Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
International conference on construction engineering and project management
/
2013.01a
/
pp.163-168
/
2013
A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.
Today the social concern about Interior Design gradually requires wide comprehension. Also according to demanders' requirement. Colleges cope with speed. Interior Design made by experts for the function and purpose in the conception of decoration. Therefore, Colleges are responsible to educate for more capable professional designers. But management is the first concern for Interior Design Company students are going to work at. Interior Design has not the important state yet in Korea, it is hard to manage the company with only design works on the table. As architectural design side must get some admission, design is apart from construction. but they are worked together in Interior Design. Also, as the architectural design with process detail drawings, interior design is required the detail design for construction. But it is the facts that the college is interested in and concentrated on rather education for design and space plan than intensive education for construction because of the restricted environment of practice room. I propose component and practical use of nude construction department to understand detailed design.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.26
no.10
/
pp.72-80
/
2012
In general, electronic conveyor scales are installed in a relatively distributed manner on the crushed rock and sand production site. It is one of the time-consuming and difficult engineering works to monitor and control the plant operation status such as the management of measuring data, malfunction of belt conveyor, and fault of electronic conveyor scale. Therefore, to alleviate the inefficient problems and to monitor the operating plant in the online and remote control room, a remote calibration and real-time monitoring system, which is practically applied to the electronic conveyor scale system and verified by onsite experiment, is developed based on the LabVIEW.
The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.66-67
/
2016
Modular construction is attracting attention as the solution of recent problems in construction site. Such as lack of construction workforce, increasing labor costs, work delay due to extreme weather events and strengthening government regulations. However, despite the many advantages, Modular construction has not been activated dueto high construction costs compared to other construction methods. Accordingly, the object of this study is priority derivation of prefabricated house cost reduction factors and use as basic research data. For research performance, we have analyzed the blueprint and bill of quantities of a modular construction based public dormitory which was built in 2013. In result, the proportion of modular construction and on-site construction is 66% and 34%, and the construction cost proportion by activity was devided in to construction(79%), machinery(7%), electricity(5%) and civil(9%). Among these results in order to reduce costs, interior finishing(19.4) steel-frame(16.9%), metal works(13.5%), RC(11.8%), joinery(7.3%) is the order requires focused management.
Journal of Korean Society for Atmospheric Environment
/
v.29
no.4
/
pp.459-476
/
2013
Receptor models have been rapidly developed to manage the ambient air quality and to establish effective emission reduction strategies. The models are used to identify various emission sources and apportion quantitatively the ambient pollutant mass based on various measured physico-chemical properties of the air pollutants at the receptor site. Many types of receptor models have been applied to estimate source contributions since those provide fundamental information when establishing reasonable environmental policies in Korea and Foreign countries. In this paper, we will introduce the basic concept and principal of the receptor model, various types of existing models with discussing strong and weak points for each model, and performance procedure of PMF model as the most popular model in the world. Further the trends of receptor modeling studies in Korea and other countries were provided. Finally, the improvement directions of the modeling works for the national and local air quality management were suggested in this paper.
As an information-oriented era arrives, an environmental change of Internet marketing is going with high speed and such open door around the countries is providing worldwide companies with a new business opportunity. Now, Internet is a new communication tool for global network and is emerging as a new e-commerce market. Also, this trend is having an effect upon online site that sell crafts. Hence, this study aims to select artshop, which simultaneously operate off line and online while sell crafts, to research the present status, and analyze the problems to suggest the activation plans for effective Internet commerce. Accordingly, this study suggested six models for the settlement of these problem s and the activation plans as following: offer of the various works and the contents, security of price competition, reinforcement of marketing, establishment of brand recognition, management of customers and settlement of payment ways etc. The commerce of crafts in the artshop is only early stage today, but it is expected to grow into an universal connection way of information and buying which transcend space and to be briskly used for securing the competition of crafts in 21century.
Korean Journal of Construction Engineering and Management
/
v.16
no.3
/
pp.36-48
/
2015
To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.57
no.1
/
pp.34-44
/
2021
In order to collect basic information of response behavior of red seabream (Pagrus major) during pilling, works for constructing wind power station in Byeonsan Peninsular, Korea were investigated. Four cultured red seabream CRB1 to CRB4 [total length (TL): 27.1 ± 1.0 cm; body weight: 359 ± 30 g] were tagged with an acoustic tag and used in experiment. CRB1 and CRB2 to CBR4 were released on the sea surface at same time around the constructing site of the wind power plant on September 22, 2017 and July 18, 2018, respectively. The tracking of the CRB1 to CRB2 and CRB3 to CRB4 were conducted for two hours, approximately, using VR100 receiver including a directional hydrophone and VR2W receivers array consisted of 19 presence/absence receivers (VR2W receivers), respectively. The underwater noise level before (no pile driving works) and during pile driving works was measured 116.0-118.0 dB (re 1Pa) and a maximum of 160 dB (re 1Pa), respectively. CRB1 moved about 6.0 km with average swimming speed of 80.2 ± 20.5 cm/s for 2.1 hours without pile driving work. The average water depth of the sea bed on the route of CRB1 was 9.1 ± 0.4 m. CRB2 moved about 7.3 km with the average swimming speed of 96.8 ± 27.1 cm/s for 2.1 hours with pile driving work. The water depth of the sea bed on the route of CRB2 was 11.9 ± 0.6 m. At results of the Rayleigh's z-test two fishes CRB1 and CRB2 showed significant directionality in the movement (p < 0.01). Movement mean angles of CRB1 and CRB2 were 92.7 and 251.8°, respectively. CRB2, CRB3 and CRB4 exhibited the escaping behavioral response from the noise of source during the pile driving work. The swimming speed of the CRB2 exposed on the heavy underwater noise stimuli due to the pile driving work was 1.21 times faster than that of the CRB1 exposed on the ambient underwater noise in the study site.
The Risk assessment regulation(RAR) is one of the essential articles of the Occupational safety and health law for the construction industry along with safety and health management expense and safety organization regulation. However, arguments regarding the working time of the safety assessment documents, the person in charge of documentation, weakness in legislative enforcement etc. are ongoing. Thus this study aims to analyze the effectiveness of RAR for the guidance of enhancing the effectiveness of RAR. The findings are; 1) the effectiveness of RAR is recognized, however the indirect effectiveness ie, enforcement of safety activities, previewing of drawings etc. are bigger than the direct effectiveness of accident prevention, 2) to enhance the effectiveness of RAR site inspection procedure has to be utilized, 3) further research for identifying and getting rid of negative factors in RAR is recommended.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.