• Title/Summary/Keyword: Lifting

Search Result 1,286, Processing Time 0.025 seconds

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

Analysis of a Long Volumetric Module Lift Using Single and Multiple Cranes

  • Khodabandelu, Ali;Park, JeeWoong;Choi, Jin Ouk;Sanei, Mahsa
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.563-570
    • /
    • 2022
  • Industrialized and modular construction is a growing construction technique that can transfer a large portion of the construction process to off-site fabrication yards. This method of construction often involves the fabrication, pre-assembly, and transportation of massive and long volumetric modules. The module weight keeps increasing as the modules become more complete (with infill) to minimize the work at the site and, as higher productivity can be achieved at the fabrication shop. Thus, a volumetric module delivery gets more challenging and risky. Despite its importance, past research paid relatively insufficient attention to the problem related to the lifting of heavy modules. This can be a complex and time-consuming problem with multiple lifting for transportation-and-installation operations both in fabrication yard and jobsite, and require complex crane operations (sometimes, more than one crane) due to crane load capacity and load balance/stability. This study investigates this problem by focusing on the structural perspective of lifting such long volumetric modules through simulation studies. Various scenarios of lifting a weighty module from the top using four lifting cables attached to crane hooks (either a single crane or double crane) are simulated in SAP software. The simulations account for various factors pertaining to structural indices, e.g., bending stress and deflection, to identify a proper method of module lifting from a structural point of view. The method can identify differences in structural indices allowing identification of structural efficiency and safety levels during lifting, which further allows the selection of the number of cranes and location of lifting points.

  • PDF

LIFTING PROPERTIES ON $L^{1}(\mu)$

  • Kang, Jeong-Heung
    • Communications of the Korean Mathematical Society
    • /
    • v.16 no.1
    • /
    • pp.119-124
    • /
    • 2001
  • In the paper we show that some operators defined on L$^1$($\mu$) and on C(K) into Banach space with the RNP have the lifting property.

  • PDF

Lifting Implementation of Reversible Deinterlacer

  • Ishida, Takuma;Soyama, Tatsuumi;Muramatsu, Shogo;Kikuchi, Hisakazu;Kuge, Tetsuro
    • Proceedings of the IEEK Conference
    • /
    • 2002.07a
    • /
    • pp.90-93
    • /
    • 2002
  • In this work, an efficient lifting implementation of invertible deinterlacing is proposed. The invertible deinterlacing is a technique developed for intra-frame-based video coding as a preprocessing. Unlike the conventional deinterlacing, it preserves the sampling density and has the invertibility. For a special selection of filters, it is shown that the deinterlacing can be implemented efficiently by an in-place computation. It is also shown that the deinterlacing can be combined with the lifting discrete wavelet transform (BWT) employed in JPEG2000. A bit modification of the original lifting DWT is shown to provide the simultaneous implementation of deinterlacing. This fact makes the proposed technique attractive for the application to Motion-JPEG2000. The inverse transform and the reversible lifting implementation are also discussed.

  • PDF

Design for Raising the Rate of Recovering use of Lifting Lug (리프팅 러그 재사용율 제고를 위한 설계)

  • 김상일
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.40 no.4
    • /
    • pp.59-65
    • /
    • 2003
  • With the fast growth of shipbuilding industry, in recent years several hundreds of thousands of lifting lugs for a year have been used. This paper is aimed at maximizing the recovering use of lifting lugs. In this study, we have evaluated the structural strength for present and modified lifting lugs under in-plane and out-of-plane load conditions. For this purpose, the equivalent stresses have been calculated by nonlinear elasto-plastic analysis using the finite element program ABAQUS. At the same time, the contact conditions between lifting lug and shackle pin are also considered.

Block Lifting Analysis to Examine the Cause of Cracking in the Hopper Top Plate (블록 리프팅 시 Hopper Tank부 균열 발생 가능성 검토를 위한 구조해석)

  • KIM SANG-IL
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.1 s.68
    • /
    • pp.16-19
    • /
    • 2006
  • With the fast growth of the shipbuilding industry, the number of lifting lugs used every year has reached onehundred. This paper is aimed at examining the cause of cracking in the hopper top plate, due to block lifting. First of all, we have investigated the fracture surface in the occurrence position of the crack of the hopper top plate, using the scanning electron microscope. In this study, we have evaluated the structural strength for COT super block under present lifting conditions. For this purpose, the equivalent stresses have been calculated by linear elastic analysis, using the finite element program ABAQUS.

Revised NIOSH lifting equation의 현장 적용

  • 기도형;정민근;임종호
    • Proceedings of the ESK Conference
    • /
    • 1995.04a
    • /
    • pp.106-110
    • /
    • 1995
  • A local manufacturing companyin which low back pain(LBP) complaints were frequently reported was selected, and regularly perfomed lifting tasks were investigated using questionnaires and the 1991 NIOSH lifting guide. Among several processes of manufacture in the company, three processes-forming, heating and packing-were studied, where most of tasks were perfomed through manual materials handling (MMH). Questionnaire surveys showed that anthropometric data such as stature, weight and someatotype did not affect and weight of load influenced significantly the incidence of LBP, and workers who expwrienced LBP was older than the inexperienced. In addition, safety education conducted at the company was found to be ineffective in preventing LBP injuries. Lifting indexes(LI) was ranged from 0.86 to 17.0 with an average of 4.49, which revealed that tasks performing in the selected factory were in danger of LBP, and should be ertonomically redesigned. The critical factor reducing LI was found to be the horizontal component in all three processes, and most of weight of load was heavier than load constant(23kg) of the 1991 NIOSH lifting equation in heating process and packing.

  • PDF

Construction of Cable Roof Structure for Pusan Main Stadium (부산종합운동장 주경기장 케이블 지붕구조물의 시공)

  • Lee, Ju-Young;Ryu, Sang-Hyon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.2 no.1 s.3
    • /
    • pp.51-58
    • /
    • 2002
  • Construction of roof structure, cable suspended structure, for Pusan main stadium is adapted a lifting method that is VSL lifting system. 5 processes are practiced for erection of the roof structure including the first lifting process for erection of upper cables and the second lifting process for erection of lower cables. Since all cables of this roof structure with two open spelter sockets are determined their length, some cable were wrong length, he roof structure would be unstable. But, At complete of erection for the roof structure each cable is attained to theoretical tension force with average 4% errors.

  • PDF

On the Preliminary Design of Marine Propellers by Lifting Line Theory (양력선(揚力線) 이론(理論)에 의한 추진기(推進器) 초기설계(初期設計)에 대하여)

  • Jin-Tae,Lee;Zae-Geun,Kim;Chang-Sup,Lee
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.17 no.3
    • /
    • pp.5-17
    • /
    • 1980
  • A basic procedure to design marine propellers by a curved lifting line theory was shown. By adapting discrete singularity method, it became possible to take into account of skew, rake and the contraction of slip stream in the early stage of preliminary design procedure. It is also shown that lifting line theory based on the discrete singularity method converges to a common solution obtained by induction factor method with a relatively small number of discrete elements. Lifting the blade geometry more accurately on the basis of hydrodynamic principles. A number of numerical results from lifting line calculation are presented for the purpose of comparison with the previous method, and with these results two sample designs are carried out, which are wake-adapted optimum and wake-adapted non-optimum propellers.

  • PDF

Development of the Design System for the Lifting Lug Structure (탑재용 러그 구조의 설계 시스템 개발)

  • 함주혁
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.04a
    • /
    • pp.189-194
    • /
    • 2000
  • Due to the rapid growth of ship building industry and increment of ship construction in Korea, several hundred thousand of lifting lugs per year, have been installed at the lifting positions of ship block and removed after finishing their function, therefore, appropriate design system for strength check or optimal design of each lug structure has been required in order to increase the capability of efficient design. In this study, design system of D-type lifting lug structure which is most popular and useful in shipyards, was developed for the purpose of initial design of lug structure. Developed system layout and graphic user interface for this design system based on the C++ language were explained step by step. Using this design system, more efficient performance of lug structural design will be expected on the windows of personal computer.

  • PDF