• Title/Summary/Keyword: Large-scale wind power

Search Result 139, Processing Time 0.03 seconds

A Study on the Protection Method with Interconnection of Wind-Power Generation System (풍력발전시스템의 계통연계 보호방식에 관한 연구)

  • 김응상;김일동
    • Journal of Energy Engineering
    • /
    • v.11 no.3
    • /
    • pp.216-223
    • /
    • 2002
  • Generation facilities of the power system are mainly classified into large-scale concentrated generation and small-scale dispersed generation, but generation planning of the Korea power system has been focusing on the large-scale generation so far. Recently, however, applications of dispersed generation sources including solar cell, fuel cell, wind power, etc. have been rapidly increasing and being strongly promoted, and such generation sources should be comprehensively considered in both planning and operating. Since it is not always possible that the dispersed generation alone meets all the load interconnected to it is especially when a fault occurs, interconnection into the existing utility is desirable and recommended. In relation to wind power generation systems interconnected at the low and extra high voltage levels, this paper performs the simulation and analysis of the system protection and suggests protection coordination plans on various faults which possibly occur.

Generator Control Method for Reactive Power Smoothing to increase Wind Power Penetration (풍력 수용 한계량 향상을 위한 발전기 무효전력 평활화 제어 기법)

  • Choi, Yun-Hyuk;Lee, Hwan-Ik;Lee, Byongjun
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.197-198
    • /
    • 2015
  • As the global to increase the wind power penetration in the power system, grid-integration standards have been proposed for the stable integration of the large-scale wind farm. Particularly, the low voltage ride through function has been emphasized, as it relates to the voltage and reactive power control of the wind turbine and the rest generators. This paper proposes the non-wind power generator control method in order to improve the wind power penetration. To prove the effectiveness of the proposed strategy, the simulation study is implemented in the Jeju power system. It can improve the wind power penetration by the effective control of the control generators.

  • PDF

Assessment of performance for Output Power Control of Wind Turbine using Energy Storage System (에너지저장장치를 이용한 풍력발전 출력 제어 성능 평가)

  • Hong, Jong-Seok;Choi, Chang-Ho;Lee, Joo-Yeon;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.254-259
    • /
    • 2014
  • In this paper, we describe construction of a wind stabilization demo-site and effects of output power control of wind turbines for suppression of ramp rate using ESS (Energy Storage System). It is difficult to control the output power of distributed generator such as wind turbine which of variation is very large. If the large capacity wind farm be interconnected into power system may cause blackout due to Power Quality. For these reasons, the international standards such as Grid-Code is limited to less than 10 [%/min] of renewable energy ramp rate. The case of Korea, government actively conducts propagating large-scale renewable energy for green growth policy, to interconnecting more renewable energy into power system is necessary for stabilization technology. For these reasons, the POSCO consortium has constructed a wind stabilization demo-site that is configured as 500 [kWh] battery energy storage systems can output up to 3 [C-Rate] and two wind turbines rated 750 [kW]. In POSCO consortium, which implements various methods stabilizing output power of wind turbine such as smoothing, section firming and ramp control, we derive the results of long-term demonstration that can be controlled to satisfy to the international standard about ramp rate [%/kW] of wind turbine output power.

INVESTIGATION ON OPTIMAL LOCATION OF SEPARATION PART FOR LARGE SCALE WIND TURBINE BLADE

  • Wooseong Jeong;Hyunbum Park
    • International Journal of Aerospace System Engineering
    • /
    • v.11 no.1
    • /
    • pp.1-3
    • /
    • 2024
  • Around the world, fossil fuel energy is being replaced with renewable energy due to environmental problems and sharp price increases. Many countries are making a change in the direction of moving toward eco-friendliness by reducing carbon emissions. Among renewable energies, the wind energy is eco-friendly because it produces electricity by wind power without carbon emissions, and it attracts attention worldwide as a great alternative to the exhausted fuel energy. To improve the efficiency of wind turbines, large and extra-large wind turbines have been developed all over the world by increasing install and diameter. These wind turbines have difficulty in transport after manufacture because of their size and height. Since the height of wind turbine blades is higher than the existing tunnel height, it is impossible to transport them. In this study, therefore, a 5 MW class large blade was separated for transport easiness as wind power generators became larger globally. Aerodynamic design and analysis was carried out for the blade. After performing structural design and analysis with the model designed, the stress concentration of the analyzed model and the various factors for consideration when separating were considered to conduct the study of selecting the optimal blade separation positions.

A high-resolution mapping of wind energy potentials for Mauritius using Computational Fluid Dynamics (CFD)

  • Dhunny, Asma Z.;Lollchund, Michel R.;Rughooputh, Soonil D.D.V.
    • Wind and Structures
    • /
    • v.20 no.4
    • /
    • pp.565-578
    • /
    • 2015
  • A wind energy assessment is an integrated analysis of the potential of wind energy resources of a particular area. In this work, the wind energy potentials for Mauritius have been assessed using a Computational Fluid Dynamics (CFD) model. The approach employed in this work aims to enhance the assessment of wind energy potentials for the siting of large-scale wind farms in the island. Validation of the model is done by comparing simulated wind speed data to experimental ones measured at specific locations over the island. The local wind velocity resulting from the CFD simulations are used to compute the weighted-sum power density including annual directional inflow variations determined by wind roses. The model is used to generate contour maps of velocity and power, for Mauritius at a resolution of 500 m.

Development of Dynamic Models for DFIG Wind Farms and HVDC in Jeju Power System Using PSS/E (PSS/E를 이용한 제주계통의 DFIG 풍력발전단지 및 HVDC 동적모델 개발)

  • Nam, Soon-Ryul;Kang, Sang-Hee;Nam, Hae-Kon;Choi, Joon-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.12
    • /
    • pp.2183-2189
    • /
    • 2011
  • Since main portion of the required electric power in Jeju Island is provided from the mainland through two HVDC lines, Jeju HVDC has a most significant impact on Jeju power system. Average wind speed of Jeju Island is the highest among several candidates in South Korea. So, Jeju Island has been a suitable site for the construction of wind farms where several wind farms are now operating and several others to be sited. Since the large-scale wind generation could have adverse impacts on the stable operation of Jeju power system, wind power is also important for the stability of Jeju power system. Therefore, accurate modeling of Jeju HVDC and wind farms is required for stability analysis of Jeju power system. In this paper, PSS/E-based dynamic modeling of Jeju HVDC and DFIG wind farms is proposed. Model-writing technique of PSS/E is used to develop USRAUX model and USRMDL model for controlling the frequency of HVDC and imposing an operation limit of wind power, respectively. Dynamic characteristics of Jeju HVDC and DFIG wind farms are analyzed through the dynamic simulations. The simulation results show the effectiveness of the developed models for Jeju power system.

Power Quality Control of Wind/Diesel Hybrid Power Systems Using Fuzzy PI Controller (퍼지 PI 제어기를 이용한 풍력/디젤 하이브리드 발전시스템의 품질제어)

  • Yang, Su-Hyung;Ko, Jung-Min;Boo, Chang-Jin;Kang, Min-Jae;Kim, Jeong-Uk;Kim, Ho-Chan
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.5
    • /
    • pp.1-10
    • /
    • 2012
  • This paper proposes a modeling and controller design approach for a wind-diesel hybrid system including dump load. Wind turbine depends on nature such as wind speed. It causes power fluctuations of wind turbine. Excessive power fluctuation at stand-alone power grid is even worse than large-scale power grid. The proposed control scheme for power quality is fuzzy PI controller. This controller has advantages of PI and fuzzy controller. The proposed model is carried out by using Matlab/Simulink simulation program. In the simulation study, the proposed controller is compared with a conventional PI controller. Simulation results show that the proposed controller is more effective against disturbances caused by wind speed and load variation than the PI controller, and thus it contributes to a better quality wind-diesel hybrid power system.

An Strategy of Increasing the Wind Power Penetration Limit with VSC-HVDC in Jeju Power System (전압형 HVDC에 의한 제주계통의 풍력한계용량 증대 방안)

  • LEE, SEUNGMIN;Chae, Sang Heon;Kim, Ho Min;Kim, Eel-Hwan
    • Proceedings of the KIPE Conference
    • /
    • 2015.07a
    • /
    • pp.461-462
    • /
    • 2015
  • The government on Jeju Special Self-governing Province has a policy named 'Carbon Free Island Jeju by 2030'. The main purpose in this policy is to install wind power system with the total capacity of 1.35 GW by 2020. When the demand load on Jeju Island power system is lower than entire output power, a lot of dump power will be produced from the large-scale wind farms. It will be able to cause the wind power limit on Jeju Island. Consequently, the additional power facility must be installed to ensure stable power system operation in Jeju Island and increase wind power limit. From this point, this paper proposes the installation of MMC-HVDC, which can supply power in real time in the desired direction. The effectiveness of MMC-HVDC based on measured data of Jeju Island power system will be verified by using PSCAD/EMTDC simulation program.

  • PDF

Modeling and Simulation of a Permanent-Magnetic Synchronous Generator Wind Turbine (영구자석 동기형 풍력발전시스템 모델링 및 시뮬레이션)

  • An, Hae-Joon;Kim, Hyun-Goo;Jang, Gil-Soo;Ro, Kyoung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.462_463
    • /
    • 2009
  • When introducing the existing distribution system, load and power are mixed for wind power generation to be operated unlike the distribution system. Accordingly, if large scale development facilities such as a wind farm is adopted in concentration, the problems need to be examined and analyzed and security measures need to be taken not to out of voltage range.

  • PDF

Study of Power System Impact Assessment Standard for Large-scale Wind Farms (풍력발전 계통연계 평가기준 연구)

  • Choy, Young-Do;Jeon, Young-Soo;Park, Young-Shin;Jeon, Dong-Hoon;Yoon, Ki-Kab;Park, Sang-Ho;Shin, Jung-Hoon;Lee, Jae-Gul
    • New & Renewable Energy
    • /
    • v.6 no.1
    • /
    • pp.12-19
    • /
    • 2010
  • In Korea, experiences in wind farm operation are limited and the foundation for setting standards in electrical system connection is still weak in comparison to the operation experience in connection of wind power to the electrical system of other countries around the world. Therefore, standards that are being applied in various countries for connection and optimal operation in wind farms need to be examined, and in addition, procedures for the assessment of the effects on the system are needed for setting connection standards and optimal operation plans in accordance with Korean electrical system characteristics. In this study, procedures for the assessment of effects of wind power connection to the electrical system are presented.