• Title/Summary/Keyword: Load management

Search Result 2,146, Processing Time 0.028 seconds

Development of Section Load Estimation Program for Smart Distribution Management System (스마트배전 운영시스템용 구간부하 추정 프로그램 개발)

  • Yun, Sang-Yun;Chu, Chul-Min;Kwan, Seung-Chul;Song, Il-Keun;Lim, Sung-Il
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.8
    • /
    • pp.1083-1090
    • /
    • 2012
  • In this paper, we present the section load estimation program of distribution system for smart distribution management system. The proposed program is composed with three parts. One is the consistency check part for switch measurements which consist a section. The consistency check is divided into the current and angle test. For the current test, we examine the input and output power flow for the switch group. For the angle test, the result of power flow calculation at previous step is used. Another is the voltage estimation part for the measured switches. We use the weighted least square (WLS) method for the voltage estimation. The third is the part of final section load calculation. The database structure for accomplishing the developed estimation program is also proposed. To verify the accuracy of the experimental results, case studies are performed using a actual data of Jeju island. The developed program can be effectively applied to the distribution operation systems.

Power Demand Forecasting in the DC Urban Railway Substation (직류 도시철도 변전소 수요전력 예측)

  • Kim, Han-Su;Kwon, Oh-Kyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.11
    • /
    • pp.1608-1614
    • /
    • 2014
  • Power demand forecasting is an important factor of the peak management. This paper deals with the 15 minutes ahead load forecasting problem in a DC urban railway system. Since supplied power lines to trains are connected with parallel, the load characteristics are too complex and highly non-linear. The main idea of the proposed method for the 15 minutes ahead prediction is to use the daily load similarity accounting for the load nonlinearity. An Euclidean norm with weighted factors including loads of the neighbor substation is used for the similar load selection. The prediction value is determinated by the sum of the similar load and the correction value. The correction has applied the neural network model. The feasibility of the proposed method is exemplified through some simulations applied to the actual load data of Incheon subway system.

A Study on Selection Method of Management Watershed for Total Pollution Load Control at Tributary (지류총량관리를 위한 관리유역 선정 방법에 관한 연구)

  • Hwang, Ha Sun;Lee, Sung Jun;Ryu, Jichul;Park, Ji Hyung;Kim, Yong Seok;Ahn, Ki Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.6
    • /
    • pp.528-536
    • /
    • 2016
  • The purpose of Total Pollution Load Control at Tributary is to obtain maximum improvement effect of water quality through finding the most impaired section of water-body and establishing the proper control measure of pollutant load. This study was implemented to determine the optimal management of reach, period, condition, watershed, and pollution source and propose appropriate reduction practices using the Load duration curve (LDC) and field monitoring data. With the data of measurement, LDC analysis shows that the most impaired condition is reach V (G4~G5), E group (flow exceedance percentile 90~100%) and winter season. For this reason, winter season and low flow condition should be preferentially considered to restore water quality. The result of pollution analysis for the priority reach and period shows that agricultural nonpoint source loads from onion and garlic culture are most polluting. Therefore, it is concluded that agricultural reuse of surface effluent (storm-water runoff with non-point sources) and low impact farming that includes reducing fertilization and controlling the height of drainage outlet are efficient water quality management for this study watershed.

An Adaptive Control of Smart Appliances with Peak Shaving Considering EV Penetration (전기자동차 침투율을 고려한 피크 부하 저감용 스마트 기기의 적응적 제어)

  • Haider, Zunaib Maqsood;Malik, Farhan H.;Rafique, M. Kashif;Lee, Soon-Jeong;Kim, Jun-Hyeok;Mehmood, Khawaja Khalid;Khan, Saad Ullah;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.730-737
    • /
    • 2016
  • Electric utilities may face new threats with increase in electric vehicles (EVs) in the personal automobile market. The peak demand will increase which may stress the distribution network equipment. The focus of this paper is on an adaptive control of smart household appliances by using an intelligent load management system (ILMS). The main objectives are to accomplish consumer needs and prevent overloading of power grid. The stress from the network is released by limiting the peak demand of a house when it exceeds a certain point. In the proposed strategy, for each smart appliance, the customers will set its order/rank according to their own preferences and then system will control the household loads intelligently for consumer reliability. The load order can be changed at any time by the customer. The difference between the set and actual value for each load's specific parameter will help the utility to estimate the acceptance of this intelligent load management system by the customers.

An Enhanced Response Time Mechanism in Grid Systems

  • Lee, Seong-Hoon
    • International Journal of Contents
    • /
    • v.6 no.2
    • /
    • pp.10-13
    • /
    • 2010
  • For applications that are grid enabled, the grid can offer a resource balancing effect by scheduling grid jobs on machines with low utilization. When jobs communicate with each other, the internet, or with storage resources, an advanced scheduler could schedule them to minimize communications traffic or minimize the distance of the communications. We propose an intelligent load distribution algorithm to minimize communications traffic and distance of the communications using genetic algorithm. The experiments show the proposed load redistribution algorithm performs efficiently in the variance of load in grid environments.

Evaluation of SWAT2000 Model Application for Estimating Delivered Nutrients Load for the Gap Stream Watershed (갑천유역의 영양염류 유달부하량 산정을 위한 SWAT2000 모형의 적용성 평가)

  • Moon, Jong-Pil;Kim, Tai-Cheol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.6
    • /
    • pp.89-100
    • /
    • 2006
  • In order to estimate delivered nutrients load from non-point sources in the Gap stream watershed in Daejeon, a distributed watershed model SWAT2000 was used so that it could predict the impact of land management practices on water, sediments and chemicals yields in large complex watersheds with varing soils, land uses and management condition over long period of time. The SWAT2000 was applied to the Daejeon (Indong), Yudeung (Boksu) and Gap (Hoeduck) streams for TMDL (Total Maximum Daily Load) of nutrients. The observed water quality and streamflow data of the year of 2002 and 2003 were used for calibration, and those of the year 2004 and 2005 were used for validation. Simulated results were evaluated by Estimation Efficiency Analysis (COE), Regression Analysis $(R^2)$ and Relative Error (R.E.) for the nutrients amounts on the monthly and yearly basis by comparing observed load with estimated load obtained by using SWAT2000 simulations. The COE value fur T-N was ranged from 0.59 to 0.78, $R^2$ values for T-N ranged from 0.65 to 0.84, and R.E values fur T-N load ranged from 4% to 20%. COE value far T-N was ranged from 0.59 to 0.73, $R^2$ values for T-P ranged from 0.67 to 0.82, and R.E values for T-P load ranged from 3% to 25%. Estimated results of SWAT2000 simulation for 3 sites (Indong, Boksu, Hoedeok) were reasonably satisfactory. This study indicated that SWAT2000 model could be applicable to estimate the nutrients load from the Gap stream watershed in Korea.

A Study on Development of Management Targets and Evaluation of Target Achievement for Non-point Source Pollution Management in Saemangeum Watershed (새만금 비점오염원 관리지역에서의 목표설정 및 달성도 평가방법론 연구)

  • Kim, Eun-Jung;Park, Bae-Kyung;Kim, Yong-Seok;Rhew, Doug-Hee;Jung, Kwang-Wook
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.8
    • /
    • pp.480-491
    • /
    • 2015
  • In this study, methods using LDC (Load Duration Curve) and watershed model were suggested to develope management targets and evaluate target achievement for non-point source pollution management considering watershed and runoff characteristics and possibility for achievement of target. These methods were applied for Saemangeum watershed which was designated as nonpoint source pollution management area recently. Flow duration interval of 5 to 40% was selected as flow range for management considering runoff characteristics and TP was selected as indicator for management. Management targets were developed based on scenarios for non-point source pollutant reduction of management priority areas using LDC method and HSPF model which was calibrated using 4 years data (2009~2012). In the scenario of LID, road sweeping and 50% reduction in CSOs and untreated sewage at Jeonju A20 and 30% reduction in fertilizer and 50% in livestock NPS at Mankyung C03, Dongjin A14 and KobuA14, management targets for Mangyung bridge, Dongjin bridge, Jeonju stream and Gunpo bridge were developed as TP 0.38, 0.18, 0.64 and 0.16 mg/L respectively. When TP loads at the target stations were assumed to have been reduced by a certain percentage (10%), management targets for those target stations were developed as TP 0.35, 0.17, 0.60 and 0.15 mg/L respectively. The result of this study is expected to be used as reference material for management master plan, implementation plan and implementation assessment for non-point source management area.

Applicability of Water Quality Indicators as Target Pollutants for Total Maximum Daily Loads (수질오염총량관리를 위한 대상물질 적용성 분석)

  • Park, Jun Dae;Oh, Seung Young;Park, Jae Hong
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.531-539
    • /
    • 2013
  • In order to apply a water quality indicator as a certain target pollutant, the indicator should have the representability of an index for the management of Total Maximum Daily Loads (TMDLs). Scientific groundwork and treatment technologies also should be provided for the application of the indicator. This study analyzed the applicability of major water quality indicators for target pollutants. The results showed that four water quality indicators of TOC, T-N, SS & T-Coli can be considered as target pollutants besides existing BOD and T-P. These indicators can be applied with the preparations such as essential basic data, pollution load estimation framework as well as legal criteria setting when the need is raised. As the importance of TOC, which is considered as a replacement of BOD, is emphasized, technical and institutional terms are being prepared in order to determine TOC as another target pollutant in the near future. It could be considered to combine TOC with BOD for the time being during the $3^{rd}$ stage of TMDLs in view of the present conditions for the management of TOC. TOC can be the most effective index for the organic matter and help to be managed more systematically in the waterbodies where rivers and lakes are mutually connected.

A Power Management Unit for Solar Energy Harvesting (빛 에너지 하베스팅을 위한 전력관리회로)

  • Yoon, Eun-Jung;Hwang, In-Ho;Park, Jong-Tae;Yu, Chong-Gun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.267-271
    • /
    • 2012
  • In this paper a power management unit for solar energy harvesting is proposed. If solar energy is sufficient, Power Management Unit(PMU) directly supplies load with solar energy. By contrast, if solar energy is insufficient to operate sensor nodes, voltage booster(VB) boosts the solar cell's output voltage, and then PMU supplies load with the harvested energy. The designed circuit had been fabricated using a 018um CMOS process. In the first case, the PMU supplies load with more energy than in the second case. In the second case where a VB is used, the PMU operates to supply load with solar energy even when illumination is low and minimum solar cells with very low output voltage are used.

  • PDF