• 제목/요약/키워드: MIL-HDBK-781

검색결과 2건 처리시간 0.014초

생산 공정 자료 기반 양산단계 전차 전장관리체계 환경 부하 선별 시험 방법 및 적용 개선에 관한 연구 (A study on Mass production stage Tank Battle Management System Environmental Stress Screening test method and application improvement based on Production process data)

  • 김장은;심보현
    • 품질경영학회지
    • /
    • 제43권3호
    • /
    • pp.273-288
    • /
    • 2015
  • Purpose: In this study, we apply environmental stress screening (ESS) to battle management system (BMS) of a tank and use the ESS profile based on production process data, guided by MIL-HDBK-781/344/2164. Methods: To optimize ESS Profile of the BMS of a tank, we estimate ESS model parameters (e.g., defect density, screening strength) using primary production failure reporting and corrective action system (FRACAS) data of military supply contract firm. Results: First, we collect the Primary production FRACAS data of military supply contract firm. Second, we compute curve fitting approach to find patent defect density and latent defect density using FRACAS data. Third, we solve the equation of Defect Density(patent defect density + latent defect density)($D_{IN}$) and Screening Strength(SS) Using second step data. As a result of analysis according to the order, we calculate $D_{IN}$(Temperature stress case : 74.02, Vibration stress : 10.252) and : SS(Temperature stress case : 0.4632, Vibration stress : 0.4142) and confirm the Condition II-D based on MIL-HDBK-344. According to Condition II-D, it is necessary to modify existing ESS profile through decreasing the $D_{IN}$ and increasing the SS. Conclusion: Identification of defect causes through ESS approach reduce defect densities for production. It provides feedback to a lessons-learned data base to avoid similar problems on next generation tank BMS.

와이블 분포에서의 종결형 축차시험방안 (Truncated Sequential Test Plan under Weibull Distribution)

  • 정해성;차명수;오근태
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제3권2호
    • /
    • pp.137-143
    • /
    • 2003
  • Sequential test plans are characterized by decision rules for accepting or rejecting compliance, or continuing the test at my test time. They are determined by selected values of risks and discrimination ratio. The sequential test plans in the international standard such as MIL-HDBK-781A are based on the assumption that the underlying distribution of times between failures is exponential. In this paper, sequential test plans are extended to the Weibull distribution case. Simulation studies are performed to examine the reasonability in this extension.

  • PDF