• Title/Summary/Keyword: Loss and Gain Datum Point

Search Result 1, Processing Time 0.018 seconds

A Feasibility Study on Semi-Cash Payment of Construction Subcontracting (건설 하도급공사에서 현금성결제수단 적용의 타당성 분석)

  • Koo Jeong-San;Jung Sung-Hun;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.311-316
    • /
    • 2004
  • According to subcontracting company's capital circumstanre change for the worse by price regionalism and long bill supply and demand, bill principal parts settlement means were introduced. But, performance disgrace is inactive except some corporation. The purpose of this study is presenting loss and gain datum point that is standard of economical price disbursement means at construction subcontracting construction price settlement connection corporation purchaser gold Beaning means application and supply basis data. economical gains by high cash specific gravity

  • PDF