• Title/Summary/Keyword: Logistics Complex

Search Result 197, Processing Time 0.075 seconds

A Study on Establishment and Operation of International Arbitration Center within Incheon Free Economic Zone (인천경제자유구역 국제중재센터 설립 및 운영방안)

  • Kim, Sang-Ho
    • Journal of Arbitration Studies
    • /
    • v.18 no.1
    • /
    • pp.121-145
    • /
    • 2008
  • Northeast Asia is increasingly making a transition to distinctive and crucial region in the 21st Century and growing into one of world's top three economic spheres along with the EU and NAFTA. In 2003, Korean government announced the Northeast Asian economic hub country plan as an important agenda. As a means of coping with the changing global environment, Korean government designated Incheon in 2003 as the country's first Free Economic Zone ahead of Busan and Gwangyang Bay in the south of the country because Incheon has a geographical advantage linking North America and Europe with Incheon International Airport and Incheon Seaport. The purpose of this paper is to make research on establishment and operation of an arbitral body entitled ${\ulcorner}International Arbitration Center{\lrcorner}$ (IAC) within Incheon Free Economic Zone(IFEZ). For the purpose of this, the writer in this paper, reviewed the necessity of the IAC's establishment and its legal basis as well as the role and function of the Center. Also, the writer presented plans for how to operate the IAC and how to cooperate with the key arbitral organizations of foreign countries for the settlement promotion of commercial disputes including trade and investment. With development of the IFEZ, world-renowned enterprises will invest in the Incheon economic bloc and conduct economic activities, business operation, marketing, logistics, financing, etc. In this connection, diverse types of commercial disputes are expected to occur between foreign companies entering the IFEZ and Korean firms. In this connection, the Korean Commercial Arbitration Board(KCAB) has been operating its liaison office in the IFEZ since 2004. However, in view of the increasing arbitration demand, the IAC should be set up in the IFEZ in the near future by the positive support of the government in the respect of both administration and finance because the free economic zone-related law provides for the installation of arbitration organization. For the success of the IAC, the Center will have to provide not only good quality of arbitral services that can satisfy arbitration parties but also need to conduct researches and make efforts so that arbitration can be utilized well in the IFEZ. If the IFEZ can provide advantageous business environments to those multinational enterprises intending to the Incheon economic bloc, the IAC will also contribute to the settlement of commercial disputes arising from the Gaeseong Industrial Complex in North Korea in view of the geographical advantage and logistic benefit of the IFEZ. Finally, this paper also suggests a new model for a joint dispute resolution system by the initiative of Korean government and Korean arbitral organizations for the settlement of commercial disputes within Northeast Asia, for which the CAMCA(Commercial Arbitration and Mediation Center for the Americas) of NAFTA can be a good example.

  • PDF

An Analysis of Daily Maximum Traffic Accident Using Generalized Extreme Value Distribution (일반화 극단치분포를 이용한 일 최대 교통사고 분석)

  • Kim, Junseok;Kim, Daesung;Yoon, Sanghoo
    • Journal of Digital Convergence
    • /
    • v.18 no.10
    • /
    • pp.33-39
    • /
    • 2020
  • In order to cope with traffic accidents efficiently, the maximum number of traffic accidents, deaths and serious injuries that can occur during the day should be presented quantitatively. In order to examine the characteristics of traffic accidents in different regions, it was divided into the Seoul metropolitan area, Chungcheong area, Gyeongbuk area, Honam area, and Gyeongnam area and was suitable for the generalized extreme value distribution (GEV). The parameters of the GEV distribution were estimated by the L-moments, and the Anderson-Darling test and the Cramer-von Mises test confirmed the suitability of the distribution. According to the analysis, the maximum number of traffic accidents that can occur once every 50 years is 401 in the Seoul metropolitan area, 168 in the South Gyeongsang region, 455 in the North Gyeongsang region, 136 in the Chungcheong region and 205 in the South Jeolla region. Compared to the Seoul metropolitan area, which has a large population and car registration, the number of traffic accidents is relatively high due to the large area, mountainous areas, and logistics movement caused by the industrial complex.

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

Planting Method of Buffer Green Space in the Reclaimed Seaside Areas, Rokko Island, Kobe, Japan (일본 고베시(신호시(神戶市)) 로코(육갑(六甲))아일랜드 임해매립지의 완충녹지 식재기법 연구)

  • Han, Bong-Ho;Kim, Jong-Yup;Choi, Jin-Woo;Cho, Yong-Hyeon
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.2
    • /
    • pp.157-165
    • /
    • 2010
  • This study was carried out to suggest the basic data of planting method for construction of buffer green space based on the land use in case of reclaimed land by analyzing land structure, planting concept, and planting structure in buffer green space, Rokko Island, Kobe, Japan. Rokko Island(total area: 580ha) is divided into port and logistics industry area and urban area by constructing the box type large-scale buffer green space. The land structure of buffer green space were biased mounding type, parallel mounding type, and complex mounding type. The width of buffer green space was 50meters in case of northern area, from 28 to 32meters in case of eastern area, and 37.5meters in case of western area, and the slope of that was from 18 to 25 degrees and the height of that was from 2 to 15meters. There were applied landscape and buffer planting concept on the sea side area of northern buffer green space, on the other hand landscape and shade planting concept on the Inner city side area of that. According to the result of planting structure analysis of northern buffer green space, the main woody species were those of deciduous-evergreen species grow in warm-temperate forest zone such as Quercus glauca, Cinnamomum camphora, Machilus thunbergii, Elaeagnus maritima. The results of maximum number of species and planting density by $100mm^2$ was that 9 species 22 individuals in canopy layer, 9 species 15 individuals in understory layer, 3 species 67 individuals in shrub layer, and 14 species 104 individuals in total. The plant coverage of northern buffer green space based on the ecological planting method was from 69 to 139% in case of canopy layer, from 26 to 38% in case of understory layer, from 6 to 7% in case of shrub layer, and from 101 to 184% in total. Index of plant crown volume of northern buffer green space based on the ecological planting method was from 1.40 to $3.12m^3/m^2$ in case of canopy layer, from 0.43 to $0.55m^3/m^2$ in case of understory layer, $0.06m^3/m^2$ in case of shrub layer, and from 1.89 to $3.73m^3/m^2$ in total.

Research on the Measures and Driving Force behind the Three Major Works of Daesoon Jinrihoe in North Korea in Case of the Respective Types of Unification on the Korean Peninsula (한반도 통일 유형별 북한지역의 대순진리회 3대 중요사업 추진 여건과 방안 연구)

  • Park, Young-taek
    • Journal of the Daesoon Academy of Sciences
    • /
    • v.39
    • /
    • pp.137-174
    • /
    • 2021
  • The main theme of this paper centers on how to promote Three Major Works of Daesoon Jinrihoe, charity aid, social welfare, and education projects, during the unification period. Determining the best methods of promotion is crucial because the Three Major Works must be carried out after unification, and the works must remain based on the practice of the philosophy of Haewon-sangsaeng (the Resolution of Grievances for Mutual Beneficence). The idea of Haewon-sangsaeng is in line with the preface of the U.N. Charter and the aim of world peace. North Korean residents are suffering from starvation under their devastated economy, which is certain to face a crisis of materialistic deficiency during reunification. In this study, the peaceful unification of Germany, unification under a period of sudden changes in Yemen, and the militarized unification of Vietnam were taken as case studies to diagnose and analyze the conditions which would affect the implementation of the Three Major Works. These three styles of unification commonly required a considerable budget and other forms of support to carry out the Three Major Works. Especially if unification were to occur after a period of sudden changes, this would require solutions to issues of food, shelter, and medical support due to the loss of numerous lives and the destruction of infrastructure. On the other hand, the UNHCR model was analyzed to determine the implications of expanding mental well prepared and sufficiently qualified professionals, reorganizing standard organizations within complex situations, task direction, preparing sufficient relief goods, budgeting, securing bases in border areas with North Korea, and establishing networks for sponsorship. Based on this, eight detailed tasks in the field of system construction could be used by the operators of the Three Major Works to prepare for unification. Additionally, nine tasks for review were presented in consideration of the timing of unification and the current situation between South and North Korea. In conclusion, in the event of unification, the Three Major Works should not be neglected during the transition period. The manual "Three Major Works during the Unification Period" should include strategic points on organizational formation and mission implementation, forward base and base operation, security and logistics preparation, public relations and external cooperation, safety measures, and transportation and contact systems.

A Study on Changes in the Safety Perception of Port Workers in accordance with the Enforcement of the Serious Disasters Act (중대재해법 시행에 따른 항만노동자의 안전인식 변화)

  • Park, Junkyu;Park, Keun-Sik
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.3
    • /
    • pp.133-149
    • /
    • 2022
  • The Port logistics is a pivotal industry in strengthening competitiveness for countries and companies and plays an important role in accounting for the majority of Korea's import and export volume, so its importance among Korea's industries is truly enormous. The port, which plays such an important role, is simultaneously unloaded, transferred into the dock, and stored, and it can be said that it is composed of a very complex flow. In particular, port unloading is an environment in which port unloading workers cannot escape the risk of disasters as large cargoes and cranes for container transport move, and numerous disasters are hidden and lead to serious disasters. Through literature studies on the Serious Accident Penalty Act, this study investigated how the Serious Accident Penalty Act affected port unloading workers and whether there was a change in satisfaction with safety education according to the enforcement of the Serious Accident Penalty Act. Through this study, it was found that port unloading workers were more aware of safety than managers in cognitive, attitude, and experience factors. Since the port unloading manager is not put into the unloading work, the perception of safety was analyzed to be lower than that of workers. Since managers should educate workers on safe work and be alert to safety, it seems that port unloading managers will also need to change their perception of safety. The Act on the Punishment of Severe Disasters took effect on January 27, 22, and in the early stages of the enforcement of the law, many confusing and ambiguous parts are found for those in charge of performing practical tasks on the front line until the law is settled. It seems necessary to revise the Act on the Punishment of Severe Disasters for the purpose of clear standards for the law and no safety accidents in the field to prevent confusion in work. In addition, in order to derive more meaningful research results in the future, it is expected that research on the perception of disasters by workers and managers will be continuously needed by deepening literature research to find various factors and using investigation methods such as interviews.

A Study on the Operation Plan of the Gangwon-do Disaster Management Resources Integrated Management Center (강원도 재난관리자원 통합관리센터 운영방안에 관한 연구)

  • Hang-Il Jo;Sang-Beom Park;Kye-Won Jun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.17 no.1
    • /
    • pp.9-16
    • /
    • 2024
  • In Korea, as disasters become larger and more complex, there is a trend of shifting from a focus on response and recovery to a focus on prevention and preparedness. In order to prevent and prepare for disasters, each local government manages disaster management resources by stockpiling them. However, although disaster management resources are stored in individual warehouses, they are managed by department rather than by warehouse, resulting in insufficient management of disaster management resources due to the heavy workload of those in charge. In order to intensively manage these disaster management resources, an integrated disaster management resource management center is established and managed at the metropolitan/provincial level. In the case of Gangwon-do, the subject of this study, a warehouse is rented and operated as an integrated disaster management resource management center. When leasing an integrated management center, there is the inconvenience of having to move the location every 1 to 2 years, so it is deemed necessary to build a dedicated facility in an available site. To select a location candidate, network analysis was used to measure access to and use of facilities along interconnected routes of networks such as roads and railways. During network analysis, the Location-Allocation method, which was widely used in the past to determine the location of multiple facilities, was applied. As a result, Hoengseong-gun in Gangwon-do was identified as a suitable candidate site. In addition, if the integrated management center uses our country's logistics system to stockpile disaster management resources, local governments can mobilize disaster management resources in 3 days, and it is said that it takes 3 days to return to normal life after a disaster occurs. Each city's disaster management resource stockpile is 3 days' worth per week, and the integrated management center stores 3 times the maximum of the city's 4-day stockpile.