• Title/Summary/Keyword: Maintenance and Repair

Search Result 1,061, Processing Time 0.023 seconds

Development of PEID for Acquiring Maintenance Information during Product Lifecycle of Marine Vessels (선박해양구조물의 제품수명주기 내 유지보수 정보 획득을 위한 PEID에 관한 연구)

  • Jeon, Jeong-Ik;Lee, Jang-Hyun;Son, Gum-Jun
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.63-72
    • /
    • 2012
  • The product lifecycle of a marine vessel can be classified into the design-production, operation-maintenance, and disposal phases. During the operation and maintenance phase, status data should be gathered from the major machinery and instruments installed on the marine vessel in order to perform efficient maintenance work. Although a PLM (product lifecycle management) system can manage the product information during the design and assembly stage, a PLM based on asset management technology is more appropriate for product information management during the operation stage. Product embedded information devices (PEIDs) are suggested for gathering real-time maintenance information during the operation and maintenance lifecycle. A PEID allows PLM to provide the capability of offering active information exchange between the lifecycle management system and equipment. This study designed a PEID to effectively obtain information and interact with a PLM system. It consists of sensors, wireless communication, and a micro-processor, which allow it to accumulate status data on the PLM system. The embedded information device and PLM enable the seamless information flow, tracking, and updating of MRO (maintenance repair and overhaul) information for a product throughout the middle of the product lifecycle.

Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive (입환기관차의 LCC 평가분석)

  • Bae Dae-Sung;Chung Jong-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.3
    • /
    • pp.260-266
    • /
    • 2005
  • The deterioration of a shunting locomotive was characterized for the lifetime assessment. The locomotive has been used for shunting works in steel making processes, and in this investigation, various types of technical evaluation methods for the locomotive parts were employed to assess the current deterioration status and to provide important clue for lifetime prediction. Unlike other rolling stocks in railway applications, the diesel shunting locomotive is composed of major components such as diesel engine, transmission, gear box, brake system, electronic devices, etc., which cover more than 70 percent of the total price of the locomotive. Therefore, in this paper, each part of major components in the diesel locomotive was analyzed in terms of the degree of deterioration. The lift-cycle-cost (LCC) analysis was performed based on the maintenance and repair history as compared with economical cost to provide the cost-effective prediction, i.e., to assess either repair for reuse or putting the locomotive out of service based on cost-effective calculation.

Properties of the material on stainless steel propeller shaft with the weld working (스테인리스강 프로펠러축의 가공에 따른 재질특성에 관한 연구)

  • Son, Yeong-Tae;Choung, Kwang-Gyo;Lee, Myeong-Hoon
    • Journal of Korea Ship Safrty Technology Authority
    • /
    • s.24
    • /
    • pp.4-20
    • /
    • 2008
  • Stainless steel 304 or stainless steel 630 types using propeller shaft of a small ship or a FRP fishing boat generally restrain localization corrosion and abrasion damage occurrence to shaft bearing or grand packing contact. In general, the residual stress which remains after welding or heat treatment in material can cause the stress concentration or localization corrosion. In case of small ship, stainless steel such as STS304 has long been used for propeller shaft. Meanwhile, crew of small ship tend to reuse damaged propeller shaft after repair by welding and performing heat treatment to save cost. However, it was found that reused propeller shaft by repair often caused troubles in ship's operation. In this study, the basic guideline for maintenance and treatment of propeller shaft are investigated. From the results of investigation, remarkable deterioration of the material properties and corrosion resistance on the welded work part was observed.

  • PDF

A Study on the Evaluation Method of Water Leakage Repair in Polyacrylic Resin (폴리 아크릴 레진의 누수 보수 평가에 관한 연구)

  • Cho, Il-Kyu;Kim, Keun-Hur;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.223-224
    • /
    • 2017
  • In this study, various materials such as epoxy material, urethane material, cement material, and acrylic material are used to solve the water leakage occurring in underground structures. However, in the reality that the durability is insufficient and the effect is insufficient, it is aimed to improve the repairing effect by using cement and acrylics in combination. As a first study, we tried to verify the performance of improve the performance by checking the product properties according to the composition ratio of polyacrylic resin. Polyacrylic resin is evaluated in three different composition ratios. When the material is selected for polyacrylic resin, it is applied to the field to understand the maintenance effect and durability.

  • PDF

Practical Model to Estimate Road User Cost for Bridge Maintenance Strategy (교량 유지관리 전략 수립을 위한 실용적 도로이용자비용 추정 모델)

  • Park, Kyung-Hoon;Sun, Jong-Wan;Lee, Sang-Yoon;Lee, Jong-Soon;Cho, Hyo-Nam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.6
    • /
    • pp.131-142
    • /
    • 2007
  • The road user cost in indirect costs as well as direct costs such as the inspection/ diagnosis cost and the repair/reinforcement cost should be considered as one of the important items in the life-cycle cost-effective design and maintenance of the bridges. To estimate the road user cost, this paper formulates the road user cost as a sum of the user delay cost and the vehicle operating cost considering the detour effect. A numerical traffic simulation and a regression analysis are performed to develop a regression model due to a time delay. The proposed regression model is applied to the generation of the maintenance strategy based on the life-cycle cost and performance, and its effectiveness and applicability is investigated. The road user cost has a great influence on establishing the maintenance strategy, and the proposed regression model could be successfully utilized to estimate the road user cost of a bridge.

A Study on the Development of Remodeling Items for Apartments (공동주택 리모델링 항목개발을 위한 조사연구)

  • 이미정;주서령
    • Journal of the Korean housing association
    • /
    • v.13 no.2
    • /
    • pp.7-14
    • /
    • 2002
  • The deteriorated high-rise apartments make a social problem in now days. As a result, an new alternative plan for deteriorated high-rise apartments such as the remodeling concept must be considered. This study aims to develop the remodeling items which is the guide lines when remodeling of the apartment will be conducted. Thorough the previous case studies of maintenance and repair status of the deteriorated apartments in Seoul, the analysis of the period of repair and improvement and the degree of request far remodeling items, reasonable guidelines for selection of remodeling items were developed. According to the ages of apartments As a result of the study, basic guidelines fur selection of remodeling items were proposed.

Research about point adhesion disconnection type non-exposure composition waterproof method of construction development that use embossing PVC sheet (엠보싱 PVC 시트를 이용한 부분절연(部分絶緣) 블록형 옥상(屋上) 비노출 복합방수(複合防水)공법 개발(開發)에 관(關)한 연구(硏究))

  • Wi, Tae-Hwan;Kang, Hyo-Jin;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.37-40
    • /
    • 2003
  • This present paper mainly contains adhesion part disconnection type exposure composition waterproof method using embossing PVC sheet. The existing polymer resin coating and sheet waterproofing construction method have, however, some weak point such as being decrease life cycle of concrete with water leaking from materials be affected by crack and movement dash bond concrete through the whole-adhere construction. Above the reason, this paper has particular method increasing crack-defending performance from stress occurred concrete movement by part disconnection, adds maintain waterproofing performance subordinate sheet, that can be contributed a convenience of maintenance which is decreasing industrial waste and repair construction cycle through the part repair in case of leaking water.

  • PDF

Research about point adhesion disconnection type non-exposure composition waterproof method of construction development that use embossing PVC sheet (엠보싱 PVC 시트를 이용한 부분절연 블록형 옥상 비노출 복합방수공법 개발에 관한 연구)

  • 위태환;강효진;오상근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.37-40
    • /
    • 2003
  • This present paper mainly contains adhesion part disconnection type exposure composition waterproof method using embossing PVC sheet. The existing polymer resin coating and sheet waterproofing construction method have, however, some weak point such as being decrease life cycle of concrete with water leaking from materials be affected by crack and movement dash bond concrete through the whole-adhere construction. Above the reason, this paper has particular method increasing crack-defending performance from stress occurred concrete movement by part disconnection, adds maintain waterproofing performance subordinate sheet, that can be contributed a convenience of maintenance which is decreasing industrial waste and repair construction cycle through the part repair in case of leaking water.

  • PDF

Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive (입환기관차의 LCC 평가분석)

  • Chung Jong-Duk;Kim Jeong-Guk;Pyun Jang-Sik;Kim Pil-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.551-556
    • /
    • 2004
  • The deterioration of a shunting locomotive was characterized for the lifetime assessment. The locomotive has been used for shunting works in steel making processes, and in this investigation, various types of technical evaluation methods for the locomotive parts were employed to assess the current deterioration status and to provide important clue for lifetime prediction. Unlike other rolling stocks in railway applications, the diesel shunting locomotive is composed of major components such as diesel engine, transmission, gear box, brake system, electronic devices, etc., which cover more than 70 percent of the total price of the locomotive. Therefore, in this paper, each part of major components in the diesel locomotive was analyzed in terms of the degree of deterioration. The life-cycle-cost (LCC) analysis was performed based on the maintenance and repair history as compared with economical cost to provide the cost-effective prediction, i.e., to assess either repair for reuse or putting the locomotive out of service based on cost-effective calculation.

  • PDF

A Study on Economic Feasibility of Highway Maintenance Considering Carbon Amount by Using KPRP (Korea Pavement Research Program) (탄소량을 고려한 도로 유지보수 경제성에 관한 연구: KPRP (Korea Pavement Research Program) 활용)

  • Nguyen, Dinh Thanh;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.879-890
    • /
    • 2017
  • The US Pavement Design method (AASHTO) and HDM-4, a road pavement maintenance decision system, are not suitable for domestic pavement design, construction and maintenance. KPRP(Korea Pavement Research Program) has been developed to reflect Korea's environmental conditions and vehicle characteristics, thereby, extending pavement life. The main objective of this study is to select the best alternative through Life Cycle Cost $CO_2$ (LCCC) calculations among three representative maintenance strategies using KPRP design software since the environment cost resulting from the extended pavement life will also differ. The analysis of this study illustrates that cumulative carbon emissions for 40 years in alternative 2 (Cutting and Overlaying at Year 30) is the lowest option among them, and the basic cost of $CO_2$ emission by various road maintenance and repair work can be used for suggesting an optimal maintenance strategy for highway agency.