전환 정액일괄도급 계약방식 프로젝트의 리스크 분석 (Risk Assessment for the Converted Lump-sum Turnkey Project)

  • 황덕진;문승재;유호선
    • 플랜트 저널
    • /
    • 제7권2호
    • /
    • pp.39-43
    • /
    • 2011
  • Due to the recent uncertainty of market situations such as the escalation of petroleum prices, increased production capacities of plants, limitations of the available EPC (Engineering, Procurement, Construction) contractors, and the increase of raw material prices, EPC contractors have had a tendency to include a higher reserve contingency in the lump-sum turnkey contract price. In order to overcome the changes in the market, the plant project construction industry has started to apply the converted lump-sum turnkey contract in plant construction market. This study was focused to find the associated risks and to analyse the identified risks on recent trend of application of the new contract type, which is the converted lump-sum turnkey contract. It was recognized from the analysis that quality and cost have more high priority risks than other project objectives. This paper also suggests the mitigation plan for identified risks to achieve project objectives appropriate to the converted lump-sum turnkey project from the viewpoint of an EPC contractor keeping transparency with owner.

  • PDF

국제합작투자에서 합작파트너 간 내부기술계약과 기술대가 지급방식 선택에 관한 연구 (Licensing Contract between International Joint Venture Partners and Compensation Structure)

  • 이응석
    • 기술혁신연구
    • /
    • 제15권1호
    • /
    • pp.175-201
    • /
    • 2007
  • Licensing contracts between partners in International Joint Ventures(IJV) have not only aspects of relation contract, which is interdependent and long-term cooperative relationships in interpartner but also aspects of discrete contract which is exposed to opportunistic risk caused by IJV partners who maximize individual profit instead of joint payoff maximization. In this circumstance, appropriate compensation structures such as lump-sum and royalty can reduce conflicts and spur interpartner cooperation. In addition, compensation structures that stipulate each party's rights, duties, and responsibilities under various sets of environmental conditions have strong implications for transaction cost minimization and joint payoff maximization. On the other hands, compensation structures such as lump-sum and royalty in IJV licensing contract have benefits and costs depending on IJV partners uncertainty, partner dependency, and environment uncertainty. Therefore, the purpose of this paper is to empirically show how partner uncertainty, partner dependence and environment uncertainty influence compensation structure chosen by licensor in IJV.

  • PDF

계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 - (Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum -)

  • 이유섭;황본강
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.155-163
    • /
    • 2007
  • 건설프로젝트를 수행하는 과정에 있어 계약당사자간에 다양한 계약방식에 기초하여 시설물 건설에 요구되는 업무 또는 서비스를 제공하고 있으나, 건설사업의 주요 성과지표라 할 수 있는 비용, 일정, 안전등의 측면에서 계약방식에 따라 발생할 수 있는 성과의 차이에 대한 실증적 인 비교연구는 미흡한 실정이다. 건설사업이 다수의 건설전문조직과 계약을 기반으로 운영되는 프로젝트라는 특성을 고려할 때 계약방식의 유형에 따라 사업성과에 대한 차이를 비교분석 함으로써 계약방식 선정에 대한 적정 의사결정을 지원하는데 유효한 자료를 제공할 수 있다. 이에 본 연구에서는 건설계약방식 중 실비정산방식과 총액계약방식을 대상으로 건설사업의 주요 성과에 대한 비교 분석을 시도하였다. 계약방식별 프로젝트 성과는 미국 Construction Industry Institute(CII)의 Benchmarking and Metrics(BM&M) 프로그램에서 활용하는 성과측정기준을 기초로 비용, 공정, 안전, 변경, 재작업(rework) 등 5개 분야를 대상으로 하였다. 또한 계약방식으로 인한 각종 성과지표의 차이가 통계적 의미를 지니고 있는가를 판단하기 위하여 통계적 기법인 t-test를 이용하여 데이터의 유의성을 분석하였다.

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

나고야의정서 하에서 생물유전자원 이용의 최적계약 연구 (Optimal Contract under the Nagoya Protocal for the Benefit Sharing)

  • 박호정;정병관
    • 자원ㆍ환경경제연구
    • /
    • 제26권1호
    • /
    • pp.85-101
    • /
    • 2017
  • 나고야의정서 또는 ABS의 목적은 생물유전자원의 이용에 따르는 대가를 실현시킴으로써 생물다양성을 유지하는데 있으나 아직까지 구체적으로 실현된 사례가 드물다. 이는 이익공유 방식을 둘러싼 논란과 생물유전자원 보유국과 이용국 또는 이용기업간의 정보 비대칭이 존재하기 때문이다. 본고에서는 주인-대리인 모형을 이용하여 정보 불확실성 하에서의 이익공유 방식을 분석하였다. 고정지출계약과 매출액 기준 로열티 방식 중 후자의 방식이 생물유전자원의 가치증대와 자원보전 측면에 우수한 인센티브 계약인 것으로 나타났다. 이는 향후 나고야의 정서 하에서 로열티 중심으로 상호협정조건 가이드라인이 마련될 필요가 있음을 시사한다.

불완전(不完全)한 정보하(情報下)의 통화(通貨)의 투자증대효과분석(投資增大效果分析): 중복세대모형(重複世代模型)을 이용한 일반균형적(一般均衡的) 접근(接近) (Money and Capital Accumulation under Imperfect Information: A General Equilibrium Approach Using Overlapping Generations Model)

  • 김준경
    • KDI Journal of Economic Policy
    • /
    • 제14권1호
    • /
    • pp.191-212
    • /
    • 1992
  • 본고(本稿)에서는 채권자(債權者)와 채무자간(債務者間)에 계약불이행문제(契約不履行問題)(contract enforcement problem)가 존재함에 따라 금융시장이 자금중개기능(資金仲介機能)을 원활하게 수행하지 못하는 경제하에서, 자본축적과정(資本蓄積科程)에 있어서 화폐(貨幣)의 역할을 이론적으로 고찰하였다. 분석을 위해서, 생산을 위해 차입(借入)하는 기업(企業)과 생산자금을 공급하는 채권자(債權者)가 공존하는 중복세대모형(重複世代模型)(overlapping generation model)을 구성하여 양자간에 정보(情報)의 불완전성(不完全性)으로 인해 계약불이행문제(契約不履行問題)가 초래되는 상황을 내생적(內生的)으로 도출하고, 중앙은행(中央銀行)의 대출정책(貸出政策)을 통한 통화공급(通貨供給)이 기업의 투자(投資), GNP, 인플레, 시장금리(市場金利) 등에 미치는 동태적(動態的) 효과(效果)를 살펴보고자 하였다. 본고(本稿)의 "시뮬레이션"분석에 의하면 중앙은행의 대출정책은 민간금융시장에서 충분한 투자재원(投資財源)을 조달하지 못하는 기업(企業)에게 새로이 발행되는 화폐(newly printed money)로 대출금을 공급함으로써 불완전한 민간금융시장을 보완(補完)하여 실물투자(實物投資)와 생산(生産)의 증대효과(增大效果)를 가져올 수 있다. 이와 아울러 중앙은행의 대출정책(貸出政策)과 재정당국(財政當局)의 총액(總額) 조세(租稅)-이전정책(移轉政策)(lump sum tax-cum-transfer policy)을 적절히 조합(組合)하면 각 경제주체의 후생(厚生)이 자유방임경제하(自由放任經濟下)에서의 후생에 비하여 중대되는 "파레토"우월배분(優越配分)(Pareto superior allocation)이 가능하다는 결과가 도출되었다.

  • PDF

해외 엔지니어링 사업의 리스크관리 성과분석 (A Performance Analysis of Risk Management for International Engineering Project)

  • 정우용;이바울;한승헌
    • 한국건설관리학회논문집
    • /
    • 제18권2호
    • /
    • pp.99-107
    • /
    • 2017
  • 최근 들어 국내기업의 해외 엔지니어링 사업에 진출이 활발해지고 있다. 해외 엔지니어링 사업은 고부가가치 사업으로 EPC 건설사업에 비해 리스크가 적은 것으로 알려져 있지만, 국내기업의 해외 엔지니어링 매출수익은 그만큼 좋지는 않은 것으로 나타났다. 따라서, 본 연구에서는 해외엔지니어링 사업에서 많이 발생하는 리스크를 수주 전과 수주 후로 나누어서 분석하였다. 또한, 대상사업을 총액계약방식과 실비정산계약방식으로 나누어 계약방식에 따라 여러 가지 리스크의 차이점을 보여주었다. 마지막으로, 토목공종과 건축공종으로 나누어 리스크 차이를 분석하였다. 해외 엔지니어링 사업에서 발생하는 리스크를 다양한 각도로 분석한 본 연구는 산업체에게는 리스크 분석을 좀 더 실무적으로 참조할 수 있게 해주고, 학계에는 향후 좀 더 집중해서 연구해야할 엔지니어링 리스크 분야의 방향성을 제시해주는데 도움을 준다.