• Title/Summary/Keyword: Local Council

Search Result 151, Processing Time 0.016 seconds

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.