• 제목/요약/키워드: Life Cycle Energy Analysis

검색결과 318건 처리시간 0.026초

국가전력생산 시스템에 대한 전 과정 영향평가 (Life Cycle Assessment for National Electricity Generation Systems)

  • 김태운;김성호;정환삼;하재주;민경란;고순현
    • 한국에너지공학회:학술대회논문집
    • /
    • 한국에너지공학회 2004년도 춘계 학술발표회 논문집
    • /
    • pp.353-358
    • /
    • 2004
  • In recent, the trends in national energy Policy are established in the context of the integrated risk estimation for various national electricity generating options. The approach takes account of health, environmental, economic, and social aspects of electricity generation systems. In the present work, nuclear, coal, and LNG sources are chosen because these hold more than 90% of national total electricity generation in a descending order. A life cycle assessment (LCA) methodology is used for comparing environmental impacts of these options during the life cycle such as construction, operation as well as disposal stages. Here, the LCA consists of life cycle inventory analysis, classification/selection process of impact categories, characterization process, and normalization process of each category. LCA can be an useful tool for environmental impact assessment of future national energy options. At the planning stage of future energy Policies, the results of LCA would be taken into consideration. According to data update at the construction and disposal stages, the LCA needs to be conducted iteratively.

  • PDF

The Analysis of Life Cycle Cost and Cooling Water Circulating Pump Energy Saving According to Variable Speed Pressure Differential Setpoint Control Strategy

  • Kim, Seo-Hoon;Kim, Jong-Hun;Jang, Cheol-Yong;Song, Kyoo-dong
    • KIEAE Journal
    • /
    • 제15권4호
    • /
    • pp.37-43
    • /
    • 2015
  • Purpose : The study applied control strategy to reduce through optimal control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. The study has the purpose to review validity of control on variable speed as ESMs(Energy Saving Measures) and establish the control technology on variable speed pump. The study performed reduction analysis of building energy and economic evaluation of pump through energy effectiveness control strategy of HVAC system. Method: The study sought possible reduction through energy control strategy which can provide proper flow fitting to building load by applying control on variable speed pump. The study applied control strategy to reduce through pressure differential set-point control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. Result : The results showed that about 16-35% of pump energy could be saved by using these optimal control strategies. In the result of analysis on 10 years life cycle cost of analysis on payback period of initial investment pump, variable speed pump control showed 5.1 years.

LCC 분석에 의한 상온 에너지수송용 흡수식 냉동기(STA)의 경제성 평가 (Life-Cycle Cost Analysis of Solution Transportation Absorption System)

  • 오민규;이봉진;홍희기;강용태
    • 설비공학논문집
    • /
    • 제16권6호
    • /
    • pp.506-513
    • /
    • 2004
  • The objective of this paper is to evaluate the economic performance of latent and sensible energy transportation systems. LCC (Life-Cycle Cost) analysis is a practical method and a guideline for evaluating the economic performance of considered systems during the Life-Cycle Period. By comparing the LCC of alternatives, The most ideal alternative is determined which has the lowest LCC. It is concluded that the cost of STA (Solution Transportation Absorption system) can be reduced by 67% to that of sensible energy transportation for study period with 10 km transportation distance.

태양광발전, 태양열 급탕, 지열시스템의 신재생에너지설비 조합에 관한 LCC 분석 (Life Cycle Cost Analysis about Renewable Energy Facilities Combination of Photovoltaic system, Solar thermal system and Geothermal system)

  • 전상현;안장원;김원우;조승연
    • KIEAE Journal
    • /
    • 제12권1호
    • /
    • pp.105-112
    • /
    • 2012
  • When a building is planned and designed, the design should be able to minimize the cost during the whole life cycle of the building. This study has begun to analyze LCC about the alternative design which is applicable to renewable energy facility construction. It is reviewed domestic and foreign papers about the trend of LCC technology and it is determined the analytical method to analyze the LCC of renewable energy. Regarding the review of alternatives, it is chosen the three alternatives which are able to designed combing the renewable energy facilities and it is performed the LCC analysis about each alternative. Alternative 1 is Photovoltaic + Solar Thermal + Photovoltaic /Wind Power, Alternative 2 is Geothermal + Photovoltaic, and Alternative 3 is Photovoltaic + Solar Thermal. The LCC analysis is present value method, its analytical period is 40 years and it is applied 3.2% of real discount rate. As a result, it is proved that Alternative 1 and Alternative 3 are not able to collectible the early investment cost during the analytical period and Alternative 2 is analyzed that its pay-back period of early investment cost is about 31 years. As the final outcome of this study on case analysis, it is more advantageous to use the combination of Geothermal and Photovoltaic energy than to use the other combination in LCC aspect.

에너지자원의 이산화탄소 배출량과 비용의 상관관계 분석과 전과정평가 (Correlation Analysis on $CO_2$ Emission and Cost of Energy Resources and Life Cycle Assessment)

  • 김희태;김은철;안태규
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.153-153
    • /
    • 2010
  • The world is moving towards a post-carbon society and needs clean and renewable energy for sustainable development. There are many methodological approaches which are helping this shift based on analyzed data about energy resources and which focus on limited types of energy including liquid fossil, solid fossil, gaseous fossil, and biomass (e.g. IPCC Guidelines, ISO 14064-1, WRI Protocol, etc.). We should also consider environmental impact (e.g. greenhouse gas emissions, water use, etc.) and the economic cost of the renewable energy to make a better decision. Recently, researchers have addressed the environmental impact of new technologies which include photovoltaics, wind turbines, hydroelectric power, and biofuel. In this work, we analyze the environmental impact with a carbon emission factor to present a correlation between $CO_2$ emission and the cost of energy resources standardized by the energy output. In addition, we reviewed Life Cycle Assessment (LCA) as another methodology. Researchers who are studying energy systems have ignored the impacts of entire energy systems, e.g. the extraction and processing of fossil fuels. In power sector, the assessment should include extraction, processing, and transportation of fuels, building of power plants, production of electricity, and waste disposal. Therefore LCA could be more suitable tool for energy cost and environmental impact estimation.

  • PDF

Life cycle cost analysis and smart operation mode of ground source heat pump system

  • Yoon, Seok;Lee, Seung-Rae
    • Smart Structures and Systems
    • /
    • 제16권4호
    • /
    • pp.743-758
    • /
    • 2015
  • This paper presents an advanced life cycle cost (LCC) analysis of a ground source heat pump (GSHP) system and suggests a smart operation mode with a thermal performance test (TPT) and an energy pile system constructed on the site of the Incheon International Airport (IIA). First, an economic analysis of the GSHP system was conducted for the second passenger terminal of the IIA considering actual influencing factors such as government support and the residual value of the equipment. The analysis results showed that the economic efficiency of the GSHP system could be increased owing to several influential factors. Second, a multiple regression analysis was conducted using different independent variables in order to analyze the influence indices with regard to the LCC results. Every independent index, in this case the initial construction cost, lifespan of the equipment, discount rate and the amount of price inflation can affect the LCC results. Third, a GSHP system using an energy pile was installed on the site of the construction laboratory institute of the IIA. TPTs of W-shape and spiral-coil-type GHEs were conducted in continuous and intermittent operation modes, respectively, prior to system operation of the energy pile. A cooling GSHP system in the energy pile was operated in both the continuous and intermittent modes, and the LCC was calculated. Furthermore, the smart operation mode and LCC were analyzed considering the application of a thermal storage tank.

Economic Analysis of Power Transmission Lines using Interval Mathematics

  • Teegala, Srinivasa Kishore;Singal, Sunil Kumar
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권4호
    • /
    • pp.1471-1479
    • /
    • 2015
  • A major portion of the capital costs in the present day power transmission systems are due to the cost of equipment and construction process. Transmission utilities in the recent years are drawing greater attention towards performing life cycle costing studies for cost management and decision making. However, the data involved in these studies are highly uncertain and the effect of these uncertainties cannot be directly included in the study process, resulting in inaccurate solutions. Interval mathematics provides a method for including these uncertainties throughout the cost analysis and provides final solution range in the form of intervals. In this regard, it is essential and extremely important that significant research has to be carried out in understanding the principles of life cycle costing methodology and its applicability to cost analysis of transmission lines along with uncertainties involved in the cost assessment process. In this paper, economic analysis of power transmission lines using interval mathematics has been studied. Life cycle costing studies are performed using net present value analysis on a range transmission lines used in India and the results are analyzed. A cost break even analysis considering right of way costs was carried out to determine the point of economy indifference.

공공건물 건축설비 갱신 계획시 비용-효율분석 평가기준에 관한 연구 (Evaluation Standard of Cost-Effectiveness Analysis for Renew of Architectural Equipment in Public Building)

  • 정순성
    • 동력기계공학회지
    • /
    • 제17권4호
    • /
    • pp.131-138
    • /
    • 2013
  • The purpose of this study is to suggest the evaluation standard of cost-effectiveness analysis for renew of architectural equipment in public building. Evaluation items of cost-effectiveness analysis for renew of architectural equipment in public building were used life cycle cost, energy consumption(ton of oil equivalent), green house gas emissions(ton of carbon dioxide) and maximum power demand. Life cycle cost is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. The social concern with green house gas and maximum power demand of architectural equipment field has been growing for the last several years.

친환경 건축물의 LCA 평가도구 비교분석 연구 (A Study on the Analysis of LCA tools for Eco-Building)

  • 손우진;강혜진;이언구
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2009년도 추계학술발표대회 논문집
    • /
    • pp.394-399
    • /
    • 2009
  • Since some decades ago, there has been a concern for resource depletion and environmental pollution associated with building properties. In addressing such impact of the built environment, there is a recognition of the existence of alternative building materials, fuels for energy supply as well as technologies for waste handling and disposal. Nevertheless, for long time, the choice between such alternatives was dictated by factors such as differences in prices and aesthetic values. A new important dimension in discriminating between different options is the environmental dimension. This aspect is important since buildings are one of the spatially big new additions to the natural environment that consume a lot of materials and energy during their long lifetime. Thus, with the environmental dimension kept in mind, a existing cost estimation needs to be changed. A new cost assessment method, Life Cycle Cost, should calculate overall costs with dimensional factors: investment and utility costs as well as maintenance costs over the lifetime of the building. Aiming to give an overview of the present status of Building Life Cycle Assessment(LCA) tools as a basis for further research and development including economic performance, this paper describes and compares 3 different tools for Life Cycle Assessment(LCA) and economic analysis of the green buildings. This paper compared these approaches based on various aspects. These include economic analysis method, evaluation duration, data of results(index). Use of the comparison analysis is to produce a better picture and indicate profits and shortcomings for the tools as a group; thus providing important direction improvement of LCA tool as well as further research and development of this group of tools.

  • PDF

지열히트펌프와 지역냉난방 시스템의 운영사례를 중심으로 경제성 비교분석 연구 (A Study of Comparative Economic Evaluation for the System of Ground Source Heat Pump and District Heating and Cooling:Focusing on the Analysis of Operation Case)

  • 이기창;홍준희;공형진
    • 설비공학논문집
    • /
    • 제28권3호
    • /
    • pp.103-109
    • /
    • 2016
  • The purpose of this study is to perform comparative economic evaluation for the systems of ground source heat pump (GSHP) and district heating and cooling (DHC) by focusing on the analysis of operation case of GSHP. The adapted research object is a public office building located in Seoul. The capacity of ground source pump is about 3,900 kW. Ground heat exchanger is closed loop type. The analysis period for life cycle cost is 30 years. Economic evaluation is assessed from the viewpoints of the following four parts: initial cost, energy cost, maintenance and replacement cost, and environment cost. The total life cycle cost of GSHP is approximately 8,447 million won. The cost of the DHC System is approximately 3,793 million won. The cost of the DHC is approximately 46% lower than GSHP system under the condition of current rate for GSHP and DHC.