• 제목/요약/키워드: Linear Program Model

검색결과 531건 처리시간 0.032초

퍼지 선형계획법 해법 및 퍼지 DEA에의 적용에 관한 연구 (A Study on a Solution Approach to Fuzzy Linear Programs and Its Application to Fuzzy DEA Models)

  • 임성묵
    • 산업경영시스템학회지
    • /
    • 제31권2호
    • /
    • pp.51-60
    • /
    • 2008
  • A solution method for fuzzy linear programs is proposed. A fuzzy linear program is converted to a crisp linear program with average indices being applied to the objective function and constraints. A comparative analysis between the proposed average index approach and the possibilistic approach is given. As an application example, the proposed method is applied to the linear programming model for fuzzy data envelopment analysis, and the result is compared with that of the possibilistic approach.

이동경화 모델에 기반한 MS1470 강판의 스프링백 예측 (Spring-back Prediction of MS1470 Steel Sheets Based on a Non-linear Kinematic Hardening Model)

  • 박상천;박태준;고영우;석동윤;;;정관수
    • 소성∙가공
    • /
    • 제22권6호
    • /
    • pp.303-309
    • /
    • 2013
  • Spring-back of MS1470 steel sheets was numerically predicted using a non-linear kinematic hardening material behavior based on the Yoshida-Uemori model. From uniaxial tension and uniaxial tension-compression-tension data as well as the uniaxial tension-unloading-tension data, the parameters of the Yoshida-Uemori model were obtained. For the numerical simulations, the Yoshida-Uemori model was implemented into the commercial finite element program, ABAQUS/Explicit and ABAQUS/Standard using the user-defined material subroutines. The model performance was validated against the measured spring-back from the benchmark problems of NUMISHEET 2008 and NUMISHEET 2011, the 2-D draw bending test and the S-rail forming test, respectively.

수리해석 모형과 GIS를 이용한 통합 용수배분 시스템 (Integrated Water Distribution Network System using the Mathematical Analysis Model and GIS)

  • 권재섭;조명희
    • 한국지리정보학회지
    • /
    • 제4권4호
    • /
    • pp.21-28
    • /
    • 2001
  • 본 연구에서는 기존에 개발된 상수도 관련 GIS(geographic information system)에서 관로해석을 위한 자료를 자동으로 입력할 수 있고, 사용자를 위한 GUI(geographic user interface)를 제공하는 GNLP(GIS linked non-linear pipe network analysis program)프로그램을 개발하였다. 관로시스템의 수리해석은 Hazen-Williams의 손실수두방정식을 기초로 한 비선형 해석기법을 이용하여 시행하였으며, 데이터베이스 응용 프로그램을 작성하기 위해서 관계형 데이터베이스 관리시스템(RDBMS ; relational database management system)인 Microsoft사의 Microsoft Access를 사용하였다. 이 GNLP 프로그램은 실제 관망설계자가 관로시스템의 수리해석에 필요한 자료의 입력을 용이하게 할 수 있도록 시스템환경을 개선하였다. 그리고 압력 및 유량 등 관로시스템의 수리적 해석 결과를 표 및 챠트 형태로 출력이 가능하고, Excel 파일로 변환이 가능하다. 또한 GIS의 중요 요소인 질의(query) 기능이나 분석된 자료를 확인하고자 할 때 이를 효과적으로 디스플레이가 가능하도록 개발되었다.

  • PDF

A Mixed 0-1 Linear Program for the Inspection Location Problem

  • Yum, Bong-Jin
    • 대한산업공학회지
    • /
    • 제10권1호
    • /
    • pp.11-16
    • /
    • 1984
  • An economic model is developed for determining optimal locations of screening inspection stations in a multistage production system. The effect of screening inspection on the production rate is explicitly considered, and a fixed cost for maintaining an inspection station is assumed. The product is allowed to have multiple defects, each of which may be inspected at any inspection station after the defect-generating operation. The problem is formulated as a mixed 0-1 linear program which offers the advantage of versatility in handling various system constraints.

  • PDF

보강토 옹벽의 거동에 관한 유한요소 해석 (Finite Element Analysis of Reinforced Earth Wall Behavior)

  • 최인석;장연수;조광철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.805-812
    • /
    • 2003
  • The purpose of this study is to evaluate the behavior of a reinforced earth wall by modeling the properties of the interface between soil and reinforced elements as well as the non-linear stress-strain characteristics of soil. The effect of lateral earth pressures induced during construction is also included in the analyses. The interface element used to evaluate the relative movement of the interface between soil/reinforcement and soil/wall- facing has a zero thickness and essentially consists of normal and shear springs. The behavior of soil element is calculated based on the hyperbolic model. The computer program SSCOMPPC which includes the interface element, hyperbolic model and bi-linear model is applied in this study. From the analyses, it is showed that the locus of maximum tension were closed to the hi-linear failure line of theoretical analyses. The lateral displacement of SSCOMPPC is larger than that of the FLAC which adopts the elastic model. This means the analysis which is adopted the hyperbolic model and interface element induced more larger displacement.

  • PDF

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

뉴럴 네트워크 및 선형 회귀식을 이용한 줄눈 콘크리트 포장의 한계 응력 계산 (Calculation Of Critical Stress On Jointed Concrete Pavement By Using Neural Networks & Linear Regression Models)

  • 강태욱;류성우;김성민;조윤호
    • 한국도로학회논문집
    • /
    • 제10권3호
    • /
    • pp.129-138
    • /
    • 2008
  • 기존 콘크리트 포장의 단면 설계 시 발생하는 문제점을 해결하기 위해 유한 요소법(FEM)을 이용하여 것이 하나의 방법론으로 부각되었으며 현재 한국형 포장 설계법 개발 연구에서도 적용 중에 있다. 본 연구에서는 ABAQUS와 포트란 해석 프로그램을 이용하여 콘크리트 포장의 한계 응력을 계산하였고, 그 결과를 뉴럴 네트워크와 선형 회귀식을 이용하여 비교 분석하였다. 입력 변수가 많지만 다양한 해석을 하지 못하는 경우(입력변수 6개에 대해 81 경우 수 해석)에 대해 구조해석 결과를 뉴럴 네트워크(이하 NN: Neural Networks)와 선형 회귀식으로 비교한 결과, 구조해석 결과와 다소 차이가 있음을 확인하였다. 반면 입력 변수를 줄이되 다양한 경우에 해석한 경우(입력 변수 3개에 대해 343 경우의 수)의 분석 결과, NN과 선형 회귀식이 구조해석 결과와 매우 유사한 결과가 나타나는 것을 알 수 있었다. 하지만 그래프의 (0,0), (1,1) 부분에서 NN이 선형 회귀식에 비해 더 정확한 것을 확인하였다. 이와 같은 연구 결과를 통해서 한국형 포장 설계법의 핵심인 응력 계산 모듈을 선형 회귀식보다 좀 더 정확한 NN으로 해석하는 것을 제안하였다.

  • PDF

헬리콥터 주로터 블레이드 동적밸런싱 시험을 위한 조절변수 최적화 연구 (A Study on Adjustment Optimization for Dynamic Balancing Test of Helicopter Main Rotor Blade)

  • 송근웅;최종수
    • 한국소음진동공학회논문집
    • /
    • 제26권6_spc호
    • /
    • pp.736-743
    • /
    • 2016
  • This study describes optimization methods for adjustment of helicopter main rotor tracking and balancing (RTB). RTB is a essential process for helicopter operation and maintenance. Linear and non-linear models were developed with past RTB test results for estimation of RTB adjustment. Then global and sequential optimization methods were applied to the each of models. Utilization of the individual optimization method with each model is hard to fulfill the RTB requirements because of different characteristics of each blade. Therefore an ensemble model was used to integrate every estimated adjustment result, and an adaptive method was also applied to adjustment values of the linear model to update for next estimations. The goal of this developed RTB adjustment optimization program is to achieve the requirements within 2 run. Additional tests for comparison of weight factor of the ensemble model are however necessary.

기존 농업용 저수지에서의 유효저수량의 평가 (Evaluation of the Effective Storage of Existing Agricultural Reservoir)

  • 안태진;조동호;이상호;최계윤;윤용남
    • 한국수자원학회논문집
    • /
    • 제37권5호
    • /
    • pp.353-361
    • /
    • 2004
  • 농업용 저수지의 유효저수량은 물수지 분석을 근거고 한 저수지 모의 운영을 통하여 결정하고 있다. 유역은 유출량에 관하여 고유한 특성을 갖고 있으므로 저수지에서 유효저수량의 결정은 유역으로부터의 유출량을 근거로 하는 것이 타당하다. 본 연구에서는 유역의 유출량을 근거로 한 추계학적 선형계획모형을 정립하고 저수지의 유효저수량을 분석하였다. 선형계획모형을 이용한 저수지 분석에 있어서 선형결정법칙은 Chance-constrained model과 함께 된 석년수와 관계없이 제약조건식을 줄이는데 기여한다. 경기도 안성시에 소재하고 있는 금광저수지를 대상저수지고 선정하여 유효저수량을 분석한 결과, 추계학적 선형계획모형에 의한 유효저수량은 물수지 분석에 의한 것 보다 크게 분석되었다. 본 연구에서 제시된 선형계획모형에 의하여 적정한 유효저수량을 결정하고, 저수지 모의운영을 통하여 결정된 유효저수량의 성능을 평가하는 것이 타당한 것으로 판단된다.