• Title/Summary/Keyword: Long-term settlement

Search Result 193, Processing Time 0.025 seconds

Comparative Analysis of Final Consolidation Settlement by Degree of Consolidation in Soft Soils of Yeongam-Haenam Areas (영암-해남 연약지반의 압밀도 변화에 따른 최종침하량 비교분석)

  • Kim, Tae-Wan;Nam, Geon;Kim, Jae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.9
    • /
    • pp.25-33
    • /
    • 2023
  • To effectively improve soft soils, it is necessary to perform ground behavior characteristics and stability management through measurement activities when embankment of structures on soft soils is conducted. However, there are many differences between the actual ground behavior and the initial design plan. To address this issue, this study analyzed the measured settlement in the Yeongam-Haenam areas using the Hyperbolic method to predict the settlement based on the measurement data. From the completion time of the embankment in the target area, the final settlement was predicted through the change in the degree of consolidation by the measurement period. Furthermore, the final settlement according to the change in degree of consolidation was compared and analyzed through finite element analysis and field measurement.

Characteristics of Negative Skin Friction of Foundation Pile and Construction Management by Experimental Field Test (현장시험을 통한 기초 말뚝 부마찰력의 특성과 시공관리)

  • Hong, Seok-Woo
    • International Journal of Highway Engineering
    • /
    • v.14 no.3
    • /
    • pp.41-48
    • /
    • 2012
  • In this study the negative skin friction test of foundation pile was performed in order to monitor the negative skin frictional force acting on the steel pipe pile installed in soft soil. The monitored frictional stresses obtained from the long-term loading test. Through the long-term frictional stress monitoring test, the economical period for the construction of the superstructure was determined. The following conclusion were derived from this study: (1) In soft soil, negative skin friction increases with the increase in the rate of settlement. (2) In the friction relationship graph, the period where there is no frictional strain increase is verified and the time for the construction of the superstructure is determined. (3) The pile loading test was performed and the negative skin friction was compared with the test results. It was determined that the negative skin friction after driving was larger than the negative skin friction obtained from the loading test. 15 days after the construction, the monitored value was similar with the theoretical data. (4) It was determined that even during the occurrence of negative skin friction an economical construction management can be performed using the long-term monitoring method of negative skin friction.

Long-term Behavior Characteristics of Backfilled Ground by EPS (EPS로 뒷채움된 지반의 장기거동특성)

  • Chun, Byung-Sik;Jung, Chang-Hee;Choi, Hui-Rim
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.10
    • /
    • pp.151-161
    • /
    • 2007
  • EPS provides a superb self-sufficient stability. Studies on the process of EPS construction method focus on the inchoate phase of general construction, which is increasingly applied to construction sites throughout the world. Unfortunately, there has been little study on the durability and long-term soil behavior involving EPS materials. In this study, the boring, in-site and laboratory tests were conducted to examine the long-term soil behavior in the back-filling of alternating behind the side to which EPS was applied. And results of finite element analysis considering various test results and the soil behavior data measured during the construction show that EPS construction method is a superb process that relieves the load and consequently reduces the settlement, alleviates the stress on the abutment, and prevents lateral flow.

Reclamation Plan and Design for The Yeochon Industrial Complex (여천 임해공업단지 매립 계획 및 설계)

  • 한경석;신승철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.10a
    • /
    • pp.75-86
    • /
    • 1992
  • The elevation of reclamation work in the coastal area for the industrial complex is determined through the investigation and review of marine conditions, drainage plan and fill materials. The embankment to be constructed with crushed stone on the soft soil should be safe against the wave force, immediate and long term consolidation settlement, overturning and sliding due to self-weight and other forces. Because of lack of fill material from the borrow pit, the soft marine clay to be dredged shall be used as the reclamation material. And Paper Drain Board is used as the improvement method for the deep soft clay strata.

  • PDF

Long-Term Measurement under the Moving train at the Test Reinforced Roadbed Site in Railway (철도강화노반 시험부설구간에서의 열차 주행시 장기거동 계측)

  • 황선근;신민호;이성혁;최찬용;이시한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.223-230
    • /
    • 2001
  • Nine different types of the reinforced railroad roadbeds which . are located in between Suwon-Chunan station of Kyongbu line were constructed in order to increase the bearing capacity of railroad roadbed and to improve the ridability as a part of speed-up project of conventional railroad systems. Each three sections were composed of weathered granite soil, crushed stone and furnace slag(HMS25), and fully instrumented with earth pressure cells, settlement plates and geophones to monitor the behavior of roadbeds under actual train loads. Field measurement has continued since October 31, 2000 and presently with rather longer measurement interval. The measurement data such as settlement, earth pressure and vibration levels are currently under analysis process. In this paper, only cumulative measurement data of railroad roadbeds were introduced. In the near future, comprehensive measurement data and result of analysis will be presented and design technique for the reinforced railroad roadbed will be proposed as a final product of this study.

  • PDF

Compressibility of broken rock-fine grain soil mixture

  • Xu, Ming;Song, Erxiang;Cao, Guangxu
    • Geomechanics and Engineering
    • /
    • v.1 no.2
    • /
    • pp.169-178
    • /
    • 2009
  • Due to the enormous amount of fills required, broken rock-fine grain soil mixtures have been increasingly used in the construction of high-fill foundations for airports, railways and highways in the mountain areas of western China. However, the compressibility behavior of those broken rock-fine grain soil mixtures remains unknown, which impose great uncertainties for the performance of those high-fill foundations. In this research, the mixture of broken limestone and a fine grain soil, Douposi soil, is studied. Large oedometer tests have been performed on specimens with different soil content. This research reveals the significant influence of fine grains on the compressibility of the mixture, including immediate settlement, creep, as well as wetting deformation.

A Case Study Of Dynamic Compacted Rock Embankment Design Considering Long Term Behavior (장기침하를 고려한 고성토 암버력 동다짐 지반의 설계사례)

  • Bae, Kyung-Tae;An, Sang-Yik;Park, Yong-Man;Kim, Kang-Kyu;Kim, Hyung-Suk;Lee, Woo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.967-975
    • /
    • 2009
  • In order to control differential settlement and to secure the safety of super structure on a high rock embankment the designed static compaction is changed with dynamic compaction and piled raft method. The parameters for dynamic compaction design are obtained from a pilot test. In addition, numerical analyses are also carried out to figure out the length and quantity of piled raft that can restraint the differential settlement within allowance range.

  • PDF

Characteristics of Behavior of the Soft Roadbed through Long-Term Instrumentation on the Field Test (운행선상의 연약노반 시험부설구간에서의 장기계측을 통한 거동 특성)

  • Lee Jin-Wook;Choi Chan-Yong;Lee Sung-Hyok;Lee Cnang-Youl
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1058-1064
    • /
    • 2004
  • As one of reinforcing methods for soft roadbed, the problems that mud-pumping and settlement occurred by soft roadbed, were investigated, evaluated and analyzed through installing relatively economical and efficient geosynthetics on the selected track-bed for testing. Mock-heang to Dong-ryang on the filed resting sections in the Chung-buk lines were selected as investigating the state of track and prepared field after selecting three of 1,700 spots which often make mud-pumping and requiting maintenance for that. Long curved line radiuses(R) of Mock-heang to Dong-ryang are 500m that were installed with 4 types of geosynthetics layers and one ballast layer. Installed testing cross-section is 200m totally with 40 m between places. Strength or prepared roadbed was measured to investigate the state of roadbed and track with constructing(installing) field testing sections and physical properties of roadbed soils were evaluated and analyzed. Also, mud-pumping, settlement of elastic or plastic sleeper, failure or track, wheel-loads, transverse and earth pressures were measured after installing field testing sections.

  • PDF

A Study on Reinforcement Effectiveness for Railway Soft Roadbed through Long-Term Instrumentation on the Field Test (현장부설시험구간에서의 장기계측을 통한 토목섬유 보강효과)

  • Choi Chan-Yong;Lee Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.734-743
    • /
    • 2005
  • In this study, geotextiles was applied on the selected track-bed, which is relatively economical and efficient way to prevent the problem of mud-pumping and settlement. Field testing sections from Mock-haeng to Dong-ryang in the Chung-La lines in Korea were selected to investigate the state of track and roadbed. And three places were chosen among 1,700 spots where mud-pumping was frequently occurred and maintenance required. At the curved section with radius of 500m between Mock-haeng and Dong-ryang, we divided this testing site into 5 section and 4 different types of geotextile were installed and left the last section with no reinforcement. Total length of the test site was 200m and individual length of each site was 40 m. In order to understand the state and the strength of prepared roadbed, stiffness and physical properties of the roadbed soil were evaluated and analyzed. Also, after the installation, mud-pumping, settlement of elastic or plastic sleeper, failure of track, wheel-loads, lateral force and earth pressures were investigated.

  • PDF

Observed Long-term Water Content Change in Concrete Track Roadbed by Rainfall (콘크리트궤도노반에서의 강우량에 따른 장기 함수비 변화)

  • Choi, Chanyong;Kim, Hunki;Yang, Sangbeom;Eum, KiYoung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.35-43
    • /
    • 2015
  • In this study, it was performed in characteristics of settlement of roadbed materials with variation of water content using cylinder model device. The ratio of settlement ($R_e$) of subgrade soils in the initial water content were about 2.08, whereas it was increased about 4.06 which resulted in increase two times in the initial water content. Also, it was monitoring long-term to measure variation of the field water contents at concrete track using rainfall measuring sensors. The water content at directly underneath of concrete track rarely seems to affect the variation of water content, but it was increased by about 4% than intial water content with 20 mm/hr rainfall index at slope section. As for the result from the field date, it was determined that the water content of the inner subgrade layer was rarely affect caused by more than 20 mm/h rainfall index during if good drainage system at concrete track properly maintained.