Traditional standards and specifications for concrete have largely been prescriptive, (or prescription-based), and can sometimes hinder innovation and in particular the use of more environmentally friendly concretes by requiring minimum cement contents and SCM replacement levels. In December 2004, the Canadian CSA A23.1-04 standard was issued which made provisions (a) for high-volume SCM concretes, (b) added new performance requirements for concrete, and (c) clearly outlined the requirements and responsibilities for use in performance-based concrete specifications. Also, in December 2003, the CSA A3000 Hydraulic Cement standard was revised. It (a) reclassified the types of cements based on performance requirements, with both Portland and blended cements meeting the same physical requirements, (b) allows the use of performance testing for assessing sulphate resistance of cementitious materials combinations, (c) includes an Annex D, which allows performance testing of new or non-traditional supplementary cementing materials. From a review of international concrete standards, it was found that one of the main concerns with performance specifications has been the lack of tests, or lack of confidence in existing tests, for judging all relevant performance concerns. Of currently used or available test methods for both fresh, hardened physical, and durability properties, it was found that although there may be no ideal testing solutions, there are a number of practical and useful tests available. Some of these were adopted in CSA A23.1-04, and it is likely that new performance tests will be added in future revisions. Other concerns with performance standards are the different perspectives on the point of testing for performance. Some concrete suppliers may prefer processes for both pre-qualifying the plant, and specific mixtures, followed only with testing only 'end-of-chute' fresh properties on-site. However, owners want to know the in-place performance of the concrete, especially with high-volume SCM concretes where placing and curing are important. Also, the contractor must be aware of, and share the responsibility for handling, constructability, curing, and scheduling issues that influence the in-place concrete properties.
최근 공공공사에서 공기지연은 지속적으로 발생하고 있으나 책임 미 이행으로 인하여 당사자의 손해 발생은 물론 클레임 및 분쟁으로 비화될 가능성이 점차 커지고 있다. 이는 현행 공정관리가 책임구분이 불가능한 문제점을 내포하고 있어 공기지연이 반복적으로 발생되며, 당사자의 책임이행도 불가능하게 만들고 있기 때문이다. 따라서 공기지연의 반복적 발생을 예방하고 공기지연에 대한 당사자의 능동적 책임이행을 위하여 책임구분이 가능한 공기지연관리 방안의 마련이 매우 필요한 실정이다. 이러한 관점에서 본 연구는 건설현장에서 쉽게 활용할 수 있는 지연사유에 대한 사전적 관리 개념을 도입한 공기지연 사유 관리 모델을 제시하였다. 제시한 모델은 첫째, Cell 개념의 사유 세분화 및 계층화를 통한 사유의 근본 원인을 파악하기 용이하게 하였으며, 둘째, 발주자, 시공자, 제3자로 업무 수행 절차를 구분함으로써 지연사유를 명확하게 구분할 수 있게 하였다. 셋째, Matching 시스템을 통한 사유, 일수 및 해당근거를 연계함으로써 클레임에 대한 명확성을 제시할 수 있도록 하였다.
현대의 건축공사는 고층화 추세에 따라 반복공정의 수가 증가하여 작업 연속성에 대한 계획 및 공사관리가 중요하게 인식되고 있다. 특히, 많은 반복공정이 동시에 수행되는 마감공사는 작업흐름의 관리에 따라 전체공사에 큰 영향을 미치므로 작업 연속성에 대한 계획이 필요하다. 마감공사의 합리적 운영을 위해 작업연속성을 확보하여 목표공기를 달성하는 기법인 택트 공정관리에서는 택트타임을 설정하여 반복작업의 작업편차를 일정하게 하여 공사계획을 수립한다. 그러나, 기존 택트공정 관리와 관련된 연구는 작업구역분할, 작업일보, 택트 공정관리 프로세스 등을 수행하였지만 작업 연속성 확보를 위한 택트타임에 대한 연구는 충분히 수행되어 있지 않은 실정이다. 따라서 본 연구에서는 3점추정견적 방법에 의한 택트타임의 설정방법과 작업기간 조정절차를 제시하여 택트타임 기반의 공정계획수립 방법을 제시하였으며, 이와 같은 방법에 의한 택트공정 계획 수립을 통해 목표공기가 지연되지 않음을 입증하였다.
본 논문은 철도차량분야에 적용할 소프트웨어 Escrow의 상세 적용 절차에 대하여 논의하고자 한다. 철도차량 발주자는 차량의 소프트웨어 포함 장치에 대한 하자보증 기간(warranty period) 이후의 소프트웨어 변경 및 유지보수성 확보를 위하여 소스코드, 핵심적인 기술 원천정보 등을 요구하고 있다. 한편, 소프트웨어 개발 업체는 소스코드 등이 업체의 지적 재산권에 해당하는 사안이기 때문에 시행청의 요구사항을 만족하기 어려운 실정이다. 그러므로, 주 계약자인 철도차량 제작자는 소프트웨어 개발자와 사용자 간의 다른 입장을 조율하기 위하여, 소프트웨어 Escrow 서비스 제도를 도입해야 할 필요성이 있다. 소프트웨어 Escrow는 소프트웨어 Escrow 패키지(소프트웨어 소스코드, 소프트웨어 개발 툴, 빌드 프로세스, 독점권을 가진 정보, 저작권 등)의 거래 시, Escrow 계약 문서에 대한 서명을 통한 Escrow 계약 조건을 상호 합의한 후 신뢰성 있는 제3의 기관에 관련 기술 자료 등을 예치해 두는 양자 간 상생협력을 위한 제도이다. 본 논문에서는 다음의 Escrow 진행 절차에 대한 상세 내역을 연구하고, 향후 프로젝트 적용 방안을 제안하고자 한다.
건축공학을 전공한 학생들이 보유해야할 CAD 활용능력을 조사하기 위해 제주지역 중소규모 건설회사를 대상으로 설문을 실시하였다. 소규모 건설회사는 CAD 소프트웨어를 사용하여 기존 도면을 수정하고 있다. 또한 지방의 국립대학의 CAD 수업현황을 분석하였다. 기존의 CAD 수업은 4시간 또는 6시간으로 진행하고 있으며 AutoCAD를 주로 사용하고 있다. CAD 수업은 6시간 실습이 필요하다고 판단되며 2D 도면 작성이 주요 실습내용이 되어야 하고 3D 모델 작성도 수업에 편성되어야 한다. 수업의 결과를 평가할 수 있는 방법의 개선도 필요하며, 인터넷을 활용하거나 스마트폰을 이용한 실시간 피드백을 대안이 될 수 있다.
건설 프로젝트에 있어 노무관리는 주요 공사관리 요소임에도 불구하고 다양한 사업주체의 참여, 작업공정의 복잡성 및 일회성 채용 방식 등으로 인하여 효율적으로 운영되지 못하고 있는 실정이다. 대부분의 현장에서 수집되고 있는 노무정보들은 해당 현장의 기간별 노무자 투입정보 및 노무비 지급을 위한 공수 산정의 기초 자료로 활용될 뿐, 단위작업과의 연계를 통한 다양한 공사관리 정보로 활용되지 못하고 있는 한계성을 지니고 있다. 건설 프로젝트를 수행함에 있어 단위작업을 중심으로 발생되는 노무자의 작업정보는 해당 프로젝트의 생산성, 공정 및 원가정보와 연계되는 원천데이터로 정의될 수 있으므로 보다 적극적인 노무관련 정보의 수집과 가공을 위한 관리체계의 개발이 요구된다. 따라서 본 연구에서는 정보기술을 활용하여 단위작업을 중심으로 발생되는 노무관련 정보를 수집하고 이를 생산성 데이터로 가공하여 공정 및 노무비용과 연계하는 정보기술 기반의 노무정보관리 시스템을 제시하고자 한다.
Journal of Construction Engineering and Project Management
/
제2권2호
/
pp.18-27
/
2012
Despite the rapid development in the construction industry due to the changing new technologies, many projects still fail to meet target deadlines. Shortage in manpower and skilled laborers is one of the main reasons for such delays. Markets with high economic growth and economic expansion (such as Gulf Countries in the Middle East) may have pronounced labor the shortages. Labor subcontracting practices are used sometimes to increase production rates and meet project deadlines. This paper explains and analyses labor subcontracting practices currently being used in many places around the world (and especially in the Gulf Countries) and in particular defines a maximum overtime rate for laborers in the laborer-subcontracting method ensuring that the contractor gains both the time saved during overtime and also reduces the cost per unit produced. The mathematical model used formalizes a closed-form equation for overtime pay in similar situations and as such can be applicable worldwide. Data was collected from representative projects that employed such practices from various trades. Validation of the model and formula has been tested successfully by analyzing historic data. The results prove that contractors often do not reach the optimum use of their practices resulting in a higher cost per unit. The presented model and the analysis should be of interest to many contractors currently involved in the practice or considering its use and to those who wish to find new methods that would help in eliminating as much wastes as possible by allocating their resources in the most efficient way.
This study is aimed to identify the color characteristics of the current Korean Brand Apartment, focused on the color of kitchens and dining rooms in the cyber model houses. The Brands which were selected for this study ranked from first to fifth in the contractor ranking and now account for 64 percent of the apartments in sale in Seoul and Gyeonggi Province. In addition, the size between $99m^2$ and $165m^2$ were selected, because it was most preferred at the 2011 survey for user preference on the size of apartment. As this study is for the colors shown on the monintor, colors were extracted from the images of web site with L*, a*, b*. And then, they were converted to Munsell values through computer program, which values were used to identify the color characteristics of hue, tone and to apply the theory of Moon Spencer. The result of the study on the color characteristics of the kitchen and dining room of the five brands' apartments is as follows. Regarding the color use, most of the brands used Y and YR color while as the accent color, P, PB and G were used. This result of main color use for hue was same as the guideline by the literature review, but color for tone showed the difference between brands and the difference between sizes. Next, regarding the color combination, first ambiguity of color harmony was shown the most. And the larger the size was, the more the contrast of color harmony was shown. It means that the color tone had close relation with the sizes of households.
최근 건설 프로젝트의 효율적인 관리를 위해 현장에서 각 사업주체(발주, 설계, 감리, 시공, 협력업체)간 원활한 의사소통, 협업, 정보공유 및 교환을 위하여 사업관리시스템인 PMIS(Project Management Information System)를 많이 사용하고 있다. 그러나 이러한 개별 프로젝트단위로의 시스템 개발은 회사 전체 프로젝트관리 효율성 및 통합화에 저해요인으로 지적되고 있다. 이는 프로젝트단위로 개발되는 사업관리시스템의 특성상 전사차원의 시스템개발 및 보급을 위한 Master Plan인 ISP(Information Strategy Plan) 즉 정보화 전략의 수립의 부재에 기인한다고 볼 수 있다. 본 논문은 실제 대형 건설회사인 국내 D건설사의 PMIS구축을 위한 정보화전략계획(ISP) 수립방법 및 절차의 사례를 소개하고 전사 PMIS구조, 전사업무프로세스 개선과 시스템 구축방법 및 성공요소 등을 제시한 논문이다. 이 연구 논문을 통해 향후 건설회사의 사업관리 시스템 구축 시 효율적인 PMIS개발과 최적화시스템을 구축에 도움이 되고 정보화 전략계획 수립에 활용 할 수 있기를 기대한다.
The 9th International Conference on Construction Engineering and Project Management
/
pp.823-830
/
2022
The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.