• Title/Summary/Keyword: Line-to-Ground Voltage

Search Result 212, Processing Time 0.021 seconds

A Study on Modeling of Leakage Current in ESS Using PSCAD/EMTDC (PSCAD/EMTDC를 이용한 ESS의 누설전류 모델링에 관한 연구)

  • Kim, Ji-Myung;Tae, Dong-Hyun;Lee, Il-Moo;Lim, Geon-Pyo;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.810-818
    • /
    • 2021
  • A leakage current of ESS is classified mainly by the occurrence from a PCS(Power Conditioning System) section and an unbalanced grid current. The reason for the leakage current from the PCS section is a voltage change by IGBT (Insulated Gate Bipolar Transistor) switching and stray capacitance between the IGBT and heatsink. The leakage current caused by the grid unbalanced current flows to the ESS through the neutral line of grid-connected transformer for the ESS with a three limb iron type of Yg-wire connection. This paper proposes a mechanism for the occurrence of leakage current caused by stray capacitance, which is calculated using the heatsink formula, from the aspect of the PCS section and grid unbalance current. Based on the proposed mechanisms, this study presents the modeling of the leakage current occurrence using PSCAD/EMTDC S/W and evaluates the characteristics of leakage currents from the PCS section and grid unbalanced current. From the simulation result, the leakage current has a large influence on the battery side by confirming that the leakage current from the PCS is increased from 7[mA] to 34[mA], and the leakage current from an unbalanced load to battery housing is increased from 3.96[mA] to 10.76[mA] according to the resistance of the housings and the magnitude of the ground resistance.

Field Test and Performance Verification of On-board Oriented Train Control System (차상중심 열차제어시스템의 현장시험을 통한 성능검증)

  • Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5513-5521
    • /
    • 2015
  • There is an operational efficiency problem about wayside equipment applied to the domestic low-density branch as the equipment has been installed and operated similarly in the mainline. On-board oriented train control system, which has been developed for train safety and operation efficiency, ensures safe train operation without expensive ground control signal devices. Such system consists of on-board control system, wayside control system, and local control system. In this paper, the details of tests such as suitability test, communication test, and interface test are described by installing the on-board control system and wayside control system in field. Installation tests include checking power, voltage, cable connection, LED status, etc. Field applicability of the developed system is also verified through the dynamic operation tests with diverse scenarios, which are performed on the virtual line similar to the real environment including switch machine and level crossing gate. Dynamic operation tests were conducted for total 7 scenarios, and several tests were repeated for each scenario. The elapsed time for each operation was computed by analyzing main process log, and we could check that each operation was accomplished within several seconds. Furthermore, the developed system was verified through field test with an accredited institute, and testing certificates were issued.