• Title/Summary/Keyword: Lowest bidding

Search Result 37, Processing Time 0.025 seconds

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

Food Purchasing and Quality Management Practices in School Food Service (학교급식 식재료 구매관리 및 품질관리 실태조사)

  • Kim, Gyeong-A;Gwak, Dong-Gyeong;Lee, Gyeong-Eun
    • Journal of the Korean Dietetic Association
    • /
    • v.12 no.4
    • /
    • pp.329-341
    • /
    • 2006
  • The purposes of the study were to examine food purchasing management practices and to assess dietitians' awareness on food quality standards, use of food purchasing guidelines(food quality guidelines, supplier selection criteria), and organizational collaboration related to purchasing at school food service. A total of 400 dietitians working at elementary schools in Kyunggi Province were surveyed and 247 responses were returned. Excluding responses with significant missing data, 240 responses(60%) were used for data analysis. Compared to the previous reports, competitive bidding and shorter contract periods were preferred for purchasing food supplies. A dietitian, school staff, and food service staff participated in receiving and inspection together at 58.4% of the schools. An average score of the dietitians' awareness on the food quality standards was 3.28 based on a 5-point scale(1:strongly disagree, 5:strongly agree). Their awareness scores for the quality standards related to the genetically modified organism foods, organic foods, and pesticide residues were the lowest. The awareness scores increased significantly with their age(p<.001). In general, the food purchasing guidelines were used well at the schools ; the usage levels of the food quality guidelines and supplier selection criteria were significantly different by length of operation(p<.05) and dietitians' age(p<.05), respectively. The dietitians' perception score of the organizational collaboration related to purchasing was rated 3.46 and differed significantly by dietitians' educational background(p<.05). For improving food procurement management, standardized food quality and purchasing criteria need to be developed. As the demands on high quality food supplies increase for school food service, the dietitians should improve their knowledges on the food quality standards and implement effective and creative purchasing methods.

  • PDF

A Study on Elements of CM Firms' Competitive Strategy (경쟁전략요소에 대한 CM기업의 인식에 관한 연구)

  • Baek, Seung-Ryong;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.122-130
    • /
    • 2013
  • As the level of competition has increased in the construction management market, it becomes a critical issue for CM firms to secure competitive edges. The objective of the study is to investigate elements of competitive strategy as perceived by CM firms and to discuss key features and implications. Michael Porter's Competitive Strategy Model was used as a framework to analyse the elements under three strategy categories. A major finding includes that Differentiation Strategy is generally perceived most important strategy category but, depending on the group to which a CM firm belongs, there exist a gap in the perception. However, regardless of the group, Cost Leadership is commonly considered least important strategy category. In particular, lowest-bidding strategy element showed the least importance. Understanding CM firms' perceptions on elements of competitive strategy provides an insight into CM firms' current strategy directions and can be useful for future tuning in a firms' own strategy.

A Study on the Analysis of Current Situation of Safety Inspections cost in Apartment houses (공동주택 안전점검대가 현황분석에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Yun, Yeong-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.62-70
    • /
    • 2014
  • An apartment house, a private facility, is a house built for many persons to live independently in a building. An apartment house is a building where life damage can happen most in case of a safety accident due to insufficient inspections. However, formal inspections are being realized due to awareness shortage of managing bodies about safety inspection and low-price order-receiving of diagnosing enterprises via the lowest bidding method. This is because it is judged that remarkable costs are inputted in repairs and reinforcement such as maintenance of a structure and that there is a large possibility of human damage in case of a safety accident in a structure. So, this paper aims to derive the points to improve in the current criterion to execute an efficient detailed inspection. As its method, the design price and execution price situation of 66 buildings inspected in detail for recent 3 years for the class 2 facilities in Gwangju Metropolitan City and Jeonranam-do are examined and analyzed. The state2 object buildings to inspect are selected through this. And this paper aims to present the points to improve through the analysis of current problems by evaluating the detailed inspection report and the detailed inspection execution price calculation criterion for the selected 10 apartment houses.

A Study On The Exploring Alternatives In After-School Program According To The Application Of Contract Law (방과후학교에서 계약법 적용에 따른 대안 모색)

  • Jeong, Yeong-Mo
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.7
    • /
    • pp.219-228
    • /
    • 2016
  • This research aimed at investigating policy change process of after school contracting out and suggesting future alternative. Also, this research conducted a literature search for the research data related to policy and related regulations. As the result of investigation, the Ministry of Education established management plan for after school, however there have been changes in policy, e.g. contracting out was executed from 2004 to 2008 upon autonomy of unit school through school steering committee deliberation(consultation), while standardized procedure was conducted, which was suggested in 'After school operation guideline', produced in cooperation between the Ministry of Education and municipal ministry of education from 2008 to 2015, while since 2016, contract law should be applied when after school contracting out is adopted. Policy change since 2016 is based on the legal necessity that contract law should be followed as the contract size of after school contracting out has become larger along with necessity of clarity of after school contracting out. Nevertheless, there's a worry that quality of after school education could be degraded due to lowest price bidding. The government suggested an alternative to prevent excessive price competition by paying a regular rate of basic price as personnel expenses, however this research suggested a plan to enact an ordinance in regard of specialty of after school educational activities and cities and provinces as the fundamental solution plan.

School Dieticians' Perception of Seafood Ingredient Pricing in School Food-Service in Seoul (학교급식 수산물 가격 결정에 대한 서울 지역 학교영양(교)사의 인식)

  • Cha, Myeong Hwa;Seo, Sang Rok;Moon, Min Ji;Yang, Ji Hye;Sung, Bo Mi;Jung, Hyun Suk;Ryu, Kyung
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.43 no.11
    • /
    • pp.1766-1773
    • /
    • 2014
  • The purpose of this research was to scrutinize dieticians' perspective of seafood ingredients prices in school food-service. Suppliers' contract status, seafood ingredient usage and satisfaction, expectations regarding prices of seafood ingredients, and willingness to pay when HACCP is taken into account were studied. Through random sampling, the survey was conducted on 231 dieticians in 11 different educational districts and 12 elementary, six middle, and three high schools. Ultimately, 142 survey responses were taken into account. Data analysis was performed using SPSS v15.0 by descriptive analysis, ${\chi}^2$-test, and t-test. For contracts regarding seafood ingredients, competitive contracts composed 79.7%. Exactly 42.1% responded that contracts were breached, and 60.1% testified that product returns were due to excessive glazing of ingredients. The satisfaction rate of 'hygiene & sanitation of product' was the highest, whereas 'price of product' was the lowest. For 'recontracting intention', 'informal purchasing' showed higher rates compared to 'competitive bidding'. Reflecting upon the six main price factors, 'designation and maintenance of HACCP', 'price of raw seafood ingredients', 'processing costs', 'margin', 'logistic costs', and 'cost of standardizing seafood ingredients', dieticians' perceived 'impact on the anticipated price' on total cost was lower than present counterparts. This implicates that 'impact on the present price' of the six price factors is too excessive, suggesting that many dieticians are unsatisfied with the current prices of seafood ingredients. Furthermore, 52.8% of dieticians stated that the maximum additional payment of HACCP seafood ingredients should be less than 5%. Consequently, this research serves as basic information for reasonable pricing of seafood ingredients and contributes to increased seafood usage by school food-services.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.