• Title/Summary/Keyword: Maintenance cost

Search Result 2,595, Processing Time 0.025 seconds

The Life Cycle Cost Estimation using the Maintenance Information of a Propulsion Control System in the High Speed Train(KTX-1) (고속철도차량(KTX-1) 추진제어장치의 유지보수정보를 이용한 수명주기비용 예측)

  • Kim, Jae-Moon;Yun, Cha-Jung;Kim, Yang-Su;Jang, Jin-Yeong;Lee, Jong-Seong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2176-2181
    • /
    • 2011
  • This paper estimates the life cycle cost(LCC) of a propulsion control system using the maintenance information in the high speed train(KTX-1). Life cycle costing is one of the most effective approaches for the cost analysis of long-life systems such as the KTX-1. Until now, most life cycle cost of the system has been studied as a whole system viewpoint. But in case of railway industry, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. This paper proposes the life cycle cost model which fitted to estimate life cycle cost (LCC) using maintenance information manual. As a result, LCC on propulsion control system increased moderately expect for periodical time when major parts are replaced at the same time. Results will be reflected in the development of domestic products.

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

Analysis of Factors and it's Effectiveness to Maintenance Cost of Public Buildings (공공청사의 운영비용에 영향을 미치는 요인과 요인별 영향력 분석)

  • Ko, Kyujin;Cho, Sangouk;Hwang, Jeongha;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.29-37
    • /
    • 2015
  • Multi-household buildings are efficiently maintained from the mid- and long-term viewpoint according to the long-term repair coverage system etc. On the other hand, public buildings are not systematically maintained due to a lack of past maintenance cost data and inefficient budget plans, among other problems. Targeting public buildings in Incheon, this study analyzed operation costs variables. To verify the analysis results, they underwent a correlation analysis and a multi-regression analysis. With regard to public buildings electricity, gas and tap water cost, the influence power of the served life, floor area, and workforce were analyzed, revealing that electricity cost was highly correlated with workforce, while gas and tap water cost were correlated with tap water cost. Also, the correlation analysis results were verified through a multi-regression analysis, and a maintenance cost estimation model was presented using a regression equation.

A Study on the Forecasting Model of the Required Cost for the Long-term Repair Plan in Apartment housings (공동주택의 장기수선계획 소요비용 예측모델 연구)

  • Lee, Kang-Hee;Yoo, Uoo-Sang;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.11 no.3
    • /
    • pp.63-68
    • /
    • 2011
  • Building deterioration would be proceeded by various causes such as physical, social, economic degradation. The deterioration would be inevitably prevented or delayed to get the decent function and performance in various building part and components. The maintenance and management are continued to provide the decent living condition for the household. The maintenance means mainly a repair, including the on-time and longterm plan. The longterm repair would be conducted by the systemic preparation in management activity and a required cost. Therefore, the annual due for the longterm repair plan is important to prepare the repair cost in a required time. In this paper, it aimed at analyzing the longterm repair cost and modelling to forecast the required cost in total area, number of household and time elapse in apartment housing. The estimation model of a repair cost is used with a power function which has a good statistics. Results of this study are shown that the sample has a longterm repair due in a $2,032won/m^2{\cdot}yr$ averagely which is higher than $912won/m^2{\cdot}yr$ in domestic. Second, the longterm repair due is proportionally correlated with the time elapse in both a total area and the number of household. Third, the estimation model for the longterm repair amount is suitable for the power function which is most in any other estimation models. Fourth, the ration of the longterm plan repair due a year to the cumulated longterm amount is about 26%.

A Study on the Scheduling of Planned Maintenance for Multicomponent System with Hidden Failures : Focusing on Inspection Cost (다품목 시스템의 Hidden Failure를 고려한 계획정비 스케줄링에 관한 연구 : 검사비용을 중심으로)

  • Kim, Mansoo;Hyun, Do Kyung;Kim, Sung Hwan;Ji, Woong Ki;Kwon, Ki-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.149-158
    • /
    • 2019
  • The scheduling of planned maintenance problem of a system consisting of a number of components was studied. The purpose of maintenance scheduling is to minimize the cost of maintaining long-term operations. On the system side, the cost of a system shutdown can be minimized by grouping and inspecting a number of components. In addition, proper inspection cycles can be selected for each component to identify the failure sufficiently early to minimize the cost of the failure. To reduce the complexity of the calculations, the 'base interval approach' used in previous studies was applied and, in addition, the inspection cost savings from simultaneous inspections of multiple components were considered. To compare the effectiveness of inspection cost savings, this paper presents the results of simulation analysis performed by referring to the cases in the existing studies.

A Basic Study on the Development of O&M Cost Assessment Model to Improve Operational Efficiency of Large Public Research Infrastructures (CAM) (대형 공공연구인프라의 운영 효율성 제고를 위한 운영 및 유지관리비 평가모델 개발 기초연구)

  • Choi, Sun-Ah;Son, Seung-Hyun;Lee, Sung-Ho;Oh, Oum-Joong;Han, Bum-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.93-94
    • /
    • 2021
  • The Korean government has invested a tremendous amount of money in the last 10 years to build large public research infrastructures (LPRI). For efficient operation and maintenance of LPRI built with expensive equipment and professional engineers, reasonable budget needs to be allocated. However, it is difficult to fulfill sustainable operation and maintenance (O&M) because there is no standard on budgeting for efficient LPRI operation, including expensive equipment and manpower allocation. There have been a lot of cost assessment studies regarding O&M of high-demand facilities such as hospitals, hotels and residential buildings, but a very few on sustainable O&M of LPRI. Therefore, mid/long-term budget establishment plans for efficient LPRI O&M are required from the initial planning stage and a cost assessment model to support the plans should be developed. The objective of this paper is to propose a cost assessment model for sustainable operation and maintenance of large public research infrastructures. To do so, actual O&M data of 6 LPRI types in operation are collected, and regression analysis model (RAM) is used for development and evaluation a cost assessment model. The study result will support sustainable operation of LPRI from a business perspective and be used as basic data for continuous development of cost assessment models to establish budgets for LPRI operation from an academic perspective.

  • PDF

Optimization of Cost and Downtime for Periodic PM Model Following the Expiration of Warranty

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.19 no.2
    • /
    • pp.587-596
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policies following the expiration of warranty: renewing warranty and non-renewing warranty. After the warranty period is expired, the system undergoes the PM periodically and is minimally repaired at each failure between two successive PMs. Firstly, we determine the expected cost rate per unit time and the expected downtime per unit time for the periodic PM model. Then the overall value function suggested by Jiang and Ji(2002) is applied to obtain the optimal PM period and the optimal PM number. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

Maintenance Limit Renewal Policy for Inferiority System based on Opportunity Cost (기회비용을 고려한 열화시스템의 보전한계갱신정책)

  • 박상민;김연수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.233-242
    • /
    • 1994
  • This study deals with the derivative adverse minimum for inferiority system depends on continuose operating under infinite planning horizon. This planning will be accomplished by maintenance limit renewal policy in consideration of opportunity cost which affects system by failure during operation periods and expected cost under nomal operation states. By the results, we will be expected incresing total efficiency for the system by optimal renewal policy.

  • PDF

Basic Train of Thoughts for the Construction of Low Cost Scenery Spots

  • Duanmu, Shan
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.213-218
    • /
    • 2001
  • To many developing countries like China, the practical way to constant development of city construction is low consuming. The basic methods of low-cunsuming landscape construction: 1) Low building consumption: Decreasing construction quantity. Using low-costing material. Designing low-consuming landscape. Reusing of building material. 2) Low energy consumption: Decreasing water consumption. Consuming and enrichment of earth fertilizer. Decreasing electrical consumption. 3) Low maintenance: Adapting natural material. Using local plants. Special design to decrease maintaining. Because of many reasons, China has not yet adapting Low-consuming Landscape Construction.

  • PDF

Optimal production cost evaluation model of cogeneration system for buildings including maintenanace scheduling (보수계획을 고려한 건물용 열병합 발전의 최적 운전비용 산출 모델)

  • Kim, Y.S.;Park, J.S.;Yu, J.S.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.559-561
    • /
    • 1995
  • The cogeneration system has a strong merit in providing thermal and electrical energy simultaneously. Nowadays, cogeneration system is widely used in the point of efficient use of the energy resources And the installation of the system is expected to be greatly increased in each year. So, we need to develop an optimal operation planning for those systems. In this paper, we are used to result what studed at the my power system of room because it is in order to solve maintenance scheduling problem. Also we added a constraints to the proposed maintenance model for optimal maintenance rate. In the case study, we construct an multi-machine generated example system which operated in topping cycle, and calculate the yearly optimal production cost, marginal maintenance cost, and maintenance scheduling of the example system respectively.

  • PDF