Research on the Construction of an Automation Model for Maintenance Managers Based on Smart Devices (스마트 디바이스 기반 유지보수 관리자용 자동화 모델 구축에 관한 연구)

  • Park, Jihwan;Chung, Suwan;Lee, Seojoon;Song, Jinwoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.72-80
    • /
    • 2021
  • Based on the previous year's statistics, 37% of buildings in South Korea are aged over 30 years. As the number of the aging buildings increases, so does the need for maintenance. Building maintenance involves a significant number of works; the work of 'maintenance manager' accounting for the largest part. Currently, the maintenance history record is mostly in drawing or handwritten form which makes reviewing the data highly time consuming. Therefore, to improve the convenience of maintenance works and optimize historical data management, the existing maintenance process was analyzed. Problems were derived and a smart device-based automation model was established. In order to establish a smart device-based automation model, ① general flow of facility management process was analyzed and related articles were reviewed, ② current maintenance process was optimized, ③ functional block diagram of BIM Data, COBie Data, IoT, and AR-based automated maintenance management model was created, ④ a smart device-based automated maintenance management model was constructed, ⑤ finally, the above system was verified by testing the aforementioned model in the field site, evaluating the time required for the maintenance process and reviewing maintenance history data against the current one.

A Risk Assessment Method using Disaster Influence Factors on Construction Project (건설 프로젝트의 재해영향요인 기반 위험성 평가방법)

  • Yu, Yong-Sin;Choi, Jae-Wook;Kim, Tae-Wan;Lee, Chansik
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.6
    • /
    • pp.3-12
    • /
    • 2019
  • Current risk assessment methods typically determine accident risks embedded in construction projects by combining severity and frequency; however, they do not reflect the characteristics of construction projects. To solve the problem, this study aims to develop a novel risk assessment method that combines severity, frequency, and disaster influence factors (i.e., weather conditions and worker's characteristics) for assessing risks of activities occurring on a construction site actually. In this study, a severity was estimated by death against victims, and a frequency was estimated by the victim rate. The frequency was then converted to probability taking disaster influence factors into account. Thus, instead of considering severity and frequency for assessing the original risks (RO), the proposed method uses severity and probability to yield adjusted risks (RA) for each activity. A case study was conducted to determine if the proposed method works as intended in a real setting. The results show that RA is more sensitive to disaster influence factors than RO and, therefore, is able to assess the actual risks reflecting the working environment and conditions of a construction site. This study contributes to risk management of construction projects by offering a risk assessment method that measures a possibility of potential disasters from the probabilistic perspective. This method would help project managers assess accident risks in a more systematic and quantitative manner.

Risk Assessment for Disaster Reduction in Small-Scale Construction Sites (소규모 건축현장 재해감소를 위한 위험성평가 방안)

  • Choi, Hyun-Jun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.395-404
    • /
    • 2022
  • Purpose: Small-scale construction sites have insufficient systematic safety management activities, and due to the characteristics of the construction site, the production structure is complex due to external environmental factors, and the risk of construction equipment is very high. We would like to propose a checklist method among practical risk assessment techniques that can derive risk factors for disaster prevention at small construction sites and reduce disasters. Method: Risk factors were derived by analyzing literature research and disaster cases, and detailed work for a checklist of risk assessment suitable for small-scale construction sites was classified based on risk factor items. Result: Hazard factors were divided into 6 major categories, and 29 detailed types of work were classified based on actual work types, and 80 detailed works were classified accordingly. Conclusion: By arranging risk factors suitable for small-scale construction sites according to the classification system, the lack of expertise in the construction site can be supplemented, and risk factors can be derived more easily and disaster reduction can be expected through establishment of safety measures.

A Study on the Analysis of Environmental Hazards when Dismantling Non-Structure of Old Residential Buildings (노후 주거용 건축물 비구조체 해체 시 환경유해인자 분석)

  • Son, Byeung-Hun
    • Journal of Urban Science
    • /
    • v.10 no.1
    • /
    • pp.29-37
    • /
    • 2021
  • The number of old buildings older than 30 years in Korea continues to increase from 29.9% in 2005 to 38.8% in 2020. Considering the growing urban regeneration projects, urban maintenance projects, the suppression of urban expansion, and the lack of idle land in the city, the dismantling of old buildings is expected to increase further in the future. As major accidents at building dismantling sites continue to occur, related agencies are also strengthening safety management of building dismantling works. While physical safety management such as collapse and fall is strengthened, there is a relative lack of interest in the health of workers at dismantling sites due to environmental hazards. Since relevant laws stipulate that construction waste should be separated and discharged, old buildings need to be considered for environmental hazards such as fine dust, floating bacteria, and floating molds when dismantling. In this study, we intend to find important safety management elements in the management of building dismantling sites, measure environmental factors harmful to dismantling workers, and present basic data for the management of dismantling sites in the future. "Safety management" was the highest priority, followed by "dust," "vibration," "noise," "bacteria," and "smell." The perception of the importance of "physical damage prevention" with workers working on dismantling and managers managing the site came out similar, but the perception of "work efficiency" and "health disorder prevention" through environmental hazard management showed different priorities. In the process of dismantling, floating bacteria and floating mold were collected, cultured, and measured the concentration in the indoor air. The measurement was measured by dividing it into pre-dismantling and during dismantling.

A Study on the Effect of Mobile CCTV Monitoring on Safety Risk Factors (안전 Risk 요인에 대한 이동형 CCTV 모니터링이 미치는 영향 연구)

  • Young Cheol Song;Tae-Gon Kim;Eunseok Lee;Tae-Hun Kim
    • Industry Promotion Research
    • /
    • v.9 no.1
    • /
    • pp.39-45
    • /
    • 2024
  • Dangerous tasks that occur every day at industrial site manufacturing plants, which have recently been making rapid changes, were classified by type, and the effect of mobile circuit television (CCTV) on safety accidents among daily safety management methods was analyzed. The subject of the study is about 3,000 workers who manage the infrastructure facility sector to supply utilities such as gas, water, and electricity to the display manufacturing process located in Asan City, and the study was conducted based on the daily dangerous work from 2019 to 2022, and during this study period, many construction works such as new investment and expansion of construction and manufacturing processes were occurring at the site. As a result, the rate of safety accidents and exposure to risks are expanding, and most of the safety accidents occurred because the sectors that did not follow the basics and the safety measures on the site were not implemented. In this paper, it was confirmed that there is an accident reduction effect according to the relationship between the dangerous work classified according to the work importance and the mobile CCTV shooting rate. Considering the characteristics of the manufacturing plant site, it can be used to play the role of basic data for preventing safety accidents based on the expansion of the introduction of a new safety management culture in the future.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

A Study on the Basic Geometry Analysis of Abandoned Underground Mine Tunnels in Korea and Advanced Measuring-Analysis Technology for Underground Mine Cavities (한국의 폐광산 지하 채굴갱도 기초형상 분석 및 개선된 광산 지하공동 측정·분석 기술 연구)

  • Kim, Soo-Lo;Park, Sung-Bin;Choi, Byung-Hee;Yun, Jung-Mann;Jeong, Gyo-Cheol
    • Tunnel and Underground Space
    • /
    • v.26 no.6
    • /
    • pp.455-465
    • /
    • 2016
  • The collapse of underground mine development void for mineral resources can cause the subsidence of ground surface. In order to prevent the subsidence of ground, data such as maps or pictures of past mining site is important information for current mine reclamation works. In particular, mine subsidence management was based on mining maps and pictures. The process of the mining area surveys, safety evaluation, and ground reinforcement are normally possible with information such as maps and pictures in past mining. During the Japanese colonial period and 1960's, a lot of mines were developed in Korea indiscriminately. However, mining information at that time is limited to use. In the future, mining information will become even more rare. MIRECO intends to establish a realistic alternative solution. In this study, the basic numerical information of developed mine tunnels in Korea is statistically reviewed, and advanced underground cavity measuring technology was studied. 4,473 mine tunnel opening data of 1,784 abandoned mines in korea were collected and sorted. As a result of the analysis, the average value of small mine tunnel openings in Korea was 1.982 m in height and 1.959 m in width. The mean value of shape factor was analyzed as 0.485. The summary of these numerical mine data will be helpful for understanding and researching Korean abandoned mines. Therefore, the development of measurement technology for abandoned mine cavities and tunnels is expected to facilitate more effective mine subsidence management works in Korea.

Development of Integrated Management System Based on GIS on Soft Ground (GIS 기법을 이용한 연약 지반 시공 관리 시스템의 개발)

  • Chun, Sung-Ho;Woo, Sang-Inn;Chung, Choong-Ki;Choi, In-Gul
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.7
    • /
    • pp.37-46
    • /
    • 2007
  • In the practice of preloading method for soft ground improvement, field engineers need information of ground properties, construction works and field monitoring on ground behaviors of the site. So, integrating all these informations into one database can provide more efficient way for managing and utilizing the data for construction management. In this study, integrated system for construction management of ground improvement sites under preloading is developed. The developed system consists of database (DB) and application program. The database contains all collected data in a construction site and processed data in the system with their geographic information. All informations in the database are standardized from the result of data characterization. Application program performs various functions on managing and utilizing information in the database; pre- and post- data processing with graphic visualization of output, spatial data interpolation, and prediction of ground behavior using field measuring data. And by providing integrating informations and predictions over entire project area with comprehensible visual displays, the applicability and effectiveness of the developed system for construction management were confirmed.

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.