• 제목/요약/키워드: Management Works on Site

검색결과 148건 처리시간 0.028초

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • 국제초고층학회논문집
    • /
    • 제10권3호
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

가치흐름분석을 통한 건설자재의 공장화생산 타당성 검토 - 건축공사의 기계설비 공사를 중심으로 - (Feasibility Study in Construction Materials using Value Stream Analysis - Focused on Mechanical Works -)

  • 서창용;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.389-392
    • /
    • 2002
  • 국내 기계설비공사는 현장내의 불필요한 자재 적치 및 현장가공으로 인하여 불필요한 인원과 시간이 소요되는 것으로 조사되었다. 이와 같은 기계설비공사의 작업흐름을 린 생산 원리를 적용하여 가치흐름을 분석하였다. 가치흐름분석(VSA)은 가치흐름맵핑(VSM)을 통하여 기존공법과 공장화생산 공법을 비교하여 낭비요소를 도출하였다. 그 결과 기존공법의 문제점과 공장화생산의 저해요소를 도출하였고 이에 대한 개선 방향에 대하여 제시하였다.

  • PDF

The Development of Automatic Module for Formwork Layout using the BIM

  • Chijoo Lee;Sungil Ham;Ghang Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1266-1271
    • /
    • 2009
  • Formwork layout is perceived as important due to its strong tie to site works. But, most formwork is done manually and influenced by worker's skill and thus, a lot of construction errors occur. The introduction of BIM (Building Information Modeling) enables acquiring more precise information on the building shape, dimension, structure, etc. than 2D-based drawings and thus, the increased productivity, such as reduction of workload and work times, and the economic efficiency, such as reduction of formwork types and form dimensions with the consideration of constructability, are expected. This study reviewed the previous studies and formwork layout systems to derive this study's differentiations and factors to be first considered for formwork planning were derived by analyzing priorities against consideration factors. Last, a flow chart and algorithm were developed to apply the derived factors to the formwork layout module.

  • PDF

건설현장 물체에 맞음 사고 저감을 위한 줄걸이 작업 전문 자격제도 도입에 관한 연구 (A Study on the Introduction of a Rigging and Slinging Certificate System to Reduce a Struck by Object Accidents)

  • 염춘호;이진호;박현
    • 한국안전학회지
    • /
    • 제33권5호
    • /
    • pp.92-100
    • /
    • 2018
  • According to 'The Analysis of Industrial Accidents in 2016' by Ministry of Employment and Labor, the number of deaths caused by accidents in the construction field is 391, accounting for 47% of 826 industrial fatalities in all industries. The breakdown of the 391 fatalities of the construction industry shows that 'struck by an object' accident had 30 fatalities, the 3rd in frequency following falling (235) and crashing (32) accidents. This study aims to explore ways to reduce the 'struck by an object' accident with emphasis on safety education and certificate system for rigging and slinging works. This study reviews literature on rigging and slinging works and analyzes 'struck by an object' accidents. The rules and regulation on the rigging and slinging works are also reviewed both for Korea and other countries with best practices in construction safety such as Singapore, Japan, U.K., and U.S. The rigging and slinging certificate systems of those countries are also reviewed to find any advantage in the construction safety management. In addition, a pilot rigging and slinging certificate system was executed in one of domestic construction site followed by two surveys: one on the riggers who participated in the pilot operation and the other on general managers in domestic construction sites. Based on the analysis of the 'struck by an object' accidents and pilot operation, this study proposes a rigging and slinging certificate system to reduce accidents, enhancing safety condition of construction sites. The certificate system was proposed in a way to accommodate working practice of construction sites. Depending on rigging careers and a crane load capacity, riggers are eligible to apply either basic or master certificate which makes difference in the level of rigging works. The safety condition of rigging and slinging work could be substantially enhanced if workers, managers, supervisors, administrators, and policy makers work together consistently.

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

우리나라 청년층의 어깨 및 상지관절을 이용한 근력 측정 (Muscle Strength Measurement using Shoulder and Upper Joint for Korean Young-aged)

  • 윤훈용;김은식
    • 대한인간공학회지
    • /
    • 제28권3호
    • /
    • pp.125-134
    • /
    • 2009
  • The muscle strengths in various postures are used in our daily life with or without our recognition. Also, many works are still performed with strengths, although mechanization and automation have been fairly accomplished at the industry site. Since the late seventies, various body measurements have been conducted periodically in Korea, however, muscle strengths have not been measured actively. For this reason, the muscle strength data have been hardly accumulated. The aims of this study are to learn more about the physical strength of young-aged Koreans and to provide basic information for designing equipments, tools and facilities in the work site and daily life. The muscle strengths that are related to shoulder and upper limbs joints, which are used frequently, are measured in this study. Eighteen muscle strengths, from seven different movements such as elbow flexion, elbow extension, shoulder abduction(seated), shoulder adduction(seated), shoulder rotation(internal and external), lifting a tray, and turning a key(inward and outward) were measured. For every movement, the muscle strengths for both hands were measured. In each measurement, five seconds averaged value and peak value were collected. Comparing the average value, the strength of shoulder adduction was the strongest for male and female, while strength of turning a key inward with left hand was the weakest for male and female. Strengths of preferred hand in elbow extension, shoulder abduction, shoulder external rotation, lifting a tray, and turning a key were stronger than those of non-preferred hand for both male and female. Rohrer's index considerably had an effect on muscle strength. The results of this study can provide some basic information not only in designing the equipment and facilities in work site or daily life, but also in selection, training and management of workers.

재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구 (The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data.)

  • 김반석;박병주;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF

건설 프로젝트의 DAT (Data Acquisition Technology) 활용현황 및 개선방향 (Application of DAT (Data Acquisition Technology) in the Construction Projects)

  • 서큰솔;정영수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.329-333
    • /
    • 2008
  • 최근 건설공사가 대형화 및 복잡화됨에 따라 건설현장에서의 진행관리 중요성은 점점 더 증대되고 있다. 현재 건설 프로젝트 현장에서는 데이터, 정보 기록 및 분석을 현장관리자가 직접 수작업으로 수행하고 있어 상당한 노력과 시간이 소비되고 있으며, 이는 생산성 저하 등 문제점을 있어 야기하고 있다. 이를 개선하기 위한 방안중의 하나로 첨단 DAT(Data Acquisition Technology) 기술 적용이 시도되고 있으며, 본 연구에서는 이러한 DAT의 포괄적 적용 가능성을 분석함으로써 효율적인 프로젝트 진행관리의 방안을 검토하고자 한다.

  • PDF

모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구 (A Study on modular construction method in military facilities)

  • 박재식;박태근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.642-647
    • /
    • 2006
  • 최근 우리 군은 장병들의 삶의 질 향상과 군 구조 개편에 따른 이동성능 향상을 위해 모듈러 공법으로 노후시설 개선사업을 추진하고 있고 향후에도 본 공법에 대한 수요는 점차 증가할 것으로 예상된다. 그러나 2005년부터 본 공법을 적용하여 우리군에 시공한 시설들은 아직 초기단계로서 설계도서에 모듈러 건축특성을 충분히 반영하지 못하고 일부 공사를 습식공법으로 시공하였으며 또한 현장제작 비율이 높아 공기가 지연되고 품질이 저하되는 사례가 발생하였으므로 단계별로 문제점을 분석하고 개선방안을 제시하고자 한다. 본 연구에서 그동안 준공된 시설을 분석한 결과, 현장작업과 습식공법을 최소화할 수 있도록 설계하여야 하며 생산성향상을 위해 자동화 설비를 구축하여야 하고 단위모듈 이송 전 이동경로에 대해 주행시험을 실시하여 도로조건을 확인해야 하며 현장조립 시에는 모듈간 접합 및 연결방법을 개선하여 품질을 향상시켜야 할 것이다.

  • PDF

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF