• Title/Summary/Keyword: Long-Term Maintenance plan

Search Result 104, Processing Time 0.038 seconds

A Study on the Investigation Technique for Deterioration State of Window·Door and Tile of Apartment Houses (공동주택 창호 및 타일의 열화상태 조사기법에 관한 연구)

  • Lee, Jung-Hun;Bae, Kee-Sun;Lee, Seong-Bok;Oh, Sang-Keun;Choi, Soo-Kyung;Seo, Chi-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.27-30
    • /
    • 2011
  • Analysis data of basics which are used for LCC(Life Cycle Cost) analysis of buildings and maintenance plan, are demanded to secure according as replacement cycle of repairs of apartment houses has come. However, investigation techniques and systems for investigating condition of deterioration of apartment houses, have not been made yet in Korea. For this reason, this study was wanted to make investigation techniques and systems, so the process for maintenance of apartment houses was researched and the required quality and deterioration factors of interior/exterior materials were investigated. As a result Check-List for investigating condition of deterioration, was made. if this is used during a nonscheduled, a routine, a regular and a urgency check, the methodical investigation will be achieved. Furthermore, if this is used for maintenance of apartment houses, it will be helped to select the repair cycle and the long-term repair plan.

  • PDF

Understanding Cancer Survivorship and Its New Perspectives (Cancer Survivorship에 대한 이해와 전망)

  • Kim, Soo-Hyun
    • Asian Oncology Nursing
    • /
    • v.10 no.1
    • /
    • pp.19-29
    • /
    • 2010
  • Purpose: The purpose of this article was to review and discuss the current status, issues, and nursing perspectives of cancer survivorship. Methods: A comprehensive literature review was conducted. Results: The major areas of concern for the survivors included recurrence, secondary malignancies, and long-term treatment sequalae which affect their quality of life. The four essential components of survivorship are prevention, surveillance, intervention, and coordination. Cancer survivorship care plan should address survivor's long-term care, such as types of cancer, treatment modalities, potential side effects, and recommendations for follow-up. It also needs to include preventive practices, health maintenance and well-being, information on legal protections regarding employment and health insurance, as well as psychosocial services in the community. Survivorship care for cancer patients requires multidisciplinary efforts and team approach. Conclusion: Nurses are uniquely positioned to play a key role in ensuring quality services for cancer survivors and family members. Nurses should review the care plans for cancer survivorship with patients and families by instructing them when to seek medical treatment, promoting any recommended surveillance protocols, and encouraging healthy life styles for health promotion and quality of life.

Internal Property and Stochastic Deterioration Modeling of Total Pavement Condition Index for Transportation Asset Management (도로자산관리를 위한 포장종합평가지수의 속성과 변화과정의 모델링)

  • HAN, Daeseok;DO, Myungsik;KIM, Booil
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.1-11
    • /
    • 2017
  • PURPOSES : This study is aimed at development of a stochastic pavement deterioration forecasting model using National Highway Pavement Condition Index (NHPCI) to support infrastructure asset management. Using this model, the deterioration process regarding life expectancy, deterioration speed change, and reliability were estimated. METHODS : Eight years of Long-Term Pavement Performance (LTPP) data fused with traffic loads (Equivalent Single Axle Loads; ESAL) and structural capacity (Structural Number of Pavement; SNP) were used for the deterioration modeling. As an ideal stochastic model for asset management, Bayesian Markov multi-state exponential hazard model was introduced. RESULTS:The interval of NHPCI was empirically distributed from 8 to 2, and the estimation functions of individual condition indices (crack, rutting, and IRI) in conjunction with the NHPCI index were suggested. The derived deterioration curve shows that life expectancies for the preventive maintenance level was 8.34 years. The general life expectancy was 12.77 years and located in the statistical interval of 11.10-15.58 years at a 95.5% reliability level. CONCLUSIONS : This study originates and contributes to suggesting a simple way to develop a pavement deterioration model using the total condition index that considers road user satisfaction. A definition for level of service system and the corresponding life expectancies are useful for building long-term maintenance plan, especially in Life Cycle Cost Analysis (LCCA) work.

A Study on the Rolling Stock Scheduling considering maintenance activities in Railway (유지보수를 고려한 철도차량 운용계획에 관한 연구)

  • Kim Dong-Hee;Hong Sun-Heum
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.280-285
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long-term, mid-term. short-term, and real-time plan. The planning of vehicle and manpower resources is a main research topic in tactical short-term planning step. Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far, power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high-speed railway is introduced, the operational planning of trainset vehicles become important, In this paper, we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

Rolling Stock Maintenance Scheduling for High-Sneed Railway (고속철도차량의 유지보수계획)

  • 김동희;홍순흠
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.05a
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

Introduction of Asset Management System for Road Facilities (도로시설물의 자산관리시스템 도입 방안 연구)

  • Kim, Je-Won;Yoo, In-Kyoon
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.325-328
    • /
    • 2008
  • After insufficient road facilities are expanded, it is more important to maintain performance of road facilities the time according to passing. When the road facilities are maintained optimally through proper maintenance, the total amount of investment can be minimized and national competitiveness is improved. Individual maintenance research of road facilities such as PMS or BMS was in progress until currently, but it is difficult to joint ownership and share information between systems, and it is impossible to use as the decision-making. Therefore, Asset Management System for road facilities is enforced to solve the inefficiency of existing systems, maintenance the road facilities systematically under the limited budget and get the maximum benefits against the cost from the view point of long-term. In this paper, the concept of Asset Management System explained, and research plan from KICT in order to introduce the Asset Management System of road facilities from 2008 hereafter for 5 years accounted.

  • PDF

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Long-term Settlement Prediction of Railway Concrete Track Based on Recurrent Neural Network (RNN) (순환신경망을 활용한 콘크리트궤도의 장기 침하 거동 예측)

  • Kim, Joonyoung;Lee, Su-Hyung;Choi, Yeong-Tae;Woo, Sang Inn
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.3
    • /
    • pp.5-14
    • /
    • 2020
  • The railway concrete track has been increasingly adopted for high-speed train such as KTX due to its high running stability, improved ride quality for the passengers, and low maintenance cost. However, excessive settlement of the railway concrete track has been monitored at embankment sections of the ◯◯ High-speed Line, resulting in the concerns on the safety of railway operation. In order to establish an effective maintenance plan for the concrete track railway exceeding the allowable residual settlement, it is essential to reasonably predict their long-term settlement behavior during the public period. In this study, we developed a model for predicting the long-term settlement behavior of concrete track using recurrent neural network (RNN) and examined the applicability of the developed model.