• Title/Summary/Keyword: Large tunnel

Search Result 902, Processing Time 0.027 seconds

Field Tests and Analysis of Groundwater System for Stabilization of Slope in Large Open-Pit Coal Mine (대규모 노천 석탄광산의 사면 안정화를 위한 지하수 유동 체계 분석)

  • Ryu, D.W.;Kim, H.M.;Oh, J.H.;Sunwoo, C.;Jung, Y.B.
    • Tunnel and Underground Space
    • /
    • v.19 no.3
    • /
    • pp.248-260
    • /
    • 2009
  • With regard to oversea mineral resources development, recent trend has been changed from a simple capital investment to a direct development of the resources. In relation to the stability of a slope in large open-pit coal mine, groundwater system was investigated and the validity of horizontal drainage hole was evaluated in Pasir coal mine, Indonesia. In this work, various field tests were carried out for a characterization of groundwater system, which included in-situ permeability measurement, tracer test and monitoring of groundwater levels. Especially, the influence of SM river on the characteristics of the groundwater flow system was mainly inspected. For the permeability measurement, Guelph permeameter was employed, and was found that sandstone was more permeable than mudstone and coal seam. From a comparison of lithological structure and the results of groundwater level monitoring, sandstone and thin coal seam with fractures were found to be a main channel for groundwater flow. In the results of tracer tests, the effect of SM river on the groundwater system depends on the geological structure of its base. To identify the effect of horizontal drainage holes, 2-D groundwater modeling was performed. Four different cases were tested, which are different from the length of drainage hole and the existence of pond on top of the slope. To enhance the drainage effect and slope stability, the drainage hole should be drilled to the depth of coal seam layer, which provides a main pathway of groundwater flow and embedded by sandstone. For this purpose, correct identification of surrounding geology should be preceded.

Demand Surveys for Big Research Facilities and Equipments to Advance National S&T Research Infrastructure (과학기술 하부구조 선진화를 위한 대형 연구장비의 수요 조사)

  • 권용수;민철구
    • Proceedings of the Technology Innovation Conference
    • /
    • 1997.12a
    • /
    • pp.159-176
    • /
    • 1997
  • This paper deals with demand surveys for big science and technology research facilities and equipments to advance national S'||'&'||'T research infrastructure. We perform surveys thrice based on applied Delphi method on the future demand of big S'||'&'||'T research facilities and equipments among Korean scientists and engineers. We employ the concept of big S'||'&'||'T research facilities and equipments as follows: \circled1 The operating size of it is equivalent to that of an institute or research center, and/or \circled2 The users in various disciplines are many, and/or \circled3 The application areas or spill-over effects are large, and/or \circled4 The scale and scope of research objects is equivalent to that of mega science area such as earth.oceanography.space, and/or \circled5 The expenses for installing and operating it are to be supported by government, and/or \circled5 The facilities are expected as necessary for international joint research, and/or \circled7 It is necessary for promoting creative basic science and developing creative technology. We ask the respondents to answer the following questionnaire: - How to prioritize the equipments according to the degree of importance\ulcorner $\square$ Promotion of basic science and mega science, the development of the technologies to enhance the public welfare, the competitiveness of industrial technologies, the job creation for the S'||'&'||'T personnel, and international cooperation. - Who should be in charge of acquisition and operation of the equipments\ulcorner $\square$ Industry, Government Research Institutes, Academy, ERC and SRC. - When shall we acquire the equipment\ulcorner $\square$ Within 2000, 2002, 2007, 2012, and 2017. - How shall we acquire the equipments\ulcorner $\square$ International Joint Development, Domestic Development, Acquisition from Overseas, - How much will the equipment generate spill-over effects to national competitiveness\ulcorner $\square$ Promotion of basic science, contribution to the economy, supply of S'||'&'||'T personnel, and international cooperation. We suggest the following equipments as prioritized candidates after consulting the officers from MOST, MOE, MIC, MOEN and experts from KBSI and STEPI:(table omitted) where, #1, Korea Advanced Liquid Metal Reactor, #2. 800 MHz Superconduction Fourier-Transform Nuclear Magnetic Resonance Spectrometer, #3. Ion Accelerator, #4. Seismic Test Facility, #5. Transonic Wind Tunnel, #6. Radio Telescope for Very Long Baseline Interferometer, #7. 3000t Universal(or Large Structure) Testing Machine, #8. Compost Facility or Plasma Pyrolysis Facility.

  • PDF

Influence of the Fire on Emergency Evacuation Support System (대공간용 비상피난지원 시스템에 화재가 미치는 영향 분석)

  • Kim, JiTae;Sung, Kun Hyuk;Park, Won Hee;Lee, Duck Hee;Woo, Jun You;Ro, Kyoung-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.626-631
    • /
    • 2018
  • An emergency evacuation support system is used to maintain evacuation routes by pressurizing a space inside screens. In cases of fire, it is important to understand the thermal distributions in the tunnel for preventing system failure. In this study, we numerically investigated the effect of fire on an emergency evacuation support system in a large fabric store with some fire scenarios with different combustibles. The critical temperature for system failures was assumed to be $200^{\circ}C$. As a result, the highest temperature was predicted in the ceiling part due to the effect of a ceiling jet, and the fire safety of the screen was secured at distances of 20 to 30 m according to the heat release rate. To prevent the inflow of smoke into the system, it is necessary to maintain more than 5 Pa if positive pressure inside the smoke screen. The results of this study could be useful for designing an emergency evacuation support system.

Study on Cavitation Noise Predictions for an Elliptic Wing (타원형 날개에 대한 공동소음 예측 연구)

  • Jeong, Seung-Jin;Hong, Suk-Yoon;Song, Jee-Hun;Kwon, Hyun-Wung;Park, Il-Ryong;Seol, Han-Shin;Kim, Min-Jae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.6
    • /
    • pp.757-764
    • /
    • 2019
  • Depressurization occurs around underwater objects moving at high speeds. This causes cavitation nuclei to expand, resulting in cavitation. Cavitation is accompanied by an increase in noise and vibration at the site, particularly in the case of thrusters, and this has a detrimental ef ect on propulsion performance. Therefore, predicting cavitation is necessary. In this study, an analytical method for cavitation noise is developed and applied to an elliptic wing. First, computational fluid dynamics are performed to obtain information about the flow fields around the wing. Then, through the cavitation nuclei density function, number of cavitation nuclei is calculated using the initial radius of the nuclei and nuclei are randomly placed in the upstream with large pressure drop around the wing tip. Bubble dynamics are then applied to each nucleus using a Lagrangian approach for noise analysis and to determine cavitation behavior. Cavitation noise is identified as having the characteristics of broadband noise. Verification of analytical method is performed by comparing experimental results derived from the large cavitation tunnel at the Korea Research Institute of Ships & Ocean Engineering.

Study of Blast Ground Vibration & Noise Measurements In-situ and Effect Analysis for Numerical Analysis, Rational Blasting Design at an Eel Farm (양만장의 발파 진동소음 현장측정과 수치해석을 통한 영향검토 및 합리적인 발파설계 연구)

  • Lee Song;Kim Sung-Ku;Rhee Yong-Ho
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.179-188
    • /
    • 2006
  • The vibration or/and noise generated by blast operations might cause not only structural damage to properties but mentally also to humans and animals. For that reason, maximum permitted vibration and noise levels are set by sensitivities of structures and they are used for the management of blast vibration. It is known that the fish lived in water are more sensitive to vibration than land animals, and thus the adverse impact of the blasting on fish farms should be very concerned. This study investigated the vibration and noise levels at a large eel farm located some 840 meters of the blasting site through the large real-scale experiments of blastings, prior to conducting the actual blasting. As a result, it was found that the noise met the requirement to be within maximum permitted level, while the ground vibration exceeded the permitted vibration. Accordingly, the impact of the excess vibration was investigated by an existing empirical method and verified by a new three dimensional numerical analysis. In this study, such an inspection process was briefly described, and a method was suggested for the examination of possible adverse effects from blasting on vibration-sensitive structures like the eel farm. The study also introduced a design method that controls the blast effects - ground vibration and noise.

A Study on the Optimal Installation of Ducted Fan Ventilation System in Long Mine Airways - Focused on the Wall Separation Distance and the Gap Length between Ducts (장대 광산갱도내 풍관 접속 통기선풍기 최적 설치 방안연구 - 벽면과 풍관간의 이격거리 중심으로)

  • Lee, Chang Woo;Nguyen, Van Duc
    • Tunnel and Underground Space
    • /
    • v.27 no.1
    • /
    • pp.12-25
    • /
    • 2017
  • In local underground mines heavily depending on the natural ventilation, ducted fan auxiliary ventilation system is strongly recommended instead of the total mine ventilation system requiring large capital and operating costs. Optimizing the installation of ducted fans in series in long large-opening mines is required to assure the economy and efficiency of the ventilation system. The two most critical design parameters for optimization are the wall separation distance and gap length between adjoining ducts. This study aims at deriving the optimal values for those two parameters concerning the economic and environmental aspects through the extensive CFD analysis, which minimizes pressure loss, leakage and entrainment of the contaminated air in the gap space. The ranges of the wall separation distance and gap length for study are selected by taking into consideration the existing recommendations and guidelines. The ultimate goal is to optimize the auxiliary ventilation system using ducted fans in series to provide a reliable and efficient solution to maintain clean and safe workplace environment in local long underground mines.

Enhanced Oil Recovery (EOR) Technology Coupled with Underground Carbon Dioxide Sequestration (CO2 지하저장과 연계한 원유회수증진 기술)

  • Kim, Hyung-Mok;Bae, Wi-Sup
    • Tunnel and Underground Space
    • /
    • v.23 no.1
    • /
    • pp.1-12
    • /
    • 2013
  • Enhanced oil recovery (EOR) technology coupled with underground carbon dioxide sequestration is introduced. $CO_2$ can be injected into an oil reservoir in order to enhance oil production rate and $CO_2$ EOR can be turned into CCS in a long term sense. Coupling $CO_2$ EOR with CCS may secure a large scale and consistent $CO_2$ source for EOR, and the $CO_2$ EOR can bring an additional economic benefit for CCS, since the benefit from enhanced oil production by $CO_2$ EOR will compensate costs for CCS implementation. In this paper, we introduced the characteristics of $CO_2$ EOR technology and its market prospect, and reviewed the Weyburn $CO_2$ EOR project which is the first large-scale $CO_2$ EOR case utilizing an anthropogenic $CO_2$ source. We also introduced geotechnical elements for a successful and economical implementation of $CO_2$ EOR with CCS and they were a miscroseismic monitoring during and after injection of $CO_2$, and determination of minimum miscible pressure (MMP) and maximum injection pressure (MIP) of $CO_2$.

Experimental and CFD Study on the Exhaust Efficiency of a Smoke Control Fan in Blind Entry Development Sites (맹갱도 굴진 작업공간내 방재팬의 화재연 배기효율에 관한 현장실험 및 CFD 연구)

  • Nguyen, Vanduc;Kim, Dooyoung;Hur, Wonho;Lee, Changwoo
    • Tunnel and Underground Space
    • /
    • v.28 no.1
    • /
    • pp.38-58
    • /
    • 2018
  • The ventilation system plays a crucial role in underground mine safety. The main objective of the ventilation system is to supply sufficient air to dilute the contaminated air at working places and consequently provide tenable environment during the normal operation, while it also should be capable of controlling the fire propagation and facilitate rescue conditions in case of fire in mines. In this study, a smoke control fan was developed for the auxiliary ventilation as well as the fire smoke exhaust. It works as a free-standing auxiliary fan without tubing to dilute or exhaust the contaminated air from the working places. At the same time, it can be employed to extract the fire smoke. This paper aims to examine the smoke control efficiency of the fan when combined with the current ventilation system in mines. A series of the site experiments and numerical simulations were made to evaluate the fan performance in blind entry development sites. The tracer gas method with SF6 was applied to investigate the contaminant behavior at the study sites. The results of the site study at a large-opening limestone mine were compared with the CFD analysis results with respect to the airflow pattern and the gas concentration. This study shows that in blind development entry, the most polluted and risky place, the smoke fan can exhaust toxic gases or fire smoke effectively if it is properly combined with an additional common auxiliary fan. The venturi effect for smoke exhaust from the blind entry was also observed by the numerical analysis. The overall smoke control efficiency was found to be dependent on the fan location and operating method.

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF

Experimental Study on the Elastic Constants of A Transversely Isotropic Rock by Multi-Specimen Compression Tests Report 1 - Focus on Data Analysis (다중시험편 시험에 의한 평면이방성 암석의 탄성상수 분석연구 제 1 보 - 자료해석을 중심으로)

  • Park, Chul-Whan;Park, Chan;Synn, Joong-Ho;Jung, Yong-Bok
    • Tunnel and Underground Space
    • /
    • v.20 no.6
    • /
    • pp.455-464
    • /
    • 2010
  • The variations of the uniaxial compressive strength, the strains and the elastic constants with respect to the angle of anisotropy are analyzed in order to investigate the characteristics of a transversely isotropic rock experimentally. Total 35 specimens of 7 different angles from a large block of rhyolite presenting the flow structure obviously are used in tests. This study is composed of two reports; the elastic constants are mainly analyzed for the every individual angle in the report No. 1 and they will be discussed synthetically in the report No. 2. From the specimens of 0 and 90 degree, 4 independent elastic constants which can directly be obtained without the help of any other suggested equations, may be referred to the true values. Data variation in the strain measurements differs on the angle is analyzed. That of small angle specimens tends higher than that of large angle specimens. The relation of apparent Young’s modulus and angle is found to be M- or U-shaped. For small angle specimens, Saint-Venant approximation cannot be applied successfully on account of showing the non-monotonous increase, and E1 is analyzed out of the true value range. In the specimen of $\phi$ = 75, the deviation of strain measurement and strength are smallest and 4 all constants are analyzed in the true value range. Therefore, specimen of the angle of around 75 may become preferable if only one specimen should be used in test of a transversely isotropic rock.