• 제목/요약/키워드: Load Shedding

검색결과 167건 처리시간 0.025초

Bistable tuned mass damper for suppressing the vortex induced vibrations in suspension bridges

  • Farhangdoust, Saman;Eghbali, Pejman;Younesian, Davood
    • Earthquakes and Structures
    • /
    • 제18권3호
    • /
    • pp.313-320
    • /
    • 2020
  • The usage of conventional tuned mass damper (TMD) was proved as an effective method for passive mitigating vortex-induced vibration (VIV) of a bridge deck. Although a variety of linear TMD systems have been so far utilized for vibration control of suspension bridges, a sensitive TMD mechanism to wind spectrum frequency is lacking. Here, we introduce a bistable tuned mass damper (BTMD) mechanism which has an exceptional sensitivity to a broadband input of vortex shedding velocity for suppressing VIV in suspension bridge deck. By use of the Monte Carlo simulation, performance of the nonlinear BTMD is shown to be more efficient than the conventional linear TMD under two different wind load excitations of harmonic (sinusoidal) and broadband input of vortex shedding. Consequently, an appropriate algorithm is proposed to optimize the design parameters of the nonlinear BTMD for Kap Shui Mun Bridge, and then the BTMD system is localized for the interior deck of the suspension bridge.

첨두부하 저감을 위한 비상발전기 연계형 STS 운영 방안에 관한 연구 (A Study on Operation Scheme of STS with Emergency Generator for Peak Shedding)

  • 김창환;이상봉;김규호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.155-156
    • /
    • 2015
  • Recently, electricity consumption has rapidly increased along with economic growth. The operating strategy using emergency generator is aimed, to resolve a demand response management. For strategy of peak shedding using emergency generator, it is essential to introduce the fast transfer switching device. One of the most effective solutions is to use a static transfer switch (STS) based on thyristor. However, the characteristic of natural commutated SCR thyristor should anticipate short duration voltage sag. STS system thus requires more than a quarter cycle to successfully complete transfer process. This paper proposes the operation scheme of the STS system using the forced-commutation technique to mitigate instantaneous voltage sag during peak transfer process. Proposed STS system improved turn-off characteristic thus accomplishes the peak load shedding satisfied power quality. Performance of the proposed STS system is evaluated using electromagnetic transient program (EMTP) to confirm the effectiveness.

  • PDF

배전계통조류계산을 위한 새로운 알고리즘에 관한 연구 (A Study on Development of a New Algorithm to Solve Load Flow for Distribution Systems)

  • 문영현;유성영;최병곤;하복남;이중호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.918-922
    • /
    • 1998
  • With the development of industry, the qualitical advancement of power is needed. Since it is placed in the end step of power system, the fault at the distribution system causes some users blackout directly. So if the fault occurs, quick restoration is very important subject and, for the reason, induction of the distribution automation system is now being progressed briskly. For the quick restoration of the faulted distribution system, the load shedding of the blackout-area must be followed, and the other problems like the shedded load, faulted voltage and the rest may cause other accident. Accordingly load shedding must be based on the precise calculation technique during the distribution system load flow(dist flow) calculation. In these days because of its superior convergence characteristic the Newton-Raphson method is most widely used. The number of buses in the distribution system amounts to thousands, and if the fault occurs at the distribution system, the speed for the dist flow calculation is to be improved to apply to the On-Line system. However, Newton-Raphson method takes much time relatively because it must calculate the Jacobian matrix and inverse matrix at every iteration, and in the case of huge load, the equation is hard to converge. In this thesis. matrix equation is used to make algebraical expression and then to solve load flow equation and to modify above defects. Then the complex matrix is divided into real part and imaginary part to keep sparcity. As a result time needed for calculation diminished. Application of mentioned algorithm to 302 bus, 700 bus, 1004 bus system led to almost identical result got by Newton-Raphson method and showed constant convergence characteristic. The effect of time reduction showed 88.2%, 86.4%, 85.1% at each case of 302 bus, 700 bus system 86.4%, and 1004 bus system.

  • PDF

Viral load and rebound in children with coronavirus disease 2019 during the first outbreak in Daegu city

  • Chu, Mi Ae;Jang, Yoon Young;Lee, Dong Won;Kim, Sung Hoon;Ryoo, Namhee;Park, Sunggyun;Lee, Jae Hee;Chung, Hai Lee
    • Clinical and Experimental Pediatrics
    • /
    • 제64권12호
    • /
    • pp.652-660
    • /
    • 2021
  • Background: Viral load and shedding duration are highly associated with the transmission of severe acute respiratory syndrome coronavirus-2 (SARS-CoV-2) infection. However, limited studies have reported on viral load or shedding in children and adolescents infected with sudden acute respiratory syndrome coronavirus 2 (SARS-CoV-2). Purpose: This study aimed to investigate the natural course of viral load in asymptomatic or mild pediatric cases. Methods: Thirty-one children (<18 years) with confirmed SARS-CoV-2 infection were hospitalized and enrolled in this study. Viral loads were evaluated in nasopharyngeal swab samples using real-time reverse transcription polymerase chain reaction (E, RdRp, N genes). cycle threshold (Ct) values were measured when patients met the clinical criteria to be released from quarantine. Results: The mean age of the patients was 9.8 years, 18 (58%) had mild disease, and 13 (42%) were asymptomatic. Most children were infected by adult family members, most commonly by their mothers. The most common symptoms were fever and sputum (26%), followed by cough and runny nose. Nine patients (29%) had a high or intermediate viral load (Ct value≤30) when they had no clinical symptoms. Viral load showed no difference between symptomatic and asymptomatic patients. Viral rebounds were found in 15 cases (48%), which contributed to prolonged viral detection. The mean duration of viral detection was 25.6 days. Viral loads were significantly lower in patients with viral rebounds than in those with no rebound (E, P=0.003; RdRp, P=0.01; N, P=0.02). Conclusion: Our study showed that many pediatric patients with coronavirus disease 2019 (COVID-19) experienced viral rebound and showed viral detection for more than 3 weeks. Further studies are needed to investigate the relationship between viral rebound and infectiousness in COVID-19.

The Development of Intelligent Direct Load Control System

  • Choi, Sang Yule
    • International journal of advanced smart convergence
    • /
    • 제4권2호
    • /
    • pp.103-108
    • /
    • 2015
  • The electric utility has the responsibility of reducing the impact of peaks on electricity demand and related costs. Therefore, they have introduced Direct Load Control System (DLCS) to automate the external control of shedding customer load that it controls. Since the number of customer load participating in the DLC program are keep increasing, DLCS operators a re facing difficulty in monitoring and controlling customer load. The existing DLCS needs constant operator intervention, e.g., whenever the load is about to exceed a predefined amount, it needs operator's intervention to control the on/off status of the load. Therefore, DLCS operators need the state-of-the-art DLCS, which can control automatically the on/off status of the customer load without intervention as much as possible. This paper presents an intelligent DLCS using the active database. The proposed DLCS is applying the active database to DLCS which can avoid operator's intervention as much as possible. To demonstrate the validity of the proposed system, variable production rules and intelligent demand controller are presented.

Development of Load Control and Demand Forecasting System

  • Fujika, Yoshichika;Lee, Doo-Yong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.104.1-104
    • /
    • 2001
  • This paper presents a technique to development load control and management system in order to limits a maximum load demand and saves electric energy consumption. The computer programming proper load forecasting algorithm associated with programmable logic control and digital power meter through inform of multidrop network RS 485 over the twisted pair, over all are contained in this system. The digital power meter can measure a load data such as V, I, pf, P, Q, kWh, kVarh, etc., to be collected in statistics data convey to data base system on microcomputer and then analyzed a moving linear regression of load to forecast load demand Eventually, the result by forecasting are used for compost of load management and shedding for demand monitoring, Cycling on/off load control, Timer control, and Direct control. In this case can effectively reduce the electric energy consumption cost for 10% ...

  • PDF

A New Required Reserve Capacity Determining Scheme with Regard to Real time Load Imbalance

  • Park, Joon Hyung;Kim, Sun Kyo;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권2호
    • /
    • pp.511-517
    • /
    • 2015
  • Determination of the required reserve capacity has an important function in operation of power system and it is calculated based on the largest loss of supply. However, conventional method cannot be applied in future power system, because potential grid-connected distributed generator and abnormal temperature cause the large load imbalance. Therefore this paper address new framework for determining the optimal required reserve capacity taking into account the real time load imbalance. At first, we introduce the way of operating reserve resources which are the secondary, tertiary, Direct Load Control (DLC) and Load shedding reserves to make up the load imbalance. Then, the formulated problem can be solved by the Probabilistic Dynamic Programming (PDP) method. In case study, we divide two cases for comparing the cost function between the conventional method and the proposed method.

자가발전설비가 있는 산업플랜트의 전력계통 응동 해석 (Electrical Power System Studies for an Industrial Cogeneration Power Plant)

  • 윤제훈;임성호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1215-1217
    • /
    • 1999
  • Electrical studies are required to assure the proper integration of cogeneration facility into a industrial plant electrical system and the connected utility grid. Details of such study efforts are presented, including boundary limit for the system modeling, short-circuit and load flow studies, stability studies, load shedding studies, and harmonics studies.

  • PDF

전력계통 계획용 최적운전 모델 (Constrained Economic Dispatch for Planning purpose)

  • 백영식;권영한;추진부
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1992년도 하계학술대회 논문집 A
    • /
    • pp.100-102
    • /
    • 1992
  • Optimal generation dispatch algorithm is developed using L.P and load dispatch method. The algorithm is composed with three steps. Fist phase, analytical algorithm is adopted to solve to minimize quadratic cost functions which fits well for planning purpose. Second phase uses L.P method for obtain economic redispatch that satisfies line constraints. When there is no solution whitch satisfy line constraints load shedding algorithm solves the problem.

  • PDF