This article was prepared for the purpose of reviewing maintenance plans and strategies for designating the celadon kiln site in Banam-ri, Gochang, a monument designated by the city and province as a historical site. Prior to the discussion, the high academic potential of this site, which is attracting attention as a main point of early celadon main point, was explained, and expectations for the future designation of the monument were reviewed. Next, the current status of preservation and maintenance plans of the celadon kiln site in Banam-ri, Gochang were examined. In particular, the current preservation situation was reviewed through an on-site survey on how the ruins, which have not been designated as a monument, should be maintained for historical designation in the future. Above all, it was argued that it was necessary to conduct excavation and literature surveys to clarify the characteristics of the ruins, investigate the surrounding areas, improve information facilities for visitors, and carry out promotion in connection with them. Finally, the definition of historical sites and the status of historical designation of ceramic kilns, along with the strategies necessary for designation, were presented. In particular, the examples of the existing historical designated celadon kiln site in Dotong-ri, Jinan, and Buncheong Kiln Site in Undae-ri, Goheung were reviewed, and three types of excavation surveys, literature surveys, and academic conferences were presented as the target directions for historical designation. The result of the excavation survey is the basis for suggesting that it has cultural property values with completeness, authenticity, and identity. The literature survey is the basis for supplementing the historical and cultural character of the remains that have not been revealed by excavation. The academic conference explained that it is an opportunity to understand the nature and value of cultural assets, such as the location of cultural assets, the status of relics, and events related to relics.
Hydraulic transmission is the main component delivering power to the drive wheels of an excavator during forward and backward movement, and it has low speed, high torque and high speed, low torque gear change ratios as a forward/backward two-speed main function. It also has additional function of ensuring that the excavator is stably fixed on the ground with the built-in parking brake during excavation operations. In this study, optimal design specifications are determined by modeling and simulating about the multi-disc-type friction clutch, which is the main component improving the reliability of the hydraulic transmission for a 14-ton wheel excavator, and the friction properties of the transmission clutch are analyzed by performing sample tests.
It was identified by the excavation that architecture remains were confirmed buddhist temple consist of ruins of main building of a temple, auditorium site, ruins of stone pagoda, embankment, pedestrian Facilities and drainage etc. in the Gwangmyeong-dong site. The site has been held temple arrangement with 1 main building of a temple, twin Pagodas from the Unified Silla period to Goryeo dynasty. The temple constructed after that was destroyed the architecture in the Unified Silla period. It seems that aristocrat or royalty power of within group of the nearby remains of city which was constructed in the Unified Silla period build and visit the temple. Considering there are excavations, it assumes that the temple had been constructed during the last days of the Unified Silla, was closed up during the mid-Goryeo Dynasty.
This paper presents the results of a three-dimensional numerical investigation into the mechanical mechanism of main tunnels and cross passage construction. Aimed at the complex space structure composed of two main tunnels and cross passage, 3D numerical model of the structure and surrounding rock was built to analyze the influence. Comparative analysis of different buried depths were carried out. The results of the study indicate that the stress concentration was occurred in the intersecting linings, especially in the opening side lining, which leads to an unfavorable form of force that is pulled up by the upper and lower sections in the intersecting linings due to the construction of the cross passage. The excavation of the cross passage also destroys the stability of the original soil layer and causes settlement of the surface and main tunnels. Practical implications of the findings are discussed.
Lee, Chang Il;Kim, Eun Kyum;Park, Jong Sik;Lee, Yong-Joo
Geomechanics and Engineering
/
v.15
no.5
/
pp.1061-1070
/
2018
The main purpose of retaining wall methods for deep excavation is to keep the construction site safe from the earth pressure acting on the backfill during the construction period. Currently used retaining wall methods include the common strut method, anchor method, slurry wall method, and raker method. However, these methods have drawbacks such as reduced workspace and intrusion into private property, and thus, efforts are being made to improve them. The most advanced retaining wall method is the prestressed wale system, so far, in which a load corresponding to the earth pressure is applied to the wale by using the tension of a prestressed (PS) strand wire. This system affords advantages such as providing sufficient workspace by lengthening the strut interval and minimizing intrusion into private properties adjacent to the site. However, this system cannot control the tension of the PS strand wire, and thus, it cannot actively cope with changes in the earth pressure due to excavation. This study conducts a preliminary numerical analysis of the field applicability of the controllable prestressed wale system (CPWS) which can adjust the tension of the PS strand wire. For the analysis, back analysis was conducted through two-dimensional (2D) and three-dimensional (3D) numerical analyses based on the field measurement data of the typical strut method, and then, the field applicability of CPWS was examined by comparing the lateral deflection of the wall and adjacent ground surface settlements under the same conditions. In addition, the displacement and settlement of the wall were predicted through numerical analysis while the prestress force of CPWS was varied, and the structural stability was analysed through load tests on model specimens.
Journal of Korean Tunnelling and Underground Space Association
/
v.22
no.5
/
pp.575-589
/
2020
In recent years, Shield TBM construction has been continuously increasing in domestic tunnels. The main excavation tool in the shield TBM construction is a disc cutter which naturally wears during the excavation process and significantly degrades the excavation efficiency. Therefore, it is important to know the appropriate time of the disc cutter replacement. In this study, it is proposed a predictive model that can determine yes/no of disc cutter replacement using machine learning algorithm. To do this, the shield TBM machine data which is highly correlated to the disc cutter wears and the disc cutter replacement from the shield TBM field which is already constructed are used as the input data in the model. Also, the algorithms used in the study were the support vector machine, k-nearest neighbor algorithm, and decision tree algorithm are all classification methods used in machine learning. In order to construct an optimal predictive model and to evaluate the performance of the model, the classification performance evaluation index was compared and analyzed.
Proceedings of the Korean Geotechical Society Conference
/
2002.10a
/
pp.303-310
/
2002
Overbreak occurred inevitably in a tunnel excavation, Is the main factor for increasing cost and time in tunnel projects. Furthermore the damage to the remained rock mass related to the overbreak can give rise to a serious safety problem in tunnels. As a rule of thumb, causes for the overbreak are inaccuracy in drilling, the wrong design of blasting and selection of explosives, and heterogeneity in rock mass. Specially, the geological features of the rock mass around periphery of an excavation are very important factors, so a lot of researches have been conducted to describe these phenomena. But the quantitative geological classification of the rock mass for the overbreak and the method for decreasing the amount of the overbreak have not been established. Besides, the technical improvement of the charge method is requested as explosives for the smooth blasting have not functioned efficiently. In this study, the working face around periphery of an excavation has been continuously sectionalized to 5∼6 parts, and the new Blastability Index for the overbreak based on 6 factors of RMD(Rock Mass Description), UCS(Uniaxial Compressive Strength) JPS(Joint Plane Spacing), JPO(Joint Plane Orientation), JPA(Joint Plane Aperture) and FM(Filling Material) is proposed to classify sections of the working face. On the basis of this classification, the distance between contour holes and the charging density are determined to minimize the overbreak. For controlling the charging density and improving the function of explosives, the New Deck Charge(N.D.C) method utilizing the deck charge method and detonation transmission in hole has been developed.
One of the main causes of gas pipeline accidents is mechanical impact(third party damage). The majority of high pressure gas pipelines buried in major domestic industrial complexes are old pipes which have being operated over 20 years. Therefore, if an accident occurs, there will be a full scale accident because there is no additional inspection and reinforcement time. In this study, the defects on the piping during the mechanical impact were studied through the third party damage(excavation) experiments. Experiments were carried out using the 21 ton excavator which is operated in the actual excavation work and the type of pipe to be struck are ASTM A106 Grade.B and ASTM A53 Grade.B. As a result, when the bucket used during excavator operation is a sawtooth bucket, the defect is more bigger. And the smaller the diameter of the pipe, the smaller the depth and length of the defect. Also, it was confirmed that the impact height had no effect on the defects on the buried pipe, during the excavation work.
Population concentration in urban areas has led traffic management a central issue. To mitigate traffic congestions, the government has planned to construct large-cross-section tunnels deep underground. This study focuses on estimating the damage caused to frame structures owing to tunnel excavation. When constructing a tunnel network deep underground, it is necessary to divide the main tunnel and connect the divergence tunnel to the ground surface. Ground settlement is caused by excavation of the adjacent divergence tunnel. Therefore, predicting ground settlement using diverse variables is necessary before performing damage estimation. We used the volume loss and cover-tunnel diameter ratio as the variables in this study. Applying the ground settlement values to the settlement induction device, we measured the extent of damage to frame structures due to displacement at specific points. The vertical and horizontal displacements that occur at these points were measured using preattached LVDT (Linear variable differential transformer), and the lateral strain and angular distortion were calculated using these displacements. The lateral strain and angular distortion are key parameters for structural damage estimation. A damage assessment chart comprises the "Negligible", "Very Slight Damage", "Slight Damage", "Moderate to Severe Damage", and "Severe to Very Severe Damage" categories was developed. This table was applied to steel frame and concrete frame structures for comparison.
Landslides triggered by the combination of heavy precipitation and anthropological disturbance in hilly areas cause severe damage to human lives, properties, and infrastructure constructions. A comprehensive investigation of the influencing factors and failure mechanisms of landslides are significant for disaster mitigation and prevention. This paper utilized the combination of detailed geological investigation, physical experimental testing as well as numerical modelling to determine the failure mechanism, and proposed a countermeasures of the Lantian landslide occurred on 2, July 2017. The results reveal that the Lantian landslide is a catastrophic reactivated slide which occurred in an active tectonic region in Southwest China. Because of the unique geological settings, the fully to highly weathered basalts in the study area with well-developed fractures favored the rainwater infiltration, which is the beneficial to slide reactivation. Engineering excavation and heavy precipitation are the main triggering factors to activate the slide motion. Two failure stages have been identified in the landslide. The first phase involves a shallow mass collapse originated at the upper slopes, which extends from the road to platform at rear part, which is triggered by excavation in the landslide region. Subjected to the following prolonged rainfall from 19 June to 2 July, 2017, the pore water pressure of the slope continually increased, and the groundwater table successively rise, resulting in a significant decrease of soil strength which leads to successive large-scale deep slide. Thereinto, the shallow collapse played a significant role in the formation of the deep slide. Based on the formation mechanisms of the landslide, detailed engineering mitigation measures, involving slope cutting, anchor cable frame, shotcrete and anchorage, retaining wall and intercepting ditch were suggested to reduce the future failure risk of the landslide.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.