• Title/Summary/Keyword: Maintenance Priority Grade

Search Result 13, Processing Time 0.023 seconds

The Hazard Grade Classification Criterion using Character of Collapsed Cut Slope by Rainfall (강우에 의해 붕괴된 절토사면의 특성을 이용한 절토사면 위험등급 분류기준)

  • Yoo, Ki-Jeong;Koo, Ho-Bon;Baek, Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.600-605
    • /
    • 2004
  • The road construction with horizontal expansion of country using and augmentation of traffic demand is advanced actively and it accompanies hereupon, the above of 70% of the country is formed at the mountain in our country where the hazard cut slope has been created. In this study, It is prepared a effective management countermeasure of cut slope introduced priority investigation decision method against hazard cut slope which is influenced by abnormally rainfall by an unusual change in the weather such as a guerilla rainfall character. In meaning link, It was executed collapse cause by failure character analysis in the cut slope which has failed for the last five years and it is prepared the hazard grade criterion from E to A grade according to collapse cause. It is decided that a maintenance management grade by the hazard grade classification criterion of cut slope. So It is possible to hazard cut slope. It is established failure protection counter countermeasure by effective maintenance management through the hazard grade c1assification criterion and it will be able to dispose to advanced nation level like Hong Kong and Japanese.

  • PDF

A study on the Longitudinal Force Variation of CWR according to the Condition of Track Maintenance (궤도보수 작업 조건별 장대레일 축력변화에 관한 연구)

  • Won, Yong-Hoan;Kim, Kwan-Hyung;Kwon, Soon-Jung;Lee, Seung-Youl
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.99-105
    • /
    • 2009
  • This research presents the method to decide proper locations for destressing of CWR using a non-destructive equipments to measure the longitudinal force(installation temperature) in CWR. The effect and necessity of destressing were analyzed by estimating changes of longitudinal force. The installation temperature was measured to find changes of longitudinal force in high speed and conventional lines before and after destressing or track maintenance at the locations where destressing was planed or where change of longitudinal force was expected during track maintenance. Past destressing was carried out within qualitative decision criteria. This research proposes the quantitative criteria to decide the priority order of the destressing locations reasonably by considering the difference of air temperature and stress free temperature during the track maintenances, the grade of ballast resistance force recovering and the length of destressing, etc.

  • PDF

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.

Proposed Information Management Plan for Building Inspection and Maintenance Based on COBie-IM and BIM (COBie-IM 및 BIM 기반 건축물 점검 및 유지보수 정보관리방안 제시)

  • Lee, Chaewon;Kim, Sangyong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.57-68
    • /
    • 2023
  • To maintain the normal function of an aging building, regular inspection, repair, and reinforcement must be performed. However, the form of information and decision-making generated in the current building maintenance stage still depends on inefficient methods. This causes an increase in cost and waste of time in building maintenance. Therefore, this study proposed a COBie-IM document for building inspection and maintenance information management by benchmarking COBie, and suggested a method of checking information by linking it with BIM. In addition, a method for visualizing the designation of colors according to the damage grade of defects occurring in the building was suggested. Through this, we are able to systematically integrate and manage the information generated during inspection and maintenance in the building maintenance stage. This is expected to increase work efficiency by supporting decision-making that determines the priority of repair and reinforcement for defects.

A Study of Improvement of Urban Pavement Maintenance Technique based on Pavement Condition Evaluation and FWD Data (도로포장 표면조사와 FWD정보에 기반한 도심지 도로포장 유지보수 기법 개선방안 연구)

  • Lee, Sangyum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.532-541
    • /
    • 2016
  • The objective of this paper is to support accurate pavement condition assessment and decision of proper maintenance method and time by conducting visual inspection and calculating the remaining life of pavement from falling weight deflectometer(FWD) data. Each was implemented in the same long-term performance pavement(LTPP) sections. Visual inspection was executed to measure pavement condition indices such as crack, rutting and international roughness index(IRI) and the Seoul Pavement Index(SPI) was calculated based on these results. The dynamic modulus was back-calculated from the FWD data. The remaining pavement lives were determined from equivalent single axle loading(ESAL) and FWD data. Correlation of maintenance priority by each result value was examined. Consequently, the correlation between remaining life to Crack and Rutting was higher than the other factors or indicesbecause IRI is not related to FWD value and SPI value consists with IRI value and other indices. The R-square value of correlation of FWD with Crack and Rutting was 0.65, which indicated an insufficient correlation. Consequently, when decision of maintenance of method, time, etc. is determined, FWD data have to be considered with Crack and Rutting because of those relations.

A Study on the Status Analysis of Cut Slope in Gyeongnam Region (경남지역 절취사면의 현황분석에 관한 연구)

  • Park, Jin-Kyu;Park, Choon-Sik;Jang, Jeong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.862-869
    • /
    • 2005
  • This study examined 233 cut slopes in Gyeongnam region; evaluated hazards and slope conditions involved in the slope; and determined the priority order for reinforcement. The conclusions are summarized in the following. (1) The slopes that need reinforcement or maintenance are 153, accounting for 65.6% of the entire slopes. Slopes with a length of $0{\sim}200m$ account for 70.9%; slopes with a height of $10{\sim}20m$ account for over 50%. (2) Slopes with slope of more than 1:0.5 account for 70.9% of the entire slopes. The steepness of the slope is owing to more rock slopes than soil slopes. (3) The percentages of rock slopes, soil slopes, complex slopes mixed with rocks and soil, and slopes comprised of igneous rocks are 54.4%, 24.9%, 20.7%, and 54.1%, respectively. (4) In the rock area occurred cave-in, plain failure, wedge failure, and overturning failure, in order. Slopes with volcanic rocks are the most unstable, while sedimentary rocks and metamorphic rocks are relatively stable. (5) When the slope height is over 20m, low grade slopes are more than 80%; leading to the conclusion that the higher the slope height is, the more unstable the slope is.

  • PDF

A Study on Condition Assessment of the General National Road Bridge Deck (일반국도상 교량 바닥판의 상태 현황분석 연구)

  • Oh, Kwang Chin;Lee, Jun Gu;Shin, Ju Yeoul;Chang, Buhm Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.6
    • /
    • pp.93-101
    • /
    • 2012
  • Bridge deck has a role in a comfortable and safe passage of vehicles. At the same time, it preserves upper structure against the abrasion and shearing due to impact of traffic loads in bridges or has a role to protect the plate from off adverse effect of climatic process as rain, chemicals. Currently, the total number of inspected bridges is 6,248 in the general national road and to maintain effectively, Introduction of GPR system mounted in the vehicle has been considered. In this research, the comparison and analysis of bridge deck condition on general national road has been performed with major variations of superstructure type, span lengths, located region and ages by using 'the current status of road bridge and tunnel' that is provided by MLTM(Ministry of Land, Transport and Maritime Affairs). As a result, Condition assessment grade, superstructure type, age and length were derived as a major factor to determine priority for the condition assessment.

Sewer CCTV Inspection Prioritization Based on Risk Assessment (위험도 기반의 하수관로 CCTV 조사 우선순위 결정 연구)

  • Son, Jooyoung;Lee, Jaehyun;Oh, Jeill
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.3
    • /
    • pp.585-592
    • /
    • 2017
  • Most sewer lines buried in the city are likely to be collapsed due to serious aging. Also, due to the high concentration of development and high population density and traffic, the collapse of the sewer will cause enormous social and economic damage. Therefore, proactive maintenance is required to prevent accidents caused by deteriorated sewer pipe. In order to utilize limited budget effectively, risk-based prioritization methods should be proposed that simultaneously consider the consequence of failure and the probability of failure. In this study, the method of risk-based prioritization of sewer was examined by reviewing various cases of overseas studies and applied to the urban sub-catchment. First, the impact factors that can be secured through the sewer GIS DB in Seoul were derived, and the weight, sub-criteria, and impact score of each impact factor were determined and the consequence of failure was calculated by weight sum method. In addition, the probability of failure was calculated by dividing the service life by the estimated useful life, and the consequence of failure and the probability of failure were classified into five grades by the Jenks natural breaks classification method. The prioritization method was applied to sub-catchment in the Seoul to derive a risk matrix and a risk grade. As a result, 26% of all subjects were selected as the inspection priority subjects with 4-5 risk grade. Therefore, using the risk-based CCTV prioritization methodology, it will be possible to systematically determine the objects that need investigation first.

Improvement Plan through Investigation and Analysis of Road Signs of National Highway (일반국도 도로표지 조사 및 분석을 통한 개선방안 도출)

  • Lee, Woo-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.8
    • /
    • pp.604-609
    • /
    • 2019
  • A variety of complaints about road signs have occurred for various reasons, such as new road facilities, new road signs such as road name signs, and an increase in nearby important facilities. In addition, there are many road signs that are in violation of road sign regulations. The basic principles of road signs, the connectivity of guide names, the location suitability, and a consistent road sign guidance system have not implemented. To solve these problems, various errors were investigated on major road signs on eight national highways, including direction signs, distance signs, boundary signs, and route signs. In addition, we classified the errors on road signs by grade to give them maintenance priority. We also analyzed the error status of signs for each route and grade. Based on the data, the problems of the road signs were derived, and an improvement plan is discussed. Based on this research, more systematic installation and management of road signs through cooperation between the government and local governments could increase the efficiency of road signs, as well as provide safer and more convenient road sign guidance systems for road users.

The Development of Vulnerable Elements and Assessment of Vulnerability of Maeul-soop Ecosystem in Korea (한국 마을숲 생태계 취약요소 발굴 및 취약성 평가)

  • Lim, Jeong-Cheol;Ryu, Tae-Bok;Ahn, Kyeong-Hwan;Choi, Byoung-Ki
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.34 no.4
    • /
    • pp.57-65
    • /
    • 2016
  • Maeul-soop(Village forest) is a key element of Korean traditional village landscape historically and culturally. However, a number of Maeul-soops have been lost or declined due to various influences since the modern age. For this Maeul-soop that has a variety of conservation values including historical, cultural and ecological ones, attention and efforts for a systematic conservation and restoration of Maeul-soop are needed. The purpose of the present study is to provide information on ecological restoration and sustainable use and management of Maeul-soops based on component plant species, habitat and location characteristics of 499 Maeul-soops spread throughout Korea. Major six categories of threat factors to Maeul-soop ecosystem were identified and the influence of each factor was evaluated. For the evaluation of weight by threat factors for the influence on the vulnerability of Maeul-soop ecosystem, more three-dimensional analysis was conducted using Analytic Hierarchy Process (AHP) analysis method. In the results of evaluation using AHP analysis method, reduction of area, among six categories, was spotted as the biggest threat to existence of Maeul-soops. Next, changes in topography and soil environment were considered as a threat factor of qualitative changes in Maeul-soop ecosystem. Influence of vegetation structure and its qualitative changes on the loss or decline of Masul-soop was evaluated to be lower than that of changes in habitat. Based on weight of each factor, the figures were converted with 100 points being the highest score and the evaluation of vulnerability of Maeul-soop was conducted with the converted figures. In the result of evaluation of vulnerability of Maeul-soops, grade III showed the highest frequency and a normal distribution was formed from low grade to high grade. 38 Maeul-soops were evaluated as grade I which showed high naturality and 10 Maeul-soops were evaluated as grade V as their maintenance was threatened. Also in the results of evaluation of vulnerability of each Maeul-soop, restoration of Maeul-soop's own area was found as top priority to guarantee the sustainability of Maeul-soops. It was confirmed that there was a need to prepare a national level ecological response strategy for each vulnerability factor of Maeul-soop, which was important national ecological resources.