• 제목/요약/키워드: Loop Distribution System

검색결과 173건 처리시간 0.017초

제약 조건을 고려한 배전 계통 루프 구성 알고리즘 (A Loop Configuration Algorithm Considering Constraints in Distribution System)

  • 조보현;조성민;박진현;신희상;김재철
    • 전기학회논문지
    • /
    • 제60권1호
    • /
    • pp.26-31
    • /
    • 2011
  • In this paper, we focused on the loop distribution system to solve the international issues of energy depletion and global warming. The conventional method of reconfiguration of distribution system was moving open points of switches from an actual switch position to another, while an appropriate switch must be opened to preserve the radial structure and this procedure is continued til there is no further loss reduction. However, the loop distribution system is the best optimization method to minimize loss than the other methods which is preserving radial structure. So we analyzed 3 types of loop distribution system upgraded from radial distribution system by changing normally open switch to normally closed switch. The simple 3 types of model system for simulation were composed, and each types of loop system were simulated in accordance with varying parameters. As a result of simulations, the loss reduction was different for each types of loop distribution system and each loop types have constraints for composing loop distribution system. The algorithms propose the method how to construct loop distribution system regarding constraints. Type I that needs least requirements get least loss reduction and Type III that needs most requirements get maximum loss reduction. On the other hand, Type I was most feasible distribution system to be realized.

A Strategy for Balanced Power Regulation of Energy Storage Systems in a Distribution System during Closed-Loop Operation

  • Han, Yoon-Tak;Oh, Joon-Seok;Cha, Jae-Hun;An, Jae-Yun;Hyun, Seung-Yoon;Lee, Jong-Kwan;Seo, In-Yong;Kim, Jae-Eon
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권6호
    • /
    • pp.2208-2218
    • /
    • 2017
  • To resolve overload in a distribution system, a distribution system operator (DSO) often performs a load transfer using normally open tie points and switches in the distribution line. During this process, the distribution system is momentarily operated in closed-loop operation. A closed-loop current in the distribution system can cause a power failure due to excess breaking current in the circuit breakers and reclosers. Therefore, it is necessary to calculate the closed-loop current exactly. However, if there are a large number of distributed generation (DG) systems in the distribution system, such as energy storage systems (ESS), they might obstruct the closed-loop operation based on bidirectional power flow. For quick and precise operation of a closed-loop system, the ESS has to regulate the power generation while satisfying closed-loop operation in the worst cases. We propose a strategy for balanced power regulation of an ESS. Simulations were carried out using PSCAD/EMTDC, and the results were compared with calculation results.

루프화 배전계통에 초전도 한류기 적용에 따른 Recloser-Fuse 보호협조 분석 (Analysis on Recloser-Fuse Coordination in Loop Power Distribution System with Superconducting Fault Current Limiters)

  • 최규완;김수환;문종필
    • 전기학회논문지P
    • /
    • 제64권3호
    • /
    • pp.111-115
    • /
    • 2015
  • Recently, protection coordination issues can occur due to increased fault current in power system when power system being changed radial power system to grid system such as loop power system, micro grid and smart grid. This paper analyzed Recloser-Fuse coordination in loop power distribution system with Superconducting Fault Current Limiters(SFCLs) when single line ground fault occur in loop power distribution system with SFCLs. We analyzed Recloser-Fuse Coordination in radial power distribution system and changed coordination caused by increased Fault current because of loop system when single line ground fault occur in power distribution system. This paper simulated to improve changed coordination using SFCLs in loop power distribution system. Power distribution system, SFCLs and protective devices are modeled using PSCAD/EMTDC.

배전자동화 계통의 루프 운전시 보호협조에 관한 연구 (A Study on the Protective Coordination of Distribution Automation System under Loop Operation)

  • 이희태;문종필;김재철
    • 전기학회논문지
    • /
    • 제58권7호
    • /
    • pp.1281-1286
    • /
    • 2009
  • As a general radial configuration of power distribution system, the various researches have being studied to change a radial configuration to network one such as smart, intelligent and micro grid for loop operation. If a radial configuration changes to network, protective coordination comes to the biggest problem. When a typical protective algorithm is applied to loop distribution system protection, the interrupted section is expanded, therefore, reliability grows worse. This paper presents the new protective method being able to apply to loop distribution system with Distribution Automation System (DAS) which separate the minimal faulted section. Through contingency analysis of the sustained and momentary fault, we analyzed the influence for radial configuration and loop configuration using interrupted area and proved the effectiveness of proposed method.

차단기와 리클로져의 통신을 이용한 루프 배전계통의 보호협조 적용시 신뢰도 비교에 관한 연구 (A Study on the Comparison of Reliability for Protective Coordination of Loop Power Distributions using Communication of Circuit Breaker and Recloser)

  • 이희태;문종필
    • 전기학회논문지P
    • /
    • 제60권3호
    • /
    • pp.133-137
    • /
    • 2011
  • The purpose of smart grid is the low $CO_2$ through expansion of renewable energy. To achieve the purpose of smart grid, typical radial power distribution system will be changed to loop power distribution system. The loop power distribution system have many advantages such as low power loss, low voltage drop, and increase of connection of renewable energy. In this paper, the algorithm for minimization of interrupted section of power distribution system is proposed through communication between circuit breaker and recloser in loop power distribution system. The proposed algorithm is proved through case studies about reliability evaluation

수지상 배전계통을 단일루프로 구조 변경시 신뢰도 비교 (The Comparison of Reliability for Change Single Loop Configuration in Radial Power Distribution System)

  • 이희태;김재철;김주용
    • 전기학회논문지
    • /
    • 제58권8호
    • /
    • pp.1472-1478
    • /
    • 2009
  • The domestic power distribution system is operating in an open loop mode; however, it already has a loop structure. Power distribution systems must be changed for bi-directions power supply for smart networks due to a changing of paradigm in electric power industry. The simplest bi-directions distribution networks can make it closing of normally open switch. However, bi-directions power supply is very difficulty to be operated and there are many parts which it must study. This paper presented various models that are able to change a radial system for loop structures. Further, we compared the reliability index for each model by evaluating the amount of improvement reliability required in radial power distribution system. In addition, we calculated CIC(Customer Interruption Cost) for each model by comparing and analyzing.

단일루프 배전계통과 방사상 배전계통의 순간정전을 고려한 신뢰도 비교 연구 (A Comparative Study for Reliability of Single and Radial Power Distribution System considering Momentary Interruption)

  • 이희태;김재철
    • 전기학회논문지
    • /
    • 제58권7호
    • /
    • pp.1270-1275
    • /
    • 2009
  • The structure of a power distribution system will change in a loop configuration such as in the case of a smart grid. If power distribution system changes radial to loop form, the structure may have to be changed significantly. Therefore, we analyzed the reliability indices and calculated a CIC(Customer Interruption Cost) for the loop power distribution system. The power distribution system reliability depends on the protection scheme. This study is applied to the current protection scheme method and is compared with each model. When the CIC was evaluated, most studies performed calculations only for sustained interruptions. However, in actuality, momentary interruption frequencies occurred more than sustain interruptions. Thus, it is occurred the CIC additively. Therefore, we evaluated a CIC including momentary interruption, for each model, and then compared with MAIFI(Momentary Average Interruption Frequency Index)

방향성 계전기를 고려한 루프 배전계통 신뢰도 평가에 관한 연구 (A Study on the Reliability Estimation of Loop Distribution System Considering Directional Relay)

  • 박진현;조성민;조보현;신희상;김재철
    • 전기학회논문지
    • /
    • 제59권11호
    • /
    • pp.1942-1948
    • /
    • 2010
  • Recently, the radial distribution system is operating as one-way power flow. These are popular because of their simple design and relatively low cost. However, radial systems are sensitive to outages due to single contingencies. Also, reliability of supply is becoming increasingly important. Accordingly, an appearance of the loop distribution system is inevitable and the other countries such as Macau, Florida, Taiwan are actively working on. The reliability of distribution system is estimated with reliability indices. In this paper, comparing with the radial distribution system, we evaluate and analyse the reliability of loop distribution system quantitatively considering directional relay.

상시개방점 양단전압 측정값을 이용한 배전선로 루프운전 가능 여부 판단 방법 (Loop Current Calculation based on Voltage Angle Difference at Tie Switch for Switching Plan Validation in Distribution System Operation)

  • 손주환;임성일
    • 조명전기설비학회논문지
    • /
    • 제29권7호
    • /
    • pp.14-21
    • /
    • 2015
  • Distribution systems are operated in radial structure, but temporal loop structure could be founded the live load transfer. Main purposes of reconfiguration of distribution network are load balancing, loss minimization and voltage drop maintaining. In the loop structure, huge loop current can be flowed between two substations in case of large voltage angle difference. Protection devices of distribution line can be triped by this huge loop current. So, precise calculation of loop current is very important for secure switching. This paper proposes a novel calculation method of loop current using the voltage angle differences measured at the tie switches. Feasibility of the propose method has been verified by various case studies based on Matlab simulation.

배전운영 시스템에서 상시개방 연계 스위치 투입에 의한 루프 운전 중 구간전압 계산 방법 (Section Voltage Calculation while a Loop Operation by Tie-Switch Close in a Distribution Management System)

  • 서정수;임일형;박종호;신용학;최면송
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.397-403
    • /
    • 2016
  • Generally, an electrical distribution configuration is a radial system with one-way current in a distribution management system (DMS). All feeders in a DMS have tie-switches to make radial system. Sometimes, DMS should change a tie-switch for operation. In that case, the tie-switch has to be closed first; then a switch is opened as another tie-switch in order to prevent blackout for customers. At the moment when the tie-switch is closed, distribution system is operated in a loop state, not radial. Before the loop operation, DMS operator has to check any expected events for stable distribution system operation; and the most important event is a mis-operation of a protection relay. In addition, DMS operator should check voltage profile violation but a calculation method of section voltages had not been used. Thus, this paper proposes a calculation method of section voltages at a loop operation in a DMS. The proposed calculation algorithm is verified by Matlap Simulink.