사업에서의 효율적인 사업관리 및 유지관리가 가능하며, 향후 정책입안 등 주요 의사결정을 위한 유용한 도구로 활용할 수 있으며, 또한 국가기반시설의 구축에서 유지관리까지의 건설정보 관리 및 활용이 가능하리라 예상된다.

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

Application of Visual Decision Making Process in the Development of Business Process Reengineering Vision and Implementation Plan

  • 김재경;성태경
    • 한국경영과학회지
    • /
    • 제14권2호
    • /
    • pp.185-185
    • /
    • 1989
  • Business process reengineering(BPR) aims at a radical redesign of our business processes in order to achieve dramatic improvements in their performance. However, the fact that many BPR projects have failed hesitates the companies who have started to use BPR or who are planning to do so. Implementing a radical plan from a cross-functional perspective needs a more careful consideration of process vision, preventive measures and contingency plan. Our research suggests to use a visual decision making process (VDMP) in the development of a process vision and implementation plan. A BPR project of Carlson School of Management (CSOM) at the University of Minnesota is illustrated to show our suggested methodology.

ASSESSMENT OF PUBLIC PERCEIVED ROADWAY SMOOTHNESS

  • Jamie Miller;Don Chen;Neil Mastin
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.507-508
    • /
    • 2013
  • International Roughness Index (IRI) has been widely used by state DOTs to quantify pavement smoothness. When pavement condition falls below certain IRI thresholds, corresponding pavement maintenance treatments should be considered for application. Selection of appropriate IRI thresholds is essential to tactical allocation of limited resources to improve the conditions of states' roadway systems. This selection process is often challenging, however, because IRI thresholds are largely determined by Perceived Ride Quality (PRQ), and PRQ differs in each state. In this paper, a framework is proposed to address this problem. Passenger raters will be randomly selected from predetermined geographic locations, and their PRQ ratings collected. Taking this perceived ride data, along with other data collected, a statistical analysis will be conducted to establish the relationship between measured IRI values and PRQ. Appropriate IRI thresholds will then be determined. Once this framework is implemented, state DOTs could make informative maintenance decisions, which are expected to greatly enhance the public perception of pavement conditions in today's challenging economy.

  • PDF

Building up an IT Service Management System through the ISO 20000 Certification

  • Park, Jung-Hoon;Kim, Hwan-Min
    • International Journal of Knowledge Content Development & Technology
    • /
    • 제2권2호
    • /
    • pp.31-45
    • /
    • 2012
  • This study prepared a foundation to provide high-quality services in a stable and effective way to meet the customer expectations, by building up and establishing an ISO 20000 certified IT service management system and protecting the information assets from various threats through effective system operation that meets the requirements of international standards, in order to ensure the reliability and stability of NDSL public services provided by KISTI Information Service Center and to enhance the customer satisfaction.

포괄수가제 당연적용 후 의약품 사용현황 분석 (Analysis of Drug Utilization after the Mandatory Application of the DRG Payment System in Korea)

  • 강희정;김지만;임재영;이상규;신의철
    • 한국병원경영학회지
    • /
    • 제23권2호
    • /
    • pp.18-27
    • /
    • 2018
  • Purposes: This study aims to investigate the policy effect of mandatory application of DRG for 7 disease groups in general and tertiary hospitals. Methodology: As DRG was fully implemented in July 2013, this study compares two periods before and after the change(from July 2012 to June 2013, and from July 2013 to June 2014). The benefit claim data of the National Health Insurance Service was used for the comparison. Target patients were those who visited general or tertiary hospitals between July 2012 to June 2014. For pharmaceutical consumption, Interrupted Time Series (ITS) analysis was used to see the effect of DRG mandatory application. Findings: The number of drugs prescribed per patient and pharmaceutical expenditure both showed significant reduction compared to before the DRG implementation. Practical Implications: This study used 2 sets of 1 year period data from before and after the full implementation of DRG to analyze pharmaceutical consumption. When the comparison data accumulates further, it would be possible to conduct more diverse analysis to assess policy effect and to provide way forward for the future.

모바일 대중교통 정보서비스 어플리케이션 이용성 평가에 관한 연구: 서울 대중교통 모바일 앱을 대상으로 (A Study on the Usability Evaluation of the Mobile Application for Seoul Public Transportation Information)

  • 이윤재;이지연
    • 정보관리학회지
    • /
    • 제33권4호
    • /
    • pp.225-244
    • /
    • 2016
  • 기술의 발전과 더불어 스마트폰의 보급률 및 이용률이 높아지면서 현대인의 생활 방식에도 변화를 가져왔다. 그러나 이용성을 고려하지 않고 끊임없이 생겨나는 어플리케이션으로 인해 이용자들은 여전히 어플리케이션 이용에 불편함을 겪고 있다. 이용성 평가는 다양한 요인과 방법을 통해 이루어지며, 초기의 물리적 편의에서 이용자 중심의 이용에의 만족도 평가로 점차 변화하고 있다. 그 중 불특정다수가 제약 없이 널리 이용 가능한 교통정보 어플리케이션은 이용자 측면에서의 연구가 중요함에도 불구하고 어플리케이션의 기술적 측면 또는 디자인적 측면에 치중되어 전반적인 이용자 중심의 이용성 평가에 한계가 있어 왔다. 본 연구에서는 서울 대중교통을 중심으로 하여 실제로 이용되고 있는 모바일 대중교통 어플리케이션을 대상으로 실제 이용자들을 통해 이용성을 평가하고자 하였다. 과제 수행, 심층 면담, 설문 조사를 통해 데이터를 수집하고 분석한 결과, 이용자들은 어플리케이션이 다량의 정보를 제공한다 할지라도 본인의 이용 목적에 부합하지 않는 정보에는 큰 매력을 느끼지 못하였고, 오히려 방해 요인으로 여긴다는 것을 알 수 있었다.

공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안 (Application of Incentive on Design VE to Public Design-Build Projects)

  • 이헌우;정재훈;김해곤;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.284-288
    • /
    • 2006
  • 건설교통부에서는 설계시공일관사업을 포함한 총공사비 100억원 이상인 모든 공사에 설계VE 적용을 의무화하고 있다. 현행 설계시공일관사업에서는 입찰을 통해 확정된 총액금액으로 설계가 진행되어 실시설계단계에서 VE의 실시 명분이 미흡한 상태이다. 그러므로 설계시공일관사업에서 설계VE을 활성화하기 위해서는 설계VE 적용 결과에 따른 절감액의 배분이 이루어져야 한다. 이에 본 연구에서는 현행 설계시공일관방식의 특성과 설계VE 적용의 문제점을 파악하고, 설계시공일관사업에서 설계VE 적용의 효과를 극대화할 수 있는 인센티브의 활용방법을 제안한다.

  • PDF

소프트웨어 사업 관리를 위한 지침과 적용방안 (The Guideline for Management of Software Project and Its Application)

  • 유천수;이상호;심승배;조성림;송기호;허정
    • 한국IT서비스학회지
    • /
    • 제8권1호
    • /
    • pp.125-142
    • /
    • 2009
  • The Ministry of Information and Communication announced "The Guideline for Management of Software Project" in October 2006. The public employees(acquirer) have to manage software projects with this guideline. The guideline was based on the International standard(ISO/IEC 12207) and IEEE standard(IEEE/EIA 12207), and was developed by considering the domestic software industry environment. The guideline can help to establish a software acquisition process for appropriate management of software projects, and the process can increase the management productivity of software projects. This study provides the explanation about the guideline with terms of 5W1H(who(user), what(summary), when(time to apply), where(domain of application), why(objective), how(method of use)) for understanding of the guideline.