• Title/Summary/Keyword: Low-Voltage Power Distribution System

Search Result 159, Processing Time 0.035 seconds

Modeling of Load Element for a Low Voltage DC Distribution System (저전압 DC 배전시스템 구성요소의 부하 모델링)

  • Gwon, Gi-Hyeon;Han, Joon;Oh, Yun-Sik;Kim, Eung-Sang;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.113-121
    • /
    • 2014
  • At the end of the 19th century, a battle known as the War of the Currents was fought over how electricity would be generated, delivered, and utilized. In this day and age, there has been a growing interest in Green Growth policies as countermeasures against global warming. As a result of these policies, the use of new and renewable energy needed a power converter to replace fossil fuels has expanded. To reduce power consumption through high efficiency of conversion, Low Voltage DC (LVDC) distribution systems are suggested as an alternative. In a DC distribution system, DC loads are very efficient due to decrease the stages of power conversion. If the LVDC distribution system is adopted, not only DC load but also existing AC loads should be connected with LVDC system. Thus, the modeling of two loads is needed to analyze the DC distribution system. This paper, especially, is focused on the modeling of resistive load and electronic load including power electronic converters using ElectroMagnetic Transient Program (EMTP) software.

Comparative Analysis of Voltage Unbalance Factor on the use of Linear and Non-linear loads in Three-phase Four-wire Low Voltage Distribution Line (3상 4선식 저압 배전선로에서 선형 및 비선형 부하의 사용시 전압 불평형률 비교 분석)

  • Kim, Jong-Gyeum;Kim, Ji-Myeong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.587-592
    • /
    • 2017
  • In the three-phase four-wire low-voltage power distribution equipment, single-phase and three-phase load have been used mainly mixed. Also linear and nonlinear loads have been used together in the same conditions. In a three-phase four-wire distribution line, the current distribution of three-phase linear load is almost constant in each phase during driving or stopping, but the single-phase load is different from each other for each phase in accordance with the operation and stop. So that the voltage unbalance is caused by the current difference of each phase. In the three-phase four-wire distribution system, non-linear load is used with linear load. The presence of single-phase nonlinear loads can produce an increase in harmonic currents in three-phase and neutral line. It can also cause voltage unbalance. In the present study, we analyzed for the voltage unbalance fluctuations by the operation pattern of the single and three-phase linear and non-linear load in three-phase four-wire low voltage distribution system.

Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy (휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정)

  • Choi, Nam-Jin;Kim, Byung-Seop;Shin, Joong-Rin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

High Efficiency Strategy of High Input Voltage SMPS (고전압 입력용 SMPS의 고효율 전략)

  • Woo, Dong-Young;Park, Seong-Mi;Park, Sung-Jun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.3
    • /
    • pp.365-371
    • /
    • 2019
  • Recently, the demonstration and research on the power transmission using high voltage DC such as HVDC(High Voltage DC), Smart Grid, DC transmission and distribution have been actively conducted. In order to control the power converter in high-voltage DC power transmission system, SMPS(Switching Modulation Power Supply) for power converter control using high-voltage DC input is essential. However, the demand for high-pressure SMPS is still low, so the development is not enough. In the low-output SMPS using the high-voltage input, it is difficult to achieve high efficiency due to the switching transient loss especially at light load. In this paper, we propose a new switching scheme for high power SMPS control for low output power. The proposed method can provide better efficiency increase effect in the light load region compared to the existing PWM method. To verify the feasibility of the proposed method, a 40 W SMPS for HVDC MMC(Modulation Multi-level Converter) was designed and verified by simulation.

Simulation of Dynamic Torsional Vibration during Grid Low Voltage in a PMSG Wind Power Generation System (PMSG 풍력발전시스템에서 전원 저전압 발생시 비틀림 진동 동특성 시뮬레이션)

  • Kwon, Sun-Hyung;Song, Seung-Ho;Choi, Ju-Yeop;Jeong, Seung-Gi;Choy, Ick
    • Proceedings of the KIPE Conference
    • /
    • 2011.07a
    • /
    • pp.242-244
    • /
    • 2011
  • A wind generator system model includes wind model, rotor dynamics, synchronous generator, power converter, distribution line and infinite bus. This paper investigates the low-Voltage Ride-Through capability of PMSG wind turbine in a variable speed. The drive train of a wind turbine on 2-mass modeling can observe the shaft torsional vibration when the low-voltage occur. To reduce the torsional vibration when the low-voltage occur, this paper designs suppression control algorithm of the torsional vibration and implements simulation. A Matlab/Simulink is used to investigate the response during the transient state.

  • PDF

Development of Parallel Arc Fault Detector Using Ripple Voltage (리플전압을 이용한 병렬아크 사고 감지기 개발)

  • Choi, Jung-Kyu;Kwak, Dong-Kurl
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.21 no.5
    • /
    • pp.453-456
    • /
    • 2016
  • The major causes of electrical fire in low-voltage distribution lines are classified into short-circuit fault, overload fault, electric leakage, and electric contact failure. The special principal factor of the fire is electric arc or spark accompanied with such electric faults. This paper studies the development of an electric fire prevention system with detection and alarm of that in case of parallel arc fault occurrence in low-voltage distribution lines. The proposed system is designed on algorithm sensing the instantaneous voltage drop of line voltage at arc fault occurrence. The proposed detector has characteristics of high-speed operation responsibility and superior system reliability from composition using a large number of semiconductor devices. A new sensing control method that shows the detection of parallel arc fault is sensed to ripple voltage drop through a diode bridge full-wave rectifier at electrical accident occurrence. Some experimental tests of the proposed system also confirm the practicality and validity of the analytical results.

Transient Voltage Analysis of Low-Voltage Source Circuit inn Thermal Power Plant due to Grounding Potential Rise by Lightening (낙뢰침입에 의한 대지전위상승이 발전소 저압전원회로에 미치는 과전압 해석)

  • Yang, Byeong-Mo;Jeong, Jae-Kee;Min, Byeong-Wook;Lee, Jong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1644-1646
    • /
    • 1998
  • High-Smokestacks have been the symbol of the thermal power plant. Those cause the thermal power plant to be damaged by lightening for reaching several hundreds meter. In this paper, we investigated the accident of low-voltage source circuit due to grounding potential rise by lightening via high-smokestack in practically driving power plant, described examination into the cause and the impulse analysis. We analysed the transient voltage by EMTP(ElectroMagnetic Transient Program) via modeling the grounding system of power plant. This theoretical results coincided with practical accidental state. Therefore, it was verified that we could apply the grounding system of power plant and substation with the distribution-circuit analysis(EMTP).

  • PDF

Propagation of Lightning Surges toward primary Side of Distribution Transformer (배전용 변압기 고압측으로의 뇌서지 전파)

  • 이복희;이수봉;김병근;이승칠;이동문;정동철
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.269-272
    • /
    • 2003
  • The importance of the improving quality of electric power is being strongly raised, owing to an increasing use of sensitive and small-sized electronic devices and system. The transient overvoltage on low-voltage AC power distribution system are induced by direct or indirect lightning return strokes, and those can cause damage and/or malfunction of the utility system for borne automation, office automation and factory automation as well as medical equipments. The behavior of lightning surge transferred to the primary side from the primary side in distribution transformers were experimentally investigated the protection effect of low voltage SPD installed at the secondary side of distribution transformers was analyzed.

  • PDF

Future New Distribution System with Low voltage and Mass Capacity using HTS equipments (초전도기기를 적용한 미래 저압대용량 신 배전계통)

  • Yoon Jae Young;Kim Jong Yul;Lee Seung Ryul
    • Progress in Superconductivity and Cryogenics
    • /
    • v.7 no.1
    • /
    • pp.37-41
    • /
    • 2005
  • This paper describes the construction scheme of new distribution system using HTS(High Temperature Superconducting) power equipments such as cable, transformer and FCL(fault current limiter). At present, one of the most serious problems in distribution power system, especially for metropolitan complex city, is to obtain the ROW for cable line routes, space for downtown substations and satisfy the environmental protection caused by NIMBY phenomena. Unfortunately, it is expected that this situation will get more and more worse. As the HTS technology to apply in power system Is developed, HTS cable utilizing mass-capacity characteristic can be a useful countermeasure to overcome this problem. This paper describes the application methodology of 22.9kV HTS cable with low-voltage, mass-capacity characteristics replacing the 154kV conventional cable. By applying 22.9kV HTS cable, the HTS transformer with higher capacity for the reduction of space and transformer numbers of downtown substation is necessary. Also, if the leakage Impedance of HTS transformer is same as or lower than that of conventional transformer, the fault current of 22.9kV bus will increase because the HTS transformer capacity is larger than that of the conventional transformer. This means the parallel application of HTS-FCL to reduce the fault current in addition to the HTS cable and transformer can be necessary. With the basic construction scheme of new distribution system, this paper describes the future study points to realize this new distribution system using HTS equipments.

A Study on Calculation Method of Power Losses in 22.9kV Power Distribution Lines (22.9kV 배전선로 전력손실산출 기법에 관한 연구)

  • Hwang, In-Sung;Hong, Soon-Il;Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.4
    • /
    • pp.219-223
    • /
    • 2017
  • In this paper, we calculated the losses in the high voltage lines of power distribution system. The losses caused by high voltage lines are calculated using maximum current, resistance, loss factor, and dispersion loss factor. The accurate extraction of these factors are very important to calculate the losses exactly. Thus, the maximum loads are subdivided to regions and calculated monthly for more accurate maximum current calculation. Also, the composite resistance is calculated according to the ratio of the used wire types. In order to calculate the loss factor, the load factors according to the characteristics of each region were calculated. Finally, the losses of the distribution system is calculated by adding the losses by the transformers and the low voltage lines.