• Title/Summary/Keyword: Large national estate

Search Result 27, Processing Time 0.02 seconds

3D Printing in Modular Construction: Opportunities and Challenges

  • Li, Mingkai;Li, Dezhi;Zhang, Jiansong;Cheng, Jack C.P.;Gan, Vincent J.L.
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.75-84
    • /
    • 2020
  • Modular construction is a construction method whereby prefabricated volumetric units are produced in a factory and are installed on site to form a building block. The construction productivity can be substantially improved by the manufacturing and assembly of standardized modular units. 3D printing is a computer-controlled fabrication method first adopted in the manufacturing industry and was utilized for the automated construction of small-scale houses in recent years. Implementing 3D printing in the fabrication of modular units brings huge benefits to modular construction, including increased customization, lower material waste, and reduced labor work. Such implementation also benefits the large-scale and wider adoption of 3D printing in engineering practice. However, a critical issue for 3D printed modules is the loading capacity, particularly in response to horizontal forces like wind load, which requires a deeper understanding of the building structure behavior and the design of load-bearing modules. Therefore, this paper presents the state-of-the-art literature concerning recent achievement in 3D printing for buildings, followed by discussion on the opportunities and challenges for examining 3D printing in modular construction. Promising 3D printing techniques are critically reviewed and discussed with regard to their advantages and limitations in construction. The appropriate structural form needs to be determined at the design stage, taking into consideration the overall building structural behavior, site environmental conditions (e.g., wind), and load-carrying capacity of the 3D printed modules. Detailed finite element modelling of the entire modular buildings needs to be conducted to verify the structural performance, considering the code-stipulated lateral drift, strength criteria, and other design requirements. Moreover, integration of building information modelling (BIM) method is beneficial for generating the material and geometric details of the 3D printed modules, which can then be utilized for the fabrication.

  • PDF

Analyzing Factors Affecting the Use of Landowner's Purchase Requisition Policy in Bukhansan National Park (북한산국립공원 내 토지매수 청구 제도 활용 요인 분석)

  • Chan Yong Sung;Young Jae Yi
    • Korean Journal of Environment and Ecology
    • /
    • v.37 no.6
    • /
    • pp.499-507
    • /
    • 2023
  • This study conducted an empirical analysis on a land purchase requisition policy in Bukhansan National Park to draw the efficacy, limitations and implications of this policy. A logistic regression analysis was conducted to identify factors that affected the landowners' decision on applying for land purchase requisition using the government's records on acquisition of private lands in the park since 2006 when this policy began to be implemented. Results illustrate that the probability that a landowner applied for purchase requisition increased if the land was classified as forest, if a large proportion of the land was designated as the nature conservation district, if it was located farther from park boundary, and if it had higher appraised value per square meter. These results indicate that as the landowners had less chance to utilize their lands, they more likely apply for purchase requisition. These results also imply that the government can achieve a high conservation performance level if private lands are acquire by the land acquisition requisition policy. The logistic regression model also predict that 401m2 of the private lands in Bukhansan National Park will likely be purchase-requested in future. Despites its usefulness in mitigating landowners' complaints in national parks, the land purchase requisition policy has not been widely utilized. Based on these empirical results, this study provides policy implications to facilitate the ulitization of this policy.

A Study on Land Surface Temperature Changes in Redevelopment Area Using Landsat Satellite Images : Focusing on Godeok-dong and Dunchon-dong in Gangdong-gu, Seoul (Landsat 위성영상을 활용한 재건축 지역의 지표 온도 변화에 관한 연구 : 서울특별시 강동구의 고덕동과 둔촌동을 중심으로)

  • Jihoon HAN;Chul SON
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.26 no.2
    • /
    • pp.42-54
    • /
    • 2023
  • The population is concentrated in the metropolitan areas in Korea, and low-density residential areas are transforming into high density residential areas through redevelopment to meet this demand. However, large-scale redevelopment in a short period of time has a negative impact on the urban climate, such as generating a heat island effect due to the reduction of urban green areas. In this study, the change in surface temperature from 2013 to 2022 in the redevelpment areas of Godeok-dong and Dunchon-dong, Gangdong-gu, Seoul, was analyzed using Landsat 8 satellite images. In the Godeok-dong area, the difference in surface temperature was analyzed for the target redevelopment area, forest area, mixed forest and urban area, and low density residential area. In the Dunchon-dong area, the difference in surface temperature was analyzed for the target redevelopment area, forest area, and low density residential area. The difference in surface temperature was analyzed through multiple regression analysis conducted yearly over the three different stages in redevelopment period. The results from the multiple regression analysis show that in both areas, the land surface temperature of target redevelopment area was higher than that of the forest area and lower than low density residential area. It can be seen that these results occurred because the low-density residential area in Godeok-dong and Dunchon-dong had a lower green area ratio and a higher building-to-land ratio than the target redevelopment area. The results of this study suggest that even if low-density residential areas are transforming into high-density areas, adjusting the management of green areas and building-to-land ratio can contribute to lessen urban heat island effect.

Analysis on Priority of Influence Factors for Management of Vertical-extension Remodeling Project (수직증축 리모델링공사의 효율적 관리를 위한 영향요인 분석)

  • Lee, Dong-Heon;Lim, Hyoung-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.314-321
    • /
    • 2016
  • After the 1980s, as the economy was growing rapidly and the real estate market was active, a large increase in population was supplied to the city. Accordingly, the national apartment housing market is located in the form of Urban Housing Culture. On the other hand, with time, the supply apartment houses became superannuated and the residential environment became poor. Therefore, the environment of old apartment houses has been changed to improve by reconstruction. Despite this, reconstruction incurred not only a lot of construction waste, but also problems of environmental degradation, noise, traffic congestion, increasing number of households, and so on. Recently, the housing law has changed, and vertical extension remodeling focused on Small/Medium Town House is underway. This has been changed in response to the demand. This is one of essential parts in the remodeling field for the future, even though it has some problems in how uses existing buildings. Therefore, this study analyzed occurrence risk factor for each type through research materials and case analysis regarding the vertical extension remodeling of apartment housing. In addition, the relative importance was determined through questionnaires and interviews from constructors, designers, and experts in the field.

Predicting Carbon Dioxide Emissions of Incoming Traffic Flow at Signalized Intersections by Using Image Detector Data (영상검지자료를 활용한 신호교차로 접근차량의 탄소배출량 추정)

  • Taekyung Han;Joonho Ko;Daejin Kim;Jonghan Park
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.115-131
    • /
    • 2022
  • Carbon dioxide (CO2) emissions from the transportation sector in South Korea accounts for 16.5% of all CO2 emissions, and road transportation accounts for 96.5% of this sector's emissions in South Korea. Hence, constant research is being carried out on methods to reduce CO2 emissions from this sector. With the emerging use of smart crossings, attempts to monitor individual vehicles are increasing. Moreover, the potential commercial deployment of autonomous vehicles increases the possibility of obtaining individual vehicle data. As such, CO2 emission research was conducted at five signalized intersections in the Gangnam District, Seoul, using data such as vehicle type, speed, acceleration, etc., obtained from image detectors located at each intersection. The collected data were then applied to the MOtor Vehicle Emission Simulator (MOVES)-Matrix model-which was developed to obtain second-by-second vehicle activity data and analyze daily CO2 emissions from the studied intersections. After analyzing two large and three small intersections, the results indicated that 3.1 metric tons of CO2 were emitted per day at each intersection. This study reveals a new possibility of analyzing CO2 emissions using actual individual vehicle data using an improved analysis model. This study also emphasizes the importance of more accurate CO2 emission analyses.

The Actual Conditions and Improvement of the Eco-Forests Mater Plan, South Korea (우리나라 생태숲조성 기본계획 실태 및 개선방향)

  • Heo, Jae-Yong;Kim, Do-Gyun;Jeong, Jeong-Chae;Lee, Jeong
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.235-248
    • /
    • 2010
  • This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.

A Study on the Present Condition and Improvement of Cultural Heritage Management in Seoul - Based on the Results of Regular Surveys (2016~2018) - (서울특별시 지정문화재 관리 현황 진단 및 개선방안 연구 - 정기조사(2016~2018) 결과를 중심으로 -)

  • Cho, Hong-seok;Suh, Hyun-jung;Kim, Ye-rin;Kim, Dong-cheon
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.2
    • /
    • pp.80-105
    • /
    • 2019
  • With the increasing complexity and irregularity of disaster types, the need for cultural asset preservation and management from a proactive perspective has increased as a number of cultural properties have been destroyed and damaged by various natural and humanistic factors. In consideration of these circumstances, the Cultural Heritage Administration enacted an Act in December 2005 to enforce the regular commission of surveys for the systematic preservation and management of cultural assets, and through a recent revision of this Act, the investigation cycle has been reduced from five to three years, and the object of regular inspections has been expanded to cover registered cultural properties. According to the ordinance, a periodic survey of city- or province-designated heritage is to be carried out mainly by metropolitan and provincial governments. The Seoul Metropolitan Government prepared a legal basis for commissioning regular surveys under the Seoul Special City Cultural Properties Protection Ordinance 2008 and, in recognition of the importance of preventive management due to the large number of cultural assets located in the city center and the high demand for visits, conducted regular surveys of the entire city-designated cultural assets from 2016 to 2018. Upon the first survey being completed, it was considered necessary to review the policy effectiveness of the system and to conduct a comprehensive review of the results of the regular surveys that had been carried out to enhance the management of cultural assets. Therefore, the present study examined the comprehensive management status of the cultural assets designated by the Seoul Metropolitan Government for three years (2016-2018), assessing the performance and identifying limitations. Additionally, ways to improve it were sought, and a DB establishment plan for the establishment of an integrated management system under the auspices of the Seoul Metropolitan Government was proposed. Specifically, survey forms were administered under the Guidelines for the Operation of Periodic Surveys of National Designated Cultural Assets; however, the types of survey forms were reclassified and further subdivided in consideration of the characteristics of the designated cultural assets, and manuals were developed for consistent and specific information technologies in respect of the scope and manner of the survey. Based on this analysis, it was confirmed that 401 cases (77.0%) out of 521 cases were generally well preserved; however, 102 cases (19.6%) were found to require special measures such as attention, precision diagnosis, and repair. Meanwhile, there were 18 cases (3.4%) of unsurveyed cultural assets. These were inaccessible to the investigation at this time due to reasons such as unknown location or closure to the public. Regarding the specific types of cultural assets, among a total of 171 cultural real estate properties, 63 cases (36.8%) of structural damage were caused by the failure and elimination of members, and 73 cases (42.7%) of surface area damage were the result of biological damage. Almost all plants and geological earth and scenic spots were well preserved. In the case of movable cultural assets, 25 cases (7.1%) among 350 cases were found to have changed location, and structural damage and surface area damage was found according to specific material properties, excluding ceramics. In particular, papers, textiles, and leather goods, with material properties that are vulnerable to damage, were found to have greater damage than those of other materials because they were owned and managed by individuals and temples. Thus, it has been confirmed that more proactive management is needed. Accordingly, an action plan for the comprehensive preservation and management status check shall be developed according to management status and urgency, and the project promotion plan and the focus management target should be selected and managed first. In particular, concerning movable cultural assets, there have been some cases in which new locations have gone unreported after changes in ownership (management); therefore, a new system is required to strengthen the obligation to report changes in ownership (management) or location. Based on the current status diagnosis and improvement measures, it is expected that the foundation of a proactive and efficient cultural asset management system can be realized through the establishment of an effective mid- to long-term database of the integrated management system pursued by the Seoul Metropolitan Government.