• Title/Summary/Keyword: Leveling Network Adjustment

Search Result 8, Processing Time 0.022 seconds

The Research for Practical Use of GPS/Leveling (GPS/Leveling의 실용적 활용 방안에 관한 연구)

  • Park, Byung-Uk;Choi, Yun-Soo;Shin, Sang-Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.2 s.20
    • /
    • pp.107-114
    • /
    • 2002
  • This study aimed to estimate accuracy of GPS/Leveling and to present availability of GPS/Leveling in public surveying. For this purpose, we carried out GPS survey for bench marks and control points of Hongsung area. Orthometric heights calculated by two GPS/Leveling methods were compared to reference height. The one is calculated by base of geoid models such as EGM96, OSU91A, KGEOID99, and the other is calculated by network adjustment using fixed point. The results of GPS/Leveling by geoid models show that RMSE of EGM96 is ${\pm}0.061m,\;OSU91A\;{\pm}0.725m,\;KGEOID99\;{\pm}0.598m$. The results of GPS/Leveling by network adjustment show that the best RMSE is ${\pm}0.043m$ in case of using three fixed bench mark, and this method can be used for leveling effectively. GPS/Leveling would be able to apply in forth order public leveling and height determination of public control points.

  • PDF

Accuracy Analysis of GNSS-derived Orthometric Heights on the Leveling Loop Disconnected Area

  • Jung, Sung Chae;Kwon, Jay Hyoun;Lee, Jisun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • To compensate for the shortcomings of spirit leveling, research on the determination of GNSS (Global Navigation Satellite System)-derived orthometric height has been actively carried out. However, most analyses were primarily performed inland. In this study, the influences of the arrangement of control points, observation duration, and geoid model on the accuracy of the GNSS-derived orthometric height have been analyzed to suggest the proper method to apply the determination of GNSS-derived orthometric height to the leveling loop disconnected area. As a result, it was found that two known points located near the unknown points need to be fixed in the leveling loop disconnected area. Further, 3 cm level of accuracy can be achieved if the GNSS survey is performed over two days, for four hours per day. In terms of the geoid model, the latest national geoid model should be applied rather than the EGM08 (Earth Gravitational Model 2008) to minimize regional bias and increase accuracy. Future research is necessary to apply the determination of the GNSS-derived orthometric height technique as a method to connect with the islands because the vertical reference system used inland and that used for the islands in Korea are still different.

Calculation of Geometric Geoidal Height by GPS Surveying on 1st and 2nd order Benchmark Line (1, 2등 수준노선에서 GPS 측량에 의한 기하학적 지오이드고의 계산)

  • Lee, Suk-Bae;Kim, Jin-Soo;Kim, Cheol-Young;Kwon, Jay-Hyoun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.2
    • /
    • pp.213-223
    • /
    • 2009
  • In geoid modelling field, it is very important the GPS/leveling data because it could be check-out the accuracy of gravimetric geoid and computed the hybrid geoid. In this study, GPS surveying was accomplished in the test area including mountainous area to improve the GPS/leveling data density in Korea. And the geometric geoidal heights was calculated using the GPS/leveling data in the test area and the accuracy of the geoidal heights was analyzed. For this study, GPS surveying was accomplished on the 211 1st and 2nd order benchmarks in Gyeongbuk province and 198 GPS/leveling data were achieved after both baseline analysis and network adjustment. Geometric geoidal heights were calculated using these 198 GPS/leveling data and the accuracy analysis was done by comparison with the geoidal heights from EGM2008 geopotential model. The results showed that the bias and standard deviation computed from 190 GPS/leveling data after gross removal was -0.185$\pm$0.079m. And also, the accuracy analyses according to the benchmark order, baseline length, and altitude were accomplished.

Evaluation of GPS and Totalstation Surveying for University Facilities Mapping (GPS 및 토탈스테이션을 이용한 대학시설물 현황측량의 성과분석)

  • 박병욱;이대근;서상일
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.43-48
    • /
    • 2003
  • This study presents the detailed methods for university facilities mapping using GPS and totalstation. In the control survey by GPS network adjustment, the level of significance for the height value of fourth order triangulation stations was estimated about loom. The accuracy analysis of height determination by totalstation for the traverse points showed that the RMSE came out 9mm to the basis of direct leveling, so it indicated that trigonometric leveling by totalstation was correct comparatively. For GPS/RTK method, the result of accuracy analysis about traverse points showed that the RMSE came out 33㎜ in horizontal location to the basis of totalstation's outcome and 15㎜ in height value to the basis of direct leveling. In the construction survey, GPS/RTK surveying is quicker and more economical than totalstation surveying in the feasible areas of GPS surveying, but there were many impossible areas lot GPS/RTK surveying by the obstacles like a building.

  • PDF

Adjustment of 1st order Level Network of Korea in 2006 (2006년 우리나라 1등 수준망 조정)

  • Lee, Chang-Kyung;Suh, Young-Cheol;Jeon, Bu-Nam;Song, Chang-Hyun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.1
    • /
    • pp.17-26
    • /
    • 2008
  • The 1st order level network of Korea was adjusted simultaneously in 1987. After that, the 1 st order level network of Korea was adjusted simultaneously by National Geographic Information Institute in 2006. The levelling data were acquired by digital level with invar staff from 2001 through 2006. The 1st order level network consists of 36 level lines. Among them, 34 level lines comprise 11 level loops. Among 36 level lines, 4 level lines have fore & back error larger than the regulations for the 1st order levelling of NGII, Korea. Also, the closing error of 3 loops of level network exceed the regulation for the 1st order levelling of NGII. The standard error of fore and back leveling between bench marks(${\eta}_1$) are distributed between 0.2 $mm/{\surd}km$ and 1.7 $mm/{\surd}km$. The standard error of loop closing(${\eta}_2$) is 2.0 $mm/{\surd}km$. This result means that the 1st order level network of Korea qualifies for the high precision leveling defined by International Geodetic Association in 1948. As the result of the 1st order level network adjustment, the reference standard error($\hat{{\sigma}_0}$) of the level network was 1.8 $mm/{\surd}km$, which is twice as good as that of the 1st adjustment of level networks in 1987.

Efficiency Enhancement Plan of the Ambiguity Leveling System for Multiple Clusters (미지정수 수준 조정을 고려한 다중클러스터 시스템 효율화 방안)

  • Yu, Sunkyoung;Song, Junesol;Kee, Changdon
    • Journal of Advanced Navigation Technology
    • /
    • v.21 no.6
    • /
    • pp.572-578
    • /
    • 2017
  • As the demand of high accuracy positioning for dynamic users increases, Network RTK is actively researched for dynamic users. Network RTK is a system which provides precise positioning in the range of about 50 to 70km radius using carrier phase measurements from several reference stations. By configuring multiple clusters, which provide Network RTK corrections independently, as a single system, it could provide precise positioning for a wider area. In this paper, we have studied how to efficiently operate multiple clusters in the Korean Peninsula. We analyzed the computational load according to the configuration of a multi-cluster system and proposed a method of selecting the main reference station and system infrastructure configuration for efficient operation. In order to analyze the effects of each proposed method, 71 clusters were constructed using the reference stations of the National Geographic Information Institute and simulations were conducted. As a result of the simulation, system computation amount was reduced by 66 % and system configuration cost was reduced by 90 %.

Evaluation of GPS and Totalstation Surveying for Facilities Mapping (시설물 현황도 작성을 위한 GPS와 토털스테이션 측량의 적용 및 성과분석)

  • 박병욱;이대근;양경주
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.4
    • /
    • pp.373-381
    • /
    • 2003
  • This study presents the detailed methods for facilities mapping using GPS and Totalstation. From the control survey by GPS network adjustment, the level of significance fur the height value of fourth order triangulation stations used in this study was estimated about 10cm. According to the result of verification for the transformation coefficients of national coordinate, which were announced by the National Geographic Information Institute, RMSE f coordinate transformation was found out as $\pm$0.546m that can be applied to a map scale less than 1/10,000. The accuracy analysis of height determination by Totalstation for the traverse points spaced average 90m showed that RMSE came out $\pm$9mm on the basis of direct leveling, so it indicated that trigonometric leveling by Totalstation was correct comparatively. The result of accuracy analysis of GPS/RTK surveying on traverse points showed that RMSE came out $\pm$33mm in horizontal location on the basis of Totalstation's outcome and $\pm$15mm in height value on the basis of direct leveling. In the construction survey, GPS/RTK surveying is quicker and more economical than Totalstation surveying in the feasible areas of GPS surveying. but there were many impossible areas for GPS/RTK surveying by the obstacles like a building.

A Study on Geoid Model Development Method in Philipphines (필리핀 지오이드모델의 개발방안 연구)

  • Lee, Suk-Bae;Pena, Bonifasio Dela
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.6
    • /
    • pp.699-710
    • /
    • 2009
  • If a country has her geoid model, it could be determine accurate orthometric height because the geoid model could provide continuous equi-gravity potential surface. And it is possible to improve the coordinates accuracy of national control points through geodetic network adjustment considering geoidal heights. This study aims to find the best way to develop geoid model in Philippines which have similar topographic conditions as like Malaysia and Indonesia in Eastsouth asia. So, in this study, it is surveyed the general theories of geoid determination and development cases of geoid model in Asia and it is computed that the geoidal heights and gravity anomalies by spherical harmonic analysis using EGM2008, the latest earth geopotential model. The results show that first, the development of gravimetric geoid model based on airborne gravimetry is needed and second, about 200 GPS surveying data at national benchmark is needed. It is concluded that it is the most reasonable way to develop the hybrid geoid model through fitting geometric geoid by GPS/leveling data to gravimetric geoid. Also, it is proposed that four band spherical Fast fourier transformation(FFT) method for evaluation of Stokes integration and remove and restore technique using EGM2008 and SRTM for calculation of gravimetric geoid model and least square collocation algorithm for calculation of hybrid geoid model.