• Title/Summary/Keyword: Maintenance expenses

Search Result 157, Processing Time 0.022 seconds

A Study on the Selection of Aircraft MRO using AHP (계층분석방법을 이용한 항공기 기체 MRO 업체 선정요인에 관한 연구)

  • Choi, Sejong;Kim, Woojin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.4
    • /
    • pp.82-88
    • /
    • 2015
  • Airframe maintenance is regarded the most important maintenance action in airlines as the aircraft is the most valuable asset in their operation though the volume of airframe maintenance is the last in MRO market. In the selecting process of airframe MRO provider many kinds of evaluation criteria should be considered such as quality, expenses, TAT, capability, and customer support. This paper will suggest the way to select the airframe MRO in airlines and MRO business sectors using AHP.

A Study on the Time Series Analysis of Defect Maintenance Cost in Apartment House according to the Actual Use Data (실적자료에 의한 공동주택 하자보수비용의 시계열적 분석)

  • Song, Dong-Hyun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.177-178
    • /
    • 2011
  • Recently a great deal of people are taking legal action against the housing provider due to the defects of their Apartment house. And most of the housing companies are spending a huge amount of expenses and efforts to keep their brand value. This essay will carry out time series analysis the 20 housing district which are constructed by huge construction companies. This analysis itemised by metropolitan area(Seoul) and others to keep the degree of reliability, and converted future defect maintenance cost into current cost applied by discount rate to figure out suitability of defect maintenance cost. Even though, this essay is not able to represent standard of defect maintenance cost due to the insufficiency of record, while it will be assisted as a referance when long-term record of time series is estabilished.

  • PDF

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

Estimation of National Loss Expenses to Insufficient Safety Inspection and Precision Safety Diagnosis (부실 정밀점검 및 정밀안전진단의 국가적 손실비용 추정)

  • Ha, Myung-Ho;Park, Jong-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.246-253
    • /
    • 2010
  • National major facilities have been rigorously investigated using regular safety inspections and precision safety diagnosis since the Special Law for Facilities Safety Management was made in 1995. However, the process of safety inspection and precision safety diagnosis could be doubted due to intervention of facility owner for safety level evaluation, competition to obtain low price order, and low technical skills of inspection companies. Although the management processes for evaluating the inspection companies were used for several years, the process should continue to improve in the safety inspection field. This study analyzed the recent evaluation system and the ratios of insufficient inspection. Estimation of national loss expenses to the insufficient safety inspection was investigated to recognize the necessity for the improvement of facility inspection process and evaluation system.

Development of Cost-Benefit Analysis Model for GIS Projects (GIS사업의 비용편익분석 모형개발)

  • Kim, Jung-Ok;Heo, Yong;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.1 s.28
    • /
    • pp.79-85
    • /
    • 2004
  • The GIS(Geographic Information System) projects require big initial investment and cost of maintenance. Decision makers would not launch GIS projects unless they are convinced of the benefits of the projects. Therefore the purpose of this paper is to develop an appropriate model for GIS project evaluation. We proposed a GIS project evaluation model and summarize the steps involved in Cost-Benefit Analysis(CBA). The costs of a GIS implementation include hardware and software cost, costs of database development, training expenses, annual maintenance expenses, and other annual expenses. The benefit by using GIS has been assessed into Type I(direct benefits), Type II(indirect benefits), Type III(benefits that result from the sale of information services), Type IV(intangible benefits).

  • PDF

A Study on High-Speed Railway Track Maintenance Scheduling Using ILOG (ILOG를 이용한 고속선 궤도 유지보수 일정계획에 관한 연구)

  • Nam, Duk-Hee;Kim, Ki-Dong;Kim, Sung-Soo;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1177-1190
    • /
    • 2010
  • The high-speed railway track occurs train operating result track irregularity, subsidence of the track, ballast abrasion. This is the unusual condition. High-speed railway track maintenance task is the behavior which repairs unusual section by using the human resource or machine resource. The resource used to maintenance task is restrictive. A resource can be efficiently used if the high-speed railway track maintenance scheduling is used. So the more task can be performed in the fit time. In conclusion, this manages the unusual condition of a track efficiently. So additional expenses is minimized cause by deteriorating unusual condition. And it offers comfortable ride to passenger. However, maintenance scheduling has to reflect well practical situation and environment. That's maintenance scheduling is used. We gather the opinions of the hands-on workers. So in this paper define field situation and condition. And suggest mathematical model about this. And we developed the track maintenance scheduling software engine using ILOG.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

A Profitability Analysis of Sixteen Oriental Medicine Hospitals (한의과대학부속 한방병원의 손익분석 - 2007~2009년도 7개 대학의 16개 부속한방병원을 중심으로 -)

  • Lee, Woo-Cheon;Lee, Sun-Dong;Kim, Jin-Hyun
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.15 no.2
    • /
    • pp.145-155
    • /
    • 2011
  • The purpose of this paper is to review the profitability of sixteen university hospitals of oriental medicine during 2007~2009. Data was collected from 16 hospitals that reveal financial statements to the public and the hospitals were classified into 7 groups. Net sales and COGS per 100 beds of the 7 groups were analyzed to measure profitability and as a percentage of net sales, the rates of personnel expenses, maintenance costs, and material costs were evaluated. The results showed that six groups had consecutively recorded net loss in medical services and differences in profitability among 7 groups were substantial. The analysis showed the profitability was significant for medium-sized hospitals. The rates of personnel expenses in net sales were above 50% in 6 groups with net loss and one group with net profit was 45%. This result indicate the rate of personnel expenses in net sales could be the main factor affecting profitability and further studies are recommended to analyze the determinants of profitability in oriental medical hospitals.

A Study on the Maintenance and Management of Geochanghyanggyo Local Confucian School during the Latter part of Joseon Dynasty (조선후기 거창향교의 유지와 관리)

  • Song, Hye-Young
    • Journal of architectural history
    • /
    • v.30 no.2
    • /
    • pp.45-54
    • /
    • 2021
  • During the latter part of Joseon Dynasty, Local Confucian School(Geochanghyanggyo) had served as a government school and left many official documents on the educational construction. The construction of Local Confucian School(Geochanghyanggyo), which was recorded in official documents, was diverse, and most of them were reconstructed. Construction-works recorded in an official document was drafted in two ways. One was in the same format as the accounting records and the other was written in the diary format by date. The construction cost was mainly financed by selling the land owned. Of course, with the help of the government, they could receive some of the essential timber and expenses for the construction. The management and maintenance of educational construction was entrusted by a manager called 'Chaji(次知)'. Then there were employees called 'Jeonjik(殿直)' and 'Gojik(庫直)' and they were paid for their work.

A Study on the Maintenance and Management of Local Confucian School architecture in the 1910s (1910년대 향교(鄕校) 건축의 유지와 관리에 대한 연구)

  • Song, Hye-Young
    • Journal of architectural history
    • /
    • v.30 no.6
    • /
    • pp.23-32
    • /
    • 2021
  • This study was described with a focus on the maintenance and management of Local Confucian School(Hyanggyo) architecture, centering around cases investigated through official documents written in the 1910s. In 1910, by the Japanese imperial rule, the regulations on Local Confucian School(Hyanggyo) property were enacted, and the income was paid solely to elementary school education expenses and ancestral rites. Through this process, many Local Confucian School(Hyanggyo) buildings were destroyed while only the space for ritual sacrifices remained by the Japanese colonial rule. In particular, as the land, which was the basis of Local Confucian School's property, was sold for various reasons, the finances gradually deteriorated. In addition, as the architectural acts that Local Confucian School preserves itself are restricted, it loses its original character. This study was of great significance that identified the intention to dispose of Local Confucian School(Hyanggyo) property by Japanese imperialism in the 1910s and clarified the purpose of its disposal.