The 3th International Conference on Construction Engineering and Project Management
/
pp.606-615
/
2009
Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.
The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.
Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.730-731
/
2015
This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.
This study is to develop an information security management model(ISMM) for small and medium sized enterprises(SMEs). Based on extensive literature review, a five-pillar twelve-component reference ISMM is developed. The five pillars of SME's information security are: centralized decision making, ease of management, flexibility, agility and expandability. Twelve components are: scope & organization, security policy, resource assessment, risk assessment, implementation planning, control development, awareness training, monitoring, change management, auditing, maintenance and accident management. Subsequent survey designed and administered to expose experts' perception on the importance of these twelve components revealed that five out of tweleve components require relatively immediate attention than others, especially in SME's context. These five components are: scope and organization, resource assessment, auditing, change management, and incident management. Other seven components are policy, risk assessment, implementation planning, control development, awareness training, monitoring, and maintenance. It seems that resource limitation of SMEs directs their attention to ISMM activities that may not require a lot of resources. On the basis of these findings, a three-phase approach is developed and proposed here as an SME ISMM. Three phases are (1) foundation and promotion, (2) management and expansion, and (3) maturity. Implications of the model are discussed and suggestions are made for further research.
건설 프로그램 수준의 복합용도개발사업은 다양한 참여주체들에 의해 장기간에 걸쳐 대규모로 추진되는 사업특성으로 인하여, 사업기간동안 여러가지 갈등이 발생하게 된다. 특히 다양한 프로젝트가 복합된 프로그램 사업의 특성상 참여주체별 요구사항이 상이하여 시설종류 및 규모를 적정하게 계획하는 것이 매우 중요하며, 이를 위해서는 사업의 기획단계에서부터 VE를 실시하여 고객의 요구에 적합한 해결책을 도출할 필요성이 있다. 따라서 본 연구에서는 건설 프로그램 사업의 기획단계 VE 수행에 있어서 발주자의 요구사항을 명확하게 파악하여, 해당 프로그램에 요구되는 적정시설을 제시하기 위한 다차원 품질모델을 개발하였다. 다차원 품질모델 개발을 통해 복합용도개발사업의 12개 성능지표별 15개 주요시설의 특성분포를 제시하였으며, 참여자 요구사항에 따른 적정시설 도출 및 검토, 성능지표간 다차원 합성방안을 제시하였다. 본 연구는 건설프로그램 사업에 기획단계 VE를 적용하기 위한 기본연구로서 의의가 있으며, 본 연구에서 제시한 다차원 품질모델을 통하여 사업초기단계에서 다양한 참여주체들의 요구사항을 기반으로 적정시설을 제시 또는 검토하는 것이 가능할 것으로 기대한다.
최근 국내에서는 쇠퇴도시 재개발, 도시의 균형발전, 도시 이미지 창출을 목적으로 메가프로젝트 규모의 사업이 활발히 추진되고 있다. 메가프로젝트 사업은 다양한 주체들에 의해 장기간에 걸쳐 대규모로 추진되는 특성으로, 참여주체간의 복잡한 이해관계와 갈등, 부적절한 시설규모 계획을 통한 사업성 저하 등의 문제점이 야기되고 있다. 이러한 문제점을 해결하기 위해서는 사업초기단계에서 비용절감 및 성능향상 효과를 최대한 발휘할 수 있으며 다양한 시설의 규모적 특성을 기능중심적 사고를 통해 지원할 수 있는 VE 적용이 필수적으로 요구된다. 하지만, 사업초기단계에 대한 가용정보의 부족, 기존 방법론의 부재 등으로 인하여 사업초기단계에서의 VE적용은 미흡한 실정이다. 따라서 본 연구에서는 사업초기단계 메가프로젝트의 문제점과 VE적용의 한계를 해결하기 위한 방안으로, VE준비단계에서의 VE팀 구성, Quality Model, 성능지표, Space Model을 제안하였다. 본 연구의 결과는 메가프로젝트의 기획/계획단계에서 VE 수행을 위한 기초적인 자료로 활용될 수 있을 것으로 기대된다.
This study examines a normative model of project management systems, PPMS, to provide information for directing R&D activity in order to increase R&D productivity. The PPMS (Project Process Management System) is a disciplined and systematic framework to manage R&D projects effectively and efficiently under the assumption of a strategic decision making and long-range planning. The purpose of PPMS is to provide for the management of research organization at different levels an effective management tool; first, for the planning system which deals with rational selection and authorization of R&D projects, second, for the control system which concerns monitoring and controlling the execution of R&D projects, and finally, for the evaluation system which attains evaluation of the performance results of R&D projects and determination of the necessary follow-up. A view for the future development of project management within the context of a project-performing organization is also elaborated to exhibit the progress and phase description of the project management system.
국내의 SOC 사업은 그 기획단계에서 업무 추진의 근거가 될 수 있는 업무 절차와 의사결정의 기준 등이 미비하거나 표준화되지 못한 상태에서 추진되고 있으며, 이로 인하여 사업수행 과정에서 여러 가지 시행착오를 겪고 있는 것이 현실이다. 따라서 SOC사업의 기획업무 과정에서 모든 사업목표와 관리대상에 대한통합관리의 기능을 수행할 수 있는 정형화된 절차 모델의 개발이 필요하며, 본 연구는 SOC사업의 기획업무 개선을 위한 기획관리 모델 개발의 기반을 구축하는데 그 목적을 두었다 모델 개발의 적용범위는 도로, 철도, 공항, 항만을 포함하는 교통시설로 한정하였고 주요 연구결과로서, 현행 SOC 사업의 문제점 제시와 함께 기획단계의 업무 프로세스, 각 단계별 중점 고려사항, 기획업무 개선을 위한 핵심적 개선방향을 SOC사업 기획관리 모델 개발의 기반으로 제시하였다.
The aim of synchronization of production and transportation planning in the supply chain is to increase the flexibility and to decrease various costs. The suggested model in this study synchronizes the timing to supply to a downstream manufacturer directly after production and to be consumed in a downstream manufacturer right after receipt. This model deals with the frequent delivery in small amount which is a new trend of the transportation not governed the economy of scale principle. Moreover, various types of transportation governed by the economy of scale principle or not are considered. Then, the two-phase mathematical model is suggested to obtain optimal job sequence and production quantity for each tasks. But, it is difficult to gain optimal solutions if there is a transportation governed by the economy of scale principle in the supply chain, or the size of the problem is increased. Thus, heuristic algorithms based on simulated annealing and genetic algorithm are suggested to find good solutions in the reasonable time.
As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.