• Title/Summary/Keyword: Lean Implementation

Search Result 44, Processing Time 0.029 seconds

EXPLORATORY STUDY OF LEAN CONSTRUCTION: ASSESSMENT OF LEAN IMPLEMENTATION

  • Joo-Hyun Park;Dae-Young Kim;Hak-Ki Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1212-1215
    • /
    • 2005
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, several construction companies in the USA are starting to implement lean construction with nebulous hopes of obtaining better results from their current projects than from past projects not employing lean construction. There are many difficulties in adopting lean concepts and systems into construction projects and implementing lean construction in real construction sites. Thus, there are demands to share information how other companies implement lean construction, to identify the benefits and barriers of lean implementation in the construction fields, and finally to improve their lean implementation. This study was the first exploratory study to assess lean construction implementation on overall projects. The case studies carried out the examination of the mutual relationships of lean planning systems, organization structure, attitudes of project participants and company strategy which played major influences on successful lean implementation

  • PDF

Transformational Leadership and its impact on Lean Implementation

  • Kim, Yong-Woo;Hochstatter, Kirk
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.1
    • /
    • pp.20-25
    • /
    • 2016
  • With the multitude of variables that may play a role in a company's Lean journey, it is becoming more understood that leadership plays a significant role in implementing lean principles on construction projects. The goal of this research is to investigate the relationship between leadership and Lean Construction implementation. The research uses a quantitative research in which a survey was conducted, followed by a statistical analysis to test the hypothesis. Through the statistical analysis of survey data, the research finds that there is positive relation between the level of transformational leadership and the effectiveness of lean implementation. When an organization is implementing organizational change like Lean, traits of leaders must not be underestimated. The study findings may contribute to the knowledge of lean construction leadership by bridging the gap between leadership and the effectiveness of lean implementation.

Lean Adoption in Third Party Logistics Industry to Achieve Efficient Logistics Activities

  • SUMANTRI, Yeni
    • Journal of Distribution Science
    • /
    • v.17 no.12
    • /
    • pp.71-79
    • /
    • 2019
  • Purpose: This study focuses on lean implementation evaluation in Third Party Logistics (TPL) industry by using the lean principles measurement from Toyota Ways which consist of 14 principles. The core goal of this study is to appraise the lean implementation level in Third Party Logistics in East Java of Indonesia in order to achieve efficient logistics, distribution and transportation activities. Research design, data and methodology: This study uses a sample of 80 respondent who are Third Party Logistics managers in East Java Province, Indonesia. Data collection uses a questionnaire and standard statistical test was performed in order to analyze questionnaire. Results: The implementation level of lean management in Third Party Logistics shows that application of principle 3 (utilizing pull systems) has a higher score than the other principles. This situation shows that management give the best performance in plan process. They prioritize customer requirement in every process designed. However, the principle 8 (using reliable technology) show the weakness performance. Conclusions: Overall, this study shows the Third Party Logistics in East Java Province of Indonesia have applied the lean principle quite well, although the scores are only slightly above the average. This condition provides a strong basis for further lean implementation, especially for improving logistics, distribution and transportation activities in Third Party Logistics Business.

Innovation of Project Management - Lean Construction (공사관리체계의 새로운 접근 - 린 건설)

  • Kim Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.113-119
    • /
    • 2003
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, several construction companies in the USA have applied the Last Planner System (LPS), a decentralized system developed by the Lean Construction Institute. Thus, there are demands to share information how other companies implement lean construction, to identify the benefits and barriers of lean implementation in the construction fields, and finally to improve their lean implementation. This study carried out case studies to assess current lean construction projects with the objective to find out how effectively and to what extent lean construction is being adapted by the construction industry. This study will only introduce the Last Planner which has four levels in the LPDS, findings based on interviews with project participants, and observations from the projects. This study will also provide empirically identified success factors associated with lean implementation on the construction site. Finally, the recommendations are offered to support the effort of adaptation of lean construction in the domestic construction industry. Even though lean construction still stood on the bridge crossing from current practice to lean practice, it is the researcher's conviction that lean construction would be successfully adapted to the construction industry in the near future and would be recognized as an effective management innovation.

  • PDF

Improvement of Human Motivation in Lean Construction Implementation (린 건설 수행에 따른 인적자원의 동기유발)

  • Kim, Dae-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.130-137
    • /
    • 2006
  • Since Lean Construction has been introduced in 1992, much research is in progress to popularize lean concepts and principles. Most research focuses on developing lean concepts and tools and strengthening the limited domain of instrumental rationality and technical efficiency. However, the basic concepts of human resource management seem to be ignored by those who advocate lean production. Thus, the lean construction research related to human resource management must be once considered for popularization and activation of lean construction at the beginning stage in the domestic construction industry. Because human resources have a major influence on lean implementation and its success, especially at the beginning stage of lean construction. This paper considers the human resource requirements for the implementation of lean construction in the USA construction industry. The results from the study will provide the foundations to adapt lean construction into the domestic construction industry. Consequently, the study found that lean construction could improve the capability of human resource and human motivation if effectively implemented in the construction sites. Since lean construction emphasizes and focuses on improvement of relationships among project participants, constant application to human resource management is crucial for successful lean implementation.

Deployment of Lean System for Effective Lean Construction Implementation (효과적인 린 건설 수행을 위한 린 시스템 운용 방안 제시)

  • Kim, Dae-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.152-159
    • /
    • 2005
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, Lean Construction Institute developed Last Planner System to achieve better workflow and effective planning management. Domestic construction companies are also getting interested in the Lean Construction. However, there are no detailed guidelines how to implement lean system. Thus, this study will provide a guideline for deployment of last planner system, a prototype lean implementation control checklist, and all project participants roles based on the case studies in USA. This study should provide a framework to apply lean construction to domestic construction sites.

Development and Implementation of Chain Metrics for Obtaining Lean Overall Equipment Effectiveness Using Availability Measures (시간가동률 척도에 의한 Lean OEE의 연계지표 개발 및 적용)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.147-158
    • /
    • 2012
  • This paper aims to develop a new chain metrics for obtaining lean Overall Equipment Effectiveness(OEE) and present implementation strategy which considers the properties for Total Productive Maintenance(TPM) to reduce machine losses, Performance Analysis and Control(PAC) to reduce labor losses, Lean Production System(LPS) to reduce floor wastes, and Theory of Constraints(TOC) to minimize the problem of Capacity Constrained Resource(CCR). The study reviews the related literatures and reformulates the structure of machine losses, labor losses and field wastes. The research also develops the integrated productivity metrics according to time, units, reliability and maintainability. It is found that the study develops the actual productivity measure in terms of efficiency, effectiveness and standard productivity. In addition to that, it outlines and develops by using the integrated LPS and TPM, lean OEE measures such as Time Based Productivity(TBP), Unit Based Productivity(UBP), and Reliability & Maintainability Based Availability(RMBA). Implication examples are proposed to make it easier and available for practioners to understand the implementation strategies about TPM OEE, lean OEE and TOC OEE. Futhermore related to other studies, the research contributes to create a new chain productivity measures to clear the interrelationship concepts of productivity, efficiency and effectiveness. Moreover the paper develops the enhanced OEE measures by integration of TPM, PAC, LPS and TOC with the perspective of schedule, throughput, reliability, maintainability and availability.

APPLICATION OF PROJECT MANAGEMENT: LEAN TECHNOLOGIES AND SAVING MANUFACTURING (ASPECTS OF MANAGEMENT AND PUBLIC ADMINISTRATION)

  • Kulinich, Tetiana;Berezina, Liudmyla;Bahan, Nadiia;Vashchenko, Iryna;Huriievska, Valentyna
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.5
    • /
    • pp.57-68
    • /
    • 2021
  • Successfully adapting to digital and customer-oriented transformation, the concept of lean manufacturing professes the philosophy of creating greater benefit while minimizing losses. These losses are operations that do not add value in the production process to ensure the efficiency, flexibility, and profitability of projects. In the context of broad automation and digitalization of all sectors of the economy, mechanisms for combining automation technologies and lean production are becoming available. Moreover, when it comes to the efficient use of financial, human, or material resources, it is clear that the use of Industry 4.0 technologies can be an effective tool for achieving the goals of lean production, as many of them pursue the same goal. In this context, this article aims to study the effectiveness of the implementation of project management concepts at the global level and identify the main factors influencing its effectiveness to ensure the achievement of lean production through LEAN technologies and Industry 4.0 technologies. To achieve this goal, several statistical indicators were selected and several statistical methods of analysis were used: pairwise correlation, regression analysis, methods of comparison, synthesis, and generalization. Statistical analysis was conducted according to a survey conducted by the Project Management Institute (PMI) in 2020. An economic-mathematical model of dependence of project effectiveness in different regions of the world on the level of implementation of project management approaches is built, which shows that the increase in project effectiveness by 85% is due to financial losses, technical training, and consumer orientation. These results allow project managers to develop appropriate strategies to improve project management approaches at all levels. It is established that LEAN technologies and technologies of Industry 4.0 have several tools that have a positive effect on minimizing losses following the concept of lean production. Besides, given that the technology of Industry 4.0 is focused on the automation of Lean Production technology, a mechanism for the introduction of lean production using these technologies and methods.

A Study on the Application of TRIZ to Lean Six Sigma (TRIZ를 접목시킨 Lean Six Sigma에 관한 연구)

  • Jo, Tae-Yeon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.11a
    • /
    • pp.453-460
    • /
    • 2012
  • To maximize the operational efficiency of production and operations systems, Six Sigma and Lean Production System have been widely used. The main focus of Six Sigma is reducing variations, whereas that of Lean Production System is eliminating losses. To take advantage of the two approaches Six Sigma and Lean Production System was integrated into Lean Six Sigma, and the integrated approach has been used in recent years. In the implementation of Lean Six Sigma, the problems under consideration have often physical or technical contradictions which are difficult to be solved by conventional methods. To solve such contradictions TRIZ is useful in many cases. In this thesis, it is considered that how TRIZ can be applied to Lean Six Sigma. An integrated road-map of Lean Six Sigma and TRIZ is suggested and some cases are reviewed.

  • PDF

Applicability and Methods of Lean Production in Railway Transportation Organization: A Case Study of Urumqi Railway Bureau in China

  • Li, Hong-Chang;Rong, Chao-He;Song, De-Xi
    • International Journal of Railway
    • /
    • v.1 no.2
    • /
    • pp.45-58
    • /
    • 2008
  • The concept of lean production originated and was applied mainly to manufacture industries Even proven successful with such companies as Toyota, lean production has to be combined railway transportation production in order to bring its function into full play. The paper analyzes for applicability of lean production in railway transportation production organization, puts forward implementation methods such as transportation resource integration, station-zone organization, dispatch command optimization, railway performance evaluation index system, etc., and makes an exemplification study of lean production of Urumqi Railway Bureau in China, which testifies the applicability and efficiency of railway lean production.

  • PDF