• Title/Summary/Keyword: Management Works on Site

검색결과 148건 처리시간 0.024초

도로비탈면 녹화공사의 사후환경평가 항목 제언 (Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works)

  • 김태국;김남춘;김은범;구민규
    • 한국환경복원기술학회지
    • /
    • 제21권4호
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

현장중심의 건설가설기술요소 분류체계 구축 (Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index)

  • 박준모;김옥규
    • 한국건설관리학회논문집
    • /
    • 제15권4호
    • /
    • pp.77-85
    • /
    • 2014
  • 건설가설공사는 타워크레인, 리프트와 같은 가설양중설비나 사무소, 창고, 시험소 등의 가설건축물 및 각종 작업에서 사용되는 비계, 작업발판, 동바리, 거푸집 등을 일시적으로 조립, 설치하여 사용하고 공사가 완료된 후에는 철거하는 건설공사의 주요 과정인 동시에 핵심공종이다. 새로운 요구사항에 대한 건설현장의 발 빠른 대응과는 달리 국내의 건설가설분야의 기술체계는 실무에서 효용성이 낮아 개선이 필요한 실정이다. 이에 본 연구에서는 기존 기술체계와 현업에서 활용되고 있는 새로운 기술과 기법 등을 정리하고, 현장관리자의 의견과 검토를 통한 가설기술의 기초가 되는 기술요소의 분류체계를 구축하였다. 이를 바탕으로 향후 건설가설기술요소에 대한 성능과 활용성에 대한 연구를 통하여 지식정보체계로 거듭날 수 있도록 개선해 나갈 예정이다.

아파트 외벽 갱폼공사를 위한 근로자 안전관리 점검표 개발 (Development of Worker's Checking Table for Safety Management in Apartment Gang-form Works)

  • 구교진;이준호;조동현;강정우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.317-318
    • /
    • 2012
  • Although installations and usages of gang-form that has advantages of preventing fall disaster, the serious disasters from gang-form occur every year. This research focused on the continuous prevention of disasters in construction of outer wall of apartment working site through step by step safety management worker's checking table. The result is the worker's checking table for safety management in apartment gang-form works, through safety guidelines case studies, interviews with safety management experts and then extracting a check list.

  • PDF

건설현장에서의 사고유형별 원인 분석 및 재해예방대책에 관한 연구 (A study on the Causes Analysis and Preventive Measures by Disaster types in Construction Fields)

  • 조재환
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2011년도 추계학술대회
    • /
    • pp.23-34
    • /
    • 2011
  • Recently, carelessness on safety management in construction sites has caused a sharper upward trend in accidents and disasters, compared to the past. Therefore, this study analyzes the causes of accidents that occurred on construction sites in the year of 2010, and proposes preventive measures. The construction industry had a heavy death rate with 279 out of 418 deaths from falls in all industrial sites, accounting for 66.7%. And the causation analysis found a particularly high incidence of temporary structure-related accidents, with falling off scaffolding as the most common cause of accidents. According to the causation analysis of fall-down accident cases, accidents induced by protrusion on construction sites are a big contributor resulting in the deaths of 312, accounting for 74.8%, which is deemed to be due to site disorderliness. And to remove floor protrusions and to secure workers' traffic line and safety, neat and thorough site arrangement is necessary. Against collision, efforts must be made to prevent equipment-pedestrian crashes on site, which necessarily requires emergency lamps, alarm bells, and safety poles and blocks to be installed, lighting systems to be improved, obstacles to be removed, site supervisors to be assigned to construction equipment works, and workers to be more intensely trained and supervised.

  • PDF

A study of the factors affecting delay in apartment projects in Vietnam

  • Luu, Truong-Van;Kim, Soo-Yong
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.718-721
    • /
    • 2007
  • Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.

  • PDF

공공공사의 설계변경과 관련한 감리업무 개선방안에 대한 연구 (A Study on the Improvement of Supervision Works related to Changes in Construction Projects)

  • 권찬순;김만철;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.246-249
    • /
    • 2003
  • 본 연구에서는 건설공사에서 수행되고 있는 주요 선계변경과 관련하여 설계서와 결함으로 인한 설계변경, 현장상태와 설계서의 상이로 인한 설계변경, 발주자의 필요에 의한 설계변경 등으로 구분하여 설계변경시의 감리업무에 대한 제반규정과 현장에서의 업무수행 현황 등을 비교${\cdot}$분석하는 방법으로 관련규정의 상호모순으로 인한 감리업무 수행의 문제점을 도출하였다. 이를 토대로 설계변경과 관련된 법령/계약조건/지침상의 규정된 내용과 현장에서의 업무수행을 비교${\cdot}$분석하여 공공공시의 설계변경과 관련한 감리업무의 개선방안을 도출하였다.

  • PDF

지중무선 시스템을 이용한 침매터널 구간 계측관리 사례연구 (Case Study of Immersed Tunnel Instrumentation Management Using Wireless System)

  • 한상욱;김병희;한병원;이계춘
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.768-773
    • /
    • 2009
  • Measuring method being applied for off-shore works is performed by using data logger or manual measuring instrument with wiring the cable connected from the sensor up to the position where measuring is allowed.(upper part of embankment or marine structure) Measuring management by using existing measuring method may be acceptable on the condition that the ground deformation volume(vertical, horizontal) is generally minimal and the site condition is good. But loss of measuring instrument, sensor cable failure or cutting is taken place frequently due to significant change of ground behavior caused by an external force change(embankment, excavation) under very soft ground condition(N value below 0-4). In case of the marine works, in particular, loss rate of measuring instrument is highly represented due to the factors of working barge anchoring, constructional interference and natural disaster. In order to solve these problems, measuring management was performed with employing underground wireless system at the immersed tunnel site. Measuring data was obtained freely under the marine environment by using underground wireless communication and cable cutting potential by ground behavior could be reduced. Measuring cost savings and its installation convenience were maximized by way of off-shore tower installation or cabling and by minimizing constructional interference of off-shore working barge. This case of measuring management was accomplished successfully.

  • PDF

지리정보시스템(GIS)을 이용한 도심지 내의 위해시설 관리시스템 구축에 관한 연구 (A Study on the Control of Hazard Facilities Management system in Urban area by utilizing GIS)

  • 함은구;노삼규
    • 한국방재학회 논문집
    • /
    • 제5권4호
    • /
    • pp.9-15
    • /
    • 2005
  • 본 연구는 도심지에 위치한 LPG 충전소를 연구범위로 하여 공간정보의 활용이 가장 많이 요구되는 안전관리 분야의 업무를 중심으로 공간정보를 효율적으로 구축 활용하기 위하여 데이터베이스를 중심으로 위험관리정보 시스템을 개발하였다. 이를 바탕으로 정량적 위험성 평가의 자동화를 통해 나타난 위험성을 실시간에 제어하기 위한 필요조건을 표준화하여 기초 정보자료로 구축, 이를 지리정보기능과 연동하여 LPG 충전소의 안전검사의 효율화, 사전 위험성 평가, 사고대응 판단의 효과적인 의사결정을 유도 할 수 있는 기반을 제공한다. 위험관리정보시스템(RMIS, Risk Management Information System) 개발절차는 다음과 같다. 첫째, 도심지에 위치한 LPG 충전소 위험성 평가를 수행함에 있어서 기본적인 데이터인 부지내(On-site) 관련 자료와 부지 외(Off-site) 관련 자료를 관계형 데이터베이스(RDB, Relational Database)로 개발하였다. 둘째, Visual Basic을 이용하여 사용자가 효과적으로 위험을 관리 제어 할 수 있는 위험관리 통합 데이터베이스 시스템 개발하였다. 셋째, 위험관리 통합 데이터베이스 시스템과 지리정보시스템에 연동을 통한 의사결정 방안 제시하였다. 위험관리정보시스템(RMIS) 프로그램을 개발을 통하여 다음과 같은 결과를 도출하였다. 첫째, 위험관리 데이터 이용하여 사용자와 검사자가 효과적으로 위험을 사전관리 할 수 있는 공유정보를 구축하였다. 둘째, 위험 관리를 부지 내와 부지 외로 나누어 관리함으로서 시설 내부 뿐 만 아니라 시설외부에 미치는 영향을 모두 고려하여 구축하므로 서, 중대사고에 대응 할 수 있는 종합적인 안전관리 기반을 조성하였다. 셋째, 사용자 인터페이스를 바탕으로 비상사태 발생시에 신속하고 정확한 의사결정을 할 수 있는 기반을 조성하였다.

공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교 (Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.182-189
    • /
    • 2008
  • 국내 공공 및 민간사업에서 시행하는 건설공사에서는 원칙적으로 정부제정 건설표준품셈에 의한 노무량을 근거로 원가계산과 현장의 생산성관리를 수행하고 있다 또한 노무량은 관련 법규에 의한 산재보험료, 고용보험료, 퇴직공제부금비, 안전 관리비, 환경보전비 등을 비용으로 계상하는 근거가 되며 공사 진도관리에 있어서도 영향을 미치고 있다. 그러나 표준품셈에 의해 산정된 설계 노무량은 현장 실투입 노무량과 차이가 있는 것으로 추정되고 있으나 그동안 이를 규명한 바가 없었다. 본 연구에서는 43개 공동주택의 철근콘크리트공사에 참여하는 거푸집 형틀목공, 철근조립공, 콘크리트공의 실투입 노무량을 현장 조사하였으며 표준품셈의 산정기준과 비교하였다. 또한 실무전문가 65명을 대상으로 하는 설문조사와 현장소장과 감리단장 32명의 면담조사를 병행하여 표준품셈과 현장 실투입 노무량이 상이한 원인을 분석하였다. 본 연구에서 제시한 공동주택 건축공사의 공종별 노무량 회귀모델은 실적공사비를 적용한 공사계약관리와 더불어 실투입 노무량에 기반한 경비산정과 현장관리의 가능성과 방향을 제시하였다는 점에서 그 의미가 있을 수 있다.

계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 - 초고층 주거건축물 공사 건식벽체공법을 대상으로 (A Study on the Analysis of Planning and Management Factors of Finishing Works Using an Analytic Hierarchy Process)

  • 이치주;김재준;이윤선
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.132-140
    • /
    • 2007
  • 건설 산업의 새로운 부가가치 영역으로 초고층 주거건축에 대한 관심과 투자가 증가하고 있다. 이러한 초고층 건축물을 시공하는 과정에서 많은 작업들이 층별로 반복적이며 동시에 진행되는 마감공사는 업체별 공사 관리 능력에 따라 공기 차이가 발생하고 있고, 이는 전체 사업 공기에 큰 영향을 주고 있는 것으로 나타났다. 마감공사의 효율적 수행을 위해서는 초고층 주거 건축물 마감공사의 현장 특성을 고려한 작업의 생산성 영향요인을 도출하고 중요 요인에 대한 중점 관리의 필요성이 제기되고 있다. 생산성 영향요인에는 기술적 요소 외에도 마감공사의 프로세스를 계획하고 관리하는 많은 복합적인 요소들이 존재한다. 본 연구에서는 계층 분석적 의사결정 기법인 AHP 분석을 통해 마감공사 프로세스의 계획 및 관리 요인측면에서 생산성 영향요인의 중요도를 분석하였다. 이와 같이 중요도가 높게 나온 요인 중 잠재 개선 효과가 큰 요인들에 대한 중점 관리 및 연구를 수행한다면 마감공사의 생산성 영향요인에 대한 이해를 높여주는 한편 실무적 관리방향을 제시함으로써 건설기업의 체계적 인 생산성 관리에 기여할 수 있을 것이다.