• Title/Summary/Keyword: MMRE

Search Result 8, Processing Time 0.023 seconds

An Empirical Study of SW Size Estimation by using Function Point (기능점수를 이용한 소프트웨어 규모추정 실증연구)

  • Kim, Seung Kwon;Lee, Jong Moo;Park, Ho In
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.115-125
    • /
    • 2011
  • An accurate estimation of software development size is an important factor in calculating reasonable cost of project development and determining its success. In this study, we propose estimation models, using function point based on the functional correlation between software, with empirical data. Three models($FP_{est}(I)$, $FP_{est}(II)$, $FP_{est}(III)$) are developed with correlation and regression analysis. The validity of the models is evaluated by the significance test by comparing values of Mean Magnitude of Relative Error (MMRE) and predictions of each model at level n%. Model $FP_{est}(III)$ proved to be superior to other models such as IFPC(Indicative Function Point Count), EFPC(Estimated Function Point Count), EPFS(Early Prediction of Function Size), $FP_{est}(I)$, and $FP_{est}(II)$. As a result, the accuracy of the model appears to be very high to determine the usefulness of the model to finally overcome weakness of other estimation models. The model can be efficiently used to estimate project development size including software size or manpower allocation.

A Gompertz Model for Software Cost Estimation (Gompertz 소프트웨어 비용 추정 모델)

  • Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.15D no.2
    • /
    • pp.207-212
    • /
    • 2008
  • This paper evaluates software cost estimation models, and presents the most suitable model. First, we transformed a relevant model into variables to make in linear. Second, we evaluated model's performance considering how much suitable the cost data of the actual development software was. In the stage of model performance evaluation criteria, we used MMRE which is the relative error concept rather than the absolute error. Existing software cost estimation model follows Weibull, Gamma, and Rayleigh function. In this paper, Gompertz function model is suggested which is a kind of growth curve. Additionally, we verify the compatability of other different growth curves. As a result of evaluation of model's performance, Gompertz function was considered to be the most suitable for the cost estimation model.

Energy Efficient Cross Layer Multipath Routing for Image Delivery in Wireless Sensor Networks

  • Rao, Santhosha;Shama, Kumara;Rao, Pavan Kumar
    • Journal of Information Processing Systems
    • /
    • v.14 no.6
    • /
    • pp.1347-1360
    • /
    • 2018
  • Owing to limited energy in wireless devices power saving is very critical to prolong the lifetime of the networks. In this regard, we designed a cross-layer optimization mechanism based on power control in which source node broadcasts a Route Request Packet (RREQ) containing information such as node id, image size, end to end bit error rate (BER) and residual battery energy to its neighbor nodes to initiate a multimedia session. Each intermediate node appends its remaining battery energy, link gain, node id and average noise power to the RREQ packet. Upon receiving the RREQ packets, the sink node finds node disjoint paths and calculates the optimal power vectors for each disjoint path using cross layer optimization algorithm. Sink based cross-layer maximal minimal residual energy (MMRE) algorithm finds the number of image packets that can be sent on each path and sends the Route Reply Packet (RREP) to the source on each disjoint path which contains the information such as optimal power vector, remaining battery energy vector and number of packets that can be sent on the path by the source. Simulation results indicate that considerable energy saving can be accomplished with the proposed cross layer power control algorithm.

A Study for Enhancing the Criterion of the Software Cost Estimation (소프트웨어 개발비 대가기준 개선에 관한 연구)

  • Kwon, Ki-Tae;Byun, Boon-Hee
    • The KIPS Transactions:PartD
    • /
    • v.13D no.6 s.109
    • /
    • pp.815-822
    • /
    • 2006
  • It is very important that they accurately predict the software development cost in the early stage of a software development. Because cost estimations are required when bidding for a contract or determining whether a project is feasible in terms of a cost-benefit analysis. The criterions of the software cost estimation was set up to calculate software development cost more exactly, which is applied to made up a budget of the software business or to calculate a suitable cost to start the business in our country. However, as the software technology and environment are changing very rapidly, it need to enhance the criterion of the cost estimation continuously. Therefore, we tried to apply technology of software and a variety of factors of environment changes in present. Most of all, we proposed an introduction and readjustment of the adjustment factor applying 14 general system characteristics to improve the accuracy of the cost estimation and the schedule adjustment factor that is required by practicians. For evaluating the accuracy in terms of the real data, we have used MMRE & PRED. In result, we proved that the accuracy was clearly improved by applying the scale factor and readjusted VAF with 14 general system characteristics. Moreover, we evaluated the accuracy of the schedule adjustment factor.

An Empirical Study on Pricing Model for Software Operation (소프트웨어 운영 대가산정 방식에 대한 실증적 연구)

  • Kim, Heungshik;Kim, Choong Nyoung;Seo, Yongwon
    • Journal of Information Technology Services
    • /
    • v.18 no.4
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.

An Estimating Method for Software Testing Manpower (소프트웨어 시험 인력의 추정 방법)

  • Park Ju-Seok
    • The KIPS Transactions:PartD
    • /
    • v.11D no.7 s.96
    • /
    • pp.1491-1498
    • /
    • 2004
  • Successful project planning relics on a good estimation of the manpower required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software manpower estimation models are present only the total manpower or instantaneous manpower distribution according to the testing time for the software life-cycle. This paper suggests the manpower estimating models for software testing phase as well as testing process and debugging process in accordance with de-tected faults. This paper presents the polynomial model for effort based on testing and debugging faults. These models are verified by 5 different software project data sets with coefficient of determination and mean magnitude of relative error for adaptability of model.

Developing an R&D CER Using Historical Defense Weapon System Data in Korea (한국 무기체계 개발 실적을 고려한 연구개발 비용추정관계식 개발)

  • Eo, Won-Jae;Lee, Yong-Bok;Kang, Sung-Jin
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.55-62
    • /
    • 2010
  • Currently, cost estimation is very important to the government acquisition programs to support decisions about funding and to evaluate resource requirement as key decision points. Parametric cost estimating models have been used extensively to obtain appropriate cost estimates in early acquisition phase. However, they have many restrictions to ensure the cost estimating result in Korean defense environment because they are developed in the U.S.A. environment. In order to obtain a good R&D cost estimate, developing our own CERs (Cost Estimation Relationships) using historical R&D data is essential. Nevertheless, there has been little research to develop our own CERs. In this research, we established a CER development process and found some cost drivers in the historical movement weapon system R&D data. The R&D CER is developed using the PCR(Principle Component Regression) method to remove multicollinearity among data and to overcome the restriction of the insufficient number of sample. At least, this research is meaningful as a first attempt in terms of defining the CER development process and obtaining our own R&D CER based on the historical data in Korean weapon system R&D environment.

A Study on Developing the Acquisition Unit Cost Estimating Model of the Guided Weapon System (유도무기 획득단가 추정 모델 개발에 관한 연구)

  • Kim, Yonghyun;Lee, Yongbok;Jung, Wonil;Kim, Dongkyu;Kang, Sungjin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.5
    • /
    • pp.565-576
    • /
    • 2012
  • Cost estimates are necessary for government acquisition program to support decisions about funding, to develop annual budget requests and to validate resource requirements at key decision points. Many researches have been done about cost estimating technique recently. Parametric cost estimating models based on CERs(Cost Estimating Relationships) have been mainly used using regression method with historical data. However, there are many restrictions in developing Korean version CERs because the number of data points are too small. Specially, data collection and data management system are unstable in Korean defense environment, when developing CERs. In this research, we analyzed the historical data, and found some cost drivers in guided weapon system area. We developed the Acquisition Unit Cost CER using the regression to remove multicollinearity in the historical data. So we could overcome the restriction of the insufficient sample number. This research as a first attempt is meaningful in terms of obtaining our own Acquisition Unit Cost CER using historical cost and physical characteristic in Korean development environment.