• Title/Summary/Keyword: Maintenance discharge

Search Result 177, Processing Time 0.029 seconds

Estimation of Maintenance Flow for Suitable Utilization of Fishway (어도의 적절한 이용을 위한 유지유량 평가)

  • Kim, Seok-gyu;Kim, Chul;Kim, Seonghwan;Ko, Kwangyong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.281-287
    • /
    • 2009
  • Achieved monitoring regularly about fishway that is a intake dam belongings to Kyeongchon for 5 years. Result that achieve monitoring, discovered pressing issue of opening and closing degree of discharge control part in fishway. In this research, analyze discharge relation with fishway and intake sluice and presented operation plan of opening and closing of discharge control part. Investigated necessity intake discharge and benefited area to analyze relation of discharge that is flowed in fishway and discharge escaping by intake sluice. When opened discharge control part step by step gradually, analyzed discharge. Compared with survey discharge making ration curve of fishway and intake sluice using orifice and submerged weir formula. Because operation of intake dam is necessary intake discharge and upriver inflow discharge by time, operation uses by survey discharge and calculated opening discharge of fishway by opening discharge of intake sluice via monthly inflow discharge. To sum up, calculated floodgate opening height of fishway by water level to present maintenance standard of intake dam.

Estimation of River Ecological Flow in the Downstream Section of Seomjingang Dam (섬진강 댐 하류 구간에서의 하천 생태유량 산정)

  • Bae, Jeonga;Lee, Chanjoo;Kim, Jin Kwan
    • Journal of The Geomorphological Association of Korea
    • /
    • v.28 no.2
    • /
    • pp.1-13
    • /
    • 2021
  • It is very important to secure sufficient river maintenance flow for the ecosystem, since the ecosystem in the downstream section of the dam is greatly affected by the stream maintenance flow from the dam. However, the amount of discharge from the Seomjingang Dam is decreasing year by year, this study estimated the ecological flow required for the downstream section of the Seomjingang Dam, which is known as the habitat of the endangered Acheilognathus somjinensis, in order to secure the river flow of the Seomjingang Dam. For this purpose, the proper discharge was calculated using the PHABSIM model, which is a hydrological survey and physical habitat simulation method, and the proper discharge of other fish species were also comprehensively reviewed. As a result of this study, the current river maintenance flow at the Seomjingang Dam partially satisfies the ecological maintenance flow including the Acheilognathus somjinensis in the downstream section of the Seomjingang Dam. However, this is recognized as the minimum discharge to maintain the ecology in the downstream section of the Seomjingang Dam, and it would be more desirable to secure larger river maintenance flow than this. This study can contribute the determination of the river maintenance flow of the Seomjingang Dam by proposing the river maintenance flow considering the fish habitat environment in the river.

Water Resources Utilization Pattern of JangSung Reservoir (장성호 수자원 이용 패턴)

  • Yoon, Kwang-Sik;Han, Kuk-Heon;Yoon, Suk-Gun;Jung, Jae-Woon
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.291-294
    • /
    • 2003
  • The Water resources utilization pattern of Jangsung reservoir was studied. The observed precipitation and existing reservoir operation data such as irrigation amount, reservoir storage, river maintenance requirement, flood control discharge were collected for ten years period and analyzed. Major findings of this study are as follows: The observed average, minimum, maximum annual precipitation were 905.1mm, 1,977.3mm, 1,554.3mm during study period, respectively. The average annual irrigation amount was 554.5mm, irrigation amount of drought years of '92 and '94 was 604.6mm, 679.2mm, respectively. However, irrigation amount of extended drought year '95 was 384.9mm. It showed that supplying capacity of Jangsung reservoir was limited when consecutive 2 year drought occurred. The main water resources usage of Jangsung reservoir was irrigation, but flood control discharge exceed irrigation amount exceptionally when high precipitation occurred. The reservoir operation record revealed that discharge for river maintenance was delivered even drought years.

  • PDF

Analysis of Sediment Discharge by Long-term Runoff in Nakdong River Watershed using SWAT Model (SWAT 모형을 이용한 낙동강 유역의 장기 유출에 따른 유사량 분석)

  • Ji, Un;Kim, Tae-Geun;Lee, Eun-Jeong;Ryoo, Kyong-Sik;Hwang, Man-Ha;Jang, Eun-Kyung
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.723-735
    • /
    • 2014
  • Sediment discharge by long-term runoff in the Nakdong River watershed should be predicted for the maintenance and management of the Nakdong River newly changed by the four major river restoration project. The data establishment by the analysis of runoff and sediment discharge using the long-term watershed model is necessary to predict possible problems by incoming sediments and to prepare countermeasures for the maintenance and management. Therefore, sediment discharges by long-term runoff in the main points of the Nakdong River were calculated using SWAT(soil and water assessment tool) model and the relations and features between rainfall, runoff, and sediment discharge were analyzed in this study. As a result of sediment discharge calculation in the main points of the Nakdong River and tributaries, the sediment discharge at the outlet of the Naesung Stream was greater than the Jindong Station in the Lower Nakdong River from 1999 to 2008 except the years with low precipitation. The sediment discharge at the Nakdong River Estuary Barrage (NREB) was corresponding to 20% of the Jindong Station which is located about 80 km upstream from NREB.

Surface Discharge Characteristics in Different Media (이종절연재의 연면절연특성)

  • Shin, Sung-Ha
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.15 no.2
    • /
    • pp.49-54
    • /
    • 2012
  • With the improvement of industrial society, the high quality electrical energy, simplification of operation and maintenance, ensuring reliability and safety are being required. This paper reviews a basic data of the surface discharge characteristics for teflon resin in not only pure $N_2$, $N_2:O_2$ mixture gas and Dry-Air as being focused on environmentally friendly insulating Gas also $SF_6$. Used electrodes are Knife to Knife. With the changing distance of electrodes and pressure, we can find it, surface discharge voltages and surface dielectric strengths, respectively. Surface discharge Voltages of $N_2:O_2=80:20$ mixture gas are more higher than the $N_2:O_2$ Mixture gases.

Identification of Partial Discharge Defects based on Back- Propagation Algorithm in Eco-friendly Insulation Gas

  • Sung-Wook Kim
    • Journal of information and communication convergence engineering
    • /
    • v.21 no.3
    • /
    • pp.233-238
    • /
    • 2023
  • This study presents a method for identifying partial discharge defects in an eco-friendly gas insulated system using a backpropagation algorithm. Four partial discharge (PD) electrode systems, namely, a free-moving particle, protrusion on the conductor, protrusion on the enclosure, and voids, were designed to simulate PD defects that can occur during the operation of eco-friendly gas-insulated switchgear. The PD signals were measured using an ultrahigh-frequency sensor as a nonconventional method based on IEC 62478. To identify the types of PD defects, the PD parameters of single PD pulses in the time and frequency domains and the phase-resolved partial discharge patterns were extracted, and a back-propagation algorithm in the artificial neural network was designed using a virtual instrument based on LabVIEW. The backpropagation algorithm proposed in this paper has an accuracy rate of over 90% for identifying the types of PD defects, and the result is expected to be used as a reference database for asset management and maintenance work for eco-friendly gas-insulated power equipment.

The Noise Removal Methode of Partial Discharge Signal (부분방전 신호 검출 시 노이즈 제거방법)

  • Choi, Mun-Gyu;Cha, Hanju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.8
    • /
    • pp.1436-1441
    • /
    • 2016
  • Currently, partial discharge diagnosis in the field of prevention applied technology and diagnostic equipment is a possible strong limit to remove the noise generated by external or internal I still have one unreliable diagnosis. This technology is the noise removal from signal the time lag analysis algorithms technique is applied by a fundamental. Increasing the reliability in terms of technology spectrum frequence of analysis method for by applying the acquisition through the position of the frequency content and sources of traffic lights partial discharge of the acquisition of signal analysis to judge whether a way diagnosis the environment of the scene, and conditions. Partial discharge signal and make the discharge while building blocks were found through the Analysis. Spectrum frequence of Analysis and wide discharge part, to be more precise, in line with the various functions, including the analysis technique band. Diagnosis and comes up with advanced technology that can detect the presence of a position. This method is portable single device developed for maintenance and mobility and ease and convenience of getting caught by discharge of the pattern analysis and position detection method suitable for a new diagnosis will suggest.

A Development of Measuring Instrument of Portable Partial Discharge for Diagnosis of GIS Installation and Application (GIS 설비 진단을 위한 포터블 부분방전 측정장치 개발 및 응용)

  • Kim, Jong-Seo;Kim, Jin-Tea;Shin, Heung-Sik;Lee, Heung-Jea
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.2
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, to the development of a highly information-oriented society to a large increase in dependence on power, Accordingly, it is need that active development and spread of preservation technology on accident prevention in operation electrical equipment. However, to lack of the use on maintenance technology of power equipment and to increase of power usage is growing deterioration of power equipment, this is a cause on casualties, property damage and the occurrence of disasters is a growing. GIS equipments which are operated from domestic except the equipment which manages from the big business are depend on a most visual inspection, and do inspection method or measuring instrument etc. a condition which is not supplied widely. Currently, many to measure instrument used in domestic is very expensive or foreign, it will be able to substitute this, the development necessity of the diagnosis technique and the measuring instrument is demanded.

Test of a Physical Habitat Model for Stream Restoration : A Case Study on Midstream of Anyang-Cheon (생태하천복원을 위한 물리서식처 모형의 적용 : 안양천 중류를 대상으로)

  • Baek, Kyong Oh;Kim, Chang Hwan
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.1
    • /
    • pp.35-41
    • /
    • 2015
  • This study focuses on whether a physical habitat model, River2D, is useful to assess and design stream restoration. To achieve the aim, the habitat suitability for Zacco Platypus was analyzed using River2D at midstream of the Anyang-Cheon through modifying the low flow channel and changing the flow discharge. The River2D simulation results show that the inhabited environment for Zacco Platypus is improved by increasing the sinuosity of the low flow channel, and vice versa. Also the inhabited environment for Zacco Platypus gets worse when there is no additional flow for maintenance water supply at the stream flowing through cities. In this respect, the physical habitat simulation study based on the River2D model is useful because it provides a practical guidance in designing stream restoration.

A Study of Electrical and Optical Method of Safety Standards for diagnosis of Power Facility using UV-IR Camera (UV-IR 카메라를 이용한 전력설비 진단을 위한 전기 및 광학적 안전 기준 설정 연구)

  • Kim, Young-Seok;Kim, Chong-Min;Choi, Myeong-Il;Bang, Sun-Bae;Shong, Kil-Mok;Kwag, Dong-Soon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.54-61
    • /
    • 2013
  • UV-IR camera is being used for predictive maintenance of high voltage equipment together with measurement of temperature on localized heat and corona discharge. This paper was suggested the judgement method that is the discharge count, UV image pattern and discharge matching rate to apply the UV-IR camera on power facility. The discharge count method is counted by UV image pixel value. the UV image pattern method is determined by the UV image shape using neural network algorithm method, separated by Sunflower, Jellyfish, Ameba. The UV discharge matching is compare the breakdown the UV image size and measuring UV image size according to distance.