• Title/Summary/Keyword: Logging cost

Search Result 42, Processing Time 0.02 seconds

A Case Study on Efficiency Analysis of Cable Logging Operation in Korea (국내 가선집재 작업의 효율성 분석에 관한 사례연구)

  • You, JoungWon;Han, Hee;Chung, JooSang
    • Journal of agriculture & life science
    • /
    • v.53 no.6
    • /
    • pp.35-44
    • /
    • 2019
  • The objectives of this study were to identify engineering problems in the design and installation of cable logging operation that affects productivity through case study of actual logging sites, and to analyze associated productivity loss and increased cost. As a result of the study, when the geographic conditions and engineering safety of the site are not sufficiently considered, deflection of the cable line can not be secured. Hourly productivity of the operation decreased to 65% and the logging cost increased by more than two times compared to the productive yarding operation, which lowered overall efficiency of the operation. Thus, it is required to spread filed technologies that minimize unnecessary production cost incurred due to the in-efficient logging operations as well as secure work safety and efficiency to expand cable logging operation throughout the country.

Prediction of Forest Biomass Resources and Harvesting Cost Using GIS (GIS를 이용한 산림 바이오매스 자원량 및 수확비용 예측)

  • Lee, Jin-A;Oh, Jae-Heun;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.29 no.1
    • /
    • pp.81-89
    • /
    • 2013
  • Nowadays, excessive using of fossil fuel contributes to global warming. Also, this phenomenon increases steadily. Therefore forest biomass from logging residues has received attention. The goal of this study was to determine the sustainability and economic feasibility of forest-biomass energy source. Accordingly, forest biomass resource was calculated, and harvesting and transporting machines which can be used in investing area were chosen, when using forest biomass as energy source. And then through these data, the harvesting cost was decided. The forest biomass resource calculated, thinned trees and logging residues, was 37,330.23 $m^3$ and 14,073.60 ton, respectively. When harvesting timber in each sub-compartment, the average thinned trees yield was 120.73 $m^3$, and tree logging residues was 402.80 ton. The use of tower yarder as harvesting and transporting equipments in study area was 85.4% and 66.7%, respectively, in up hill and down hill yarding. The average harvesting cost of biomass in the possibility area of timber yarding operation was expensive as 81,757 won/$m^3$, 85,434 won/m3 and 50,003 won/ton, respectively, in thinned trees and logging residue. If using data from this research analysis, tree could be felled by choosing sub-compartment.

An Analysis of the Operational Cost in the Whole-tree and Cut-to-Length Logging Operation System (전목 및 단목 집재작업시스템에서 작업비용 분석)

  • Kim, Min-Kyu;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.2
    • /
    • pp.229-238
    • /
    • 2013
  • This study was conducted to analyze on the operational cost of logging operations in the whole-tree logging operation system by tower-yarder and swing-yarder, and in the cut-to-length logging operation system by excavator with grapple in order to spread efficient logging operation technique and to establish the logging operation system. In the results of the analysis of operation cost, in case of the whole-tree logging operation system, the operation cost was 2,099 won/$m^3$ in felling by chain saw, 28,286 won/$m^3$ in yarding by tower-yarder, 18,265 won/$m^3$ in yarding by swing-yarder, 18,939 won/$m^3$ in bucking by excavator with grapple and chain saw, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle. In case of the cut-to-length logging operation system, the operation cost was 10,160 won/$m^3$ in felling and bucking by chain saw, 7,567 won/$m^3$ in cut-to-length extraction by excavator with grapple, 6,982 won/$m^3$ in branches and leaves extraction by excavator with grapple, 3,040 won/$m^3$ in the operation road construction by excavator with grapple, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle.

A Recovery Technique Using Client-based Logging in Client/Server Environment

  • Park, Yong-Mun;Lee, Chan-Seob;Kim, Dong-Hyuk;Park, Eui-In
    • Proceedings of the IEEK Conference
    • /
    • 2002.07a
    • /
    • pp.429-432
    • /
    • 2002
  • The existing recovery technique using the logging technique in the client/sewer database system only administers the log as a whole in a server. This contains the logging record transmission cost on the transaction that is executed in each client potentially and increases network traffic. In this paper, the logging technique for redo-only log is suggested, which removes the redundant before-image and supports the client-based logging to eliminate the transmission cost of the logging record. Also, in case of a client crash, redo recovery through a backward client analysis log is performed in a self-recovering way. In case of a server crash, the after-image of the pages which needs recovery through simultaneous backward analysis log is only transmitted and redo recovery is done through the received after-image and backward analysis log. Also, we select the comparing model to estimate the performance about the proposed recovery technique. And we analyzed the redo and recovery time about the change of the number of client and the rate of updating operation.

  • PDF

Harvesting Cost and Productive of Tree-Length Thinning in a Pinus densiflora Stand Using the Tower Yarder (HAM300)

  • Cho, Minjae;Cho, Koohyun;Jeong, Eungjin;Lee, Jun;Choi, Byoungkoo;Han, Sangkyun;Cha, Dusong
    • Journal of Forest and Environmental Science
    • /
    • v.32 no.2
    • /
    • pp.189-195
    • /
    • 2016
  • Logging equipment and method have a major influence on harvesting productivity and cost. This study investigated the productivity and operational costs of tree-length cable yarding system using HAM300, a domestically developed tower yarder. We tested HAM300 for thinning operation in Pinus densiflora stands at Gangreung, Gangwon-do on April, 2014. To assess the productivity we conducted time study for each stage of the operation. When the average time/cycle was examined for each stage of the operation, the longest was for yarding (241 sec), followed by delimbing (237 sec), felling (153 sec), and processing (103 sec). Furthermore, productivity for felling was $8.6m^3/hr$, followed by delimbing ($5.1m^3/hr$), yarding ($3.5m^3/hr$), and processing ($8.1m^3/hr$). The total cost for the tree-length logging system was $58,446won/m^3$, of which the majority was incurred by the yarding cost at $46,217won/m^3$ (79.3%), whereas the lowest cost was for felling at $2,359won/m^3$ (4.1%). We suggest that it is necessary to foster specialized operators and provide training in operating the tower yarder thereby implementing efficient harvesting system resulting from low-cost yarding.

An Analysis of the Operational Productivity and Cost for the Utilization of Forest-biomass(II) - the Analysis of Operational Cost - (산림바이오매스 이용을 위한 산림작업 공정 및 비용 분석(II) - 작업비용 분석 -)

  • Mun, Ho-Seong;Cho, Koo-Hyun;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.2
    • /
    • pp.230-238
    • /
    • 2015
  • This study was analyzed the operational cost of logging and chipping operations in order to develop the efficient logging operation system for the utilization of forest-biomass. Analysis of the operational cost of logging operation systems, the operation system D which include chain saw, tower-yarder, mini-forwarder and truck was calculated the lowest cost to be $68,498Won/m^3$. In the utilization of forest-biomass, the operation system E which include chipping by mini-chipper at the site, forwarding of chips by mini-forwarder, transportation of chips by truck was estimated to be 90,770 Won/Ton. Thus, These results are determined as an effective operating system for logging operation and the utilization of forest-biomass.

Choosing Economical Optimum Logging Machines Based on the Operating Volume (작업량(作業量)에 따른 적정(適正) 집재기계(集材機械)의 선정(選定))

  • Park, Jong-Myung
    • Journal of Korean Society of Forest Science
    • /
    • v.86 no.4
    • /
    • pp.450-458
    • /
    • 1997
  • It is inadequate to compare operating costs between some logging machines with a low rate of utilization of them except the effect of operating time. The operating volume to maximize the utilization of the logging machines is different from each other, thus it is important to choose the proper logging machines and operating system according to the size of logging management. This study presents one of the methods to choose the economical optimum logging machines according to the operating volume to promote the economical efficiency of the machines. In order to go ahead with the Korean forestry mechanization plan, it should be considered which machine or operating system has the economical priority and if it can be suitable to the effect of wage increment.

  • PDF

Redeveloped Work Criteria and Cost Unit in Grassland Establishment (초지조성방법에 따른 작업항목의 재설정 및 초지조성단가 추정)

  • Yoon, Byung Ku;Kim, Ji Yung;Kim, Byong Wan;Sung, Kyung Il
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.42 no.1
    • /
    • pp.32-40
    • /
    • 2022
  • In this study, the appropriate unit cost in grassland establishment was redeveloped by the grassland establishment method and work criteria. The grassland establishment method was divided into tillage establishment (all logging) and no-tillage establishment (all logging and partial logging). The price for the work criteria by the establishment method was presented for each permission/authorization and establishment work. In permission/authorization for grassland establishment, the cost of each work criteria was of environmental impact (small scale environmental impact) assessment, disaster impact assessment, cadastral serving fee, forest survey, and connection fee for control of mountainous districts. In establishment was of logging, cleaning/gruffing, plowing/soil preparation, seeding, fertilization, livestock manure compost, seed, herbicide, labor cost (fertilizer, seed and herbicide), soil consolidation, cattle trail, and fence. The unit cost of grassland establishment was KRW 115,894,212 for the tillage establishment, and KRW 110,281,572 and KRW 106,680,122 for the all and partial logging of the no-tillage establishment, respectively. The current study redeveloped the establishment method, work criteria, and estimation of the unit cost of grassland establishment. It can be usefully used to carry out government projects to support related to establishment and maintenance of grassland.

Low-Cost Causal Message Logging based Recovery Algorithm Considering Asynchronous Checkpointing (비동기적 검사점 기록을 고려한 저 비용 인과적 메시지 로깅 기반 회복 알고리즘)

  • Ahn, Jin-Ho;Bang, Seong-Jun
    • The KIPS Transactions:PartA
    • /
    • v.13A no.6 s.103
    • /
    • pp.525-532
    • /
    • 2006
  • Compared with the previous recovery algorithms for causal message logging, Elnozahy's recovery algerian considerably reduces the number of stable storage accesses and enables live processes to execute their computations continuously while performing its recovery procedure. However, if causal message logging is used with asynchronous checkpointing, the state of the system may be inconsistent after having executed this algorithm in case of concurrent failures. In this paper, we show these inconsistent cases and propose a low-cost recovery algorithm for causal message logging to solve the problem. To ensure the system consistency, this algorithm allows the recovery leader to obtain recovery information from not only the live processes, but also the other recovering processes. Also, the proposed algorithm requires no extra message compared with Elnozahy's one and its additional overhead incurred by message piggybacking is significantly low. To demonstrate this, simulation results show that the first only increases about 1.0%$\sim$2.1% of the recovery information collection time compared with the latter.

Analyzing the Comparative Economic Efficiency of Short-wood Woodgrab Logging and Whole-tree Cable Logging Operations (Woodgrab을 이용한 단목집재와 가선집재방식에 의한 전목집재의 경제적 효율성 비교분석)

  • Seol, Ara;Han, Hee;Jung, Yoonkoo;Chung, Hyejean;Chung, Joosang
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.2
    • /
    • pp.231-237
    • /
    • 2016
  • This research was conducted in order to examine whether the Woodgrab short-wood logging method, most widely used logging method in Korea, is more favorable than other logging methods in terms of productivity and profitability. For the comparative purposes, whole-tree logging methods with cable yarding system using a swing yarder and a tower yarder were evaluated. The productivity and the profitability of the logging operations by the machine types on a L. kaempferi stand were estimated by simulating logging processes based on bucking patterns and the results were compared. As a result, the Woodgrab short-wood logging system showed the most favorable results in terms of skidding productivity and operating cost. On the contrary, the system was the least profitable among the three logging methods. Main reason is that while the system may be beneficial in terms of operation productivity, it is restricted to produce only short logs mainly for low quality raw materials such as pulp, bolts, etc. which are sold at cheap prices.