• Title/Summary/Keyword: Landscaping Construction

Search Result 105, Processing Time 0.025 seconds

Suitability Site Selection by Meteorological Factors for the Protected Horticulture Complex in Saemanguem (기상환경 분석을 통한 새만금 시설원예단지 적지분석 연구)

  • Kang, Dong Hyeon;Lee, Si Young;Kim, Jong Koo;Choi, Hong Ki;Park, Min Jung;Yun, Sung-Wook;Son, Jin Kwan
    • Journal of Bio-Environment Control
    • /
    • v.25 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • This study was conducted to find the suitability site for the construction of Saemangeum horticulture complex taking into account cost-effective environmental management by analyzing and comparing meteorological conditions. By overlapping the thematic maps, we extracted the regions that scored 50-59 points as suitable sites for the development project. Of these pre-selected sites, we selected the final candidate region for the protected horticulture by overlapping the sites selected for agricultural and living environment construction. The results of this study will contribute to generating added values by minimizing the environmental management costs for horticulture and landscaping. The operation of a large-scale protected horticulture and landscaping in the Saemangeum Complex will enhance the agricultural competitiveness of our country in the global market.

The Prospects of Highway Road in Consideration of Natural Environment (친환경 고속도로의 건설 방향)

  • Jeon, Gi-Seong;Kim, Tae-Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.3
    • /
    • pp.105-112
    • /
    • 2000
  • For the purpose of building up the construction prospects of highway in consideration of natural environment. The tree planting and flower seeding in highway road side using native species were offered to natural landscape and resting area landscaping for peoples, and these area were 194place. The tree planting and flower seeding activity is to improve driving circumstances, and to conserve living and natural environment along the highways. And, preparation of ecotone and biotope at the highway surroundings for natural ecosystem conservation is an important activity, and planting of natural plants is generally carried out near wildlife ecoroads in order to give the way for animals. The primary purpose of this tree planting and seeding is not only to reduce environmental pollution, but also to enhance the ecological surroundings of highway circumference. Ultimately, It is essential that the constructive method of highway think over such as ecological environment and road design, surveying and management, construction, highway maintenance etc.

  • PDF

Strength Properties of Cementless Permeable Block Based on Blast-Furnace Slag with Alkali Stimulant Additional Ratio (알칼리 자극제 첨가율에 따른 고로슬래그 기반 무시멘트 투수블록의 강도 특성)

  • Ji, Bong-Su;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.168-169
    • /
    • 2019
  • Recently, the flooding of rivers caused by rainy season and heavy rains in Korea causes economic and environmental problems such as flood damage and urban flooding. Therefore, in order to solve these problems, local governments use landscaping methods and drainage facilities to prevent them, but they are not perfect solutions. Domestic awareness also lacks awareness to worry about flooding only during rainy seasons and heavy rains, and to worry about or prevent flooding in the region. In order to solve this problem, we recognize the importance of permeable blocks nationwide and replace or install permeable paving materials on most sidewalks. However, since existing permeable blocks used cement as the main material, calcium carbonate is produced when reacted with water. Efflorescence occurs, and the resulting calcium carbonate blocks the pores of the permeation block, causing a decrease in permeability.

  • PDF

Analysis of the Characteristic for CO2 Emission Intensity of the Plane Types in Apartments (공동주택 평면유형조합에 따른 시공단계 CO2 배출원단위 특징 분석)

  • Choi, Doo-Sung;Chun, Hung-Chan;Cho, Kyun-Hyong
    • Journal of Korean Living Environment System
    • /
    • v.18 no.3
    • /
    • pp.330-337
    • /
    • 2011
  • This research quantified(/m2) the supplied materials at the construction stage of apartments, the main architecture form domestically, and presented the average CO2 emission by analyzing 50 apartment complexes. The results are as follows. CO2 emission of each type of constructions by supplied materials is architecture (78.8%), machine (8.8%), electricity (5.3%), civil engineering (3.4%), landscaping (3.4%), and communication (1.0%). The building construction charged about 79%. Average CO2 emission of total 50 apartment complexes according to supplied material expense appeared to be 950 kg-CO2/m2, and when core-type pillar was included CO2 emission largely increased.

Selection of Tree History Management System Items for Analyzing the Causes of Landscape Tree Defects in an Apartment Complex

  • Park, Sang Wook
    • Journal of People, Plants, and Environment
    • /
    • v.23 no.3
    • /
    • pp.347-362
    • /
    • 2020
  • Background and objective: It is difficult to conclusively determine the exact cause of tree defects since multiple causes are involved such as climate change, plantation, tree quality and planting time, construction, planting base, drainage, sunshine conditions, maintenance, and microclimate. The data related to landscaping construction defects are scattered or fragmented by companies and years, but not managed systematically by the defect information management system. Most of the earlier studies associated with tree defects in apartment complexes suggested defect rates after examining tree defects in the completed construction site and proposed fragmentary and subjective conclusions about the causes of defects observed in trees with high defect rates. It is proposed to continue to conduct studies on the establishment and analysis of systematic databases to identify the exact causes of tree defects and measures to improve, and the need to accumulate systematic data in the construction process where many defects arises. This study was conducted to reduce the defects of trees planted in apartment complexes. Methods: Main factors related to tree defects were subdivided based on the results of literature review and a defect investigation at the completion site, and tree history management items were selected and subdivided during the construction stage. Results: The criteria for the preparation of subdivided items were obtained, and the tree history management checklist was written for the site under actual construction and a systematic database was established. Items that are categorized based to the causes of defects include the location of nurseries, date, tree quality, site conditions, planting techniques, microclimates, and maintenance. Conclusion: This study suggested tree history management items based on the tree defects that can be identified at the construction stage and applied them to the selected study site, which differentiates this study from earlier studies. It will be necessary to conduct a comprehensive and objective time series analysis on tree defects that occur over time by continuously monitoring and collecting data after construction.

The Application Technology of Korean-style R&D in Verification for deploying the Neo-Korean Style Public Building - Focused on the positivistic case R&D Technologies in Neo-Korean Style Public building

  • Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.5-13
    • /
    • 2017
  • Purpose: This study, by comprehensively the characteristics of new Hanok application techniques with the proposed site application technology in the course of the design changes that have been accumulated through Hanok technology development the second stage business, by analyzing the range of reflection, new Considering the direction reflects the efficiency of the new Hanok application techniques. Method: new Hanok application technology, it was been established through research and development of large 1 new Hanok technology it has been proposed through the "site-specific application techniques" and 2 builders and designers "space-time proposed technique" Analysis of the case, at the center of the design changes, the land the body of laws and regulations, the requirements of the public buildings, compared to the construction method and the like for the reduction of construction costs, new Hanok applied technology in the process of change by it There was analyzed whether acceleration on the range and step which is reflected in the design Result: The result of new Hanok applied technology was built through the demonstration build business case, process another major technology, foundation, woodwork, walls, roof, has been reflected in the ceiling construction, the inclusion of items in the proposed technique of construction , it was applied to the main steps in general, except for other construction work landscaping. Application techniques and construction proposal technology research team has presented, show the difference between the scope and method. With significance effort to improve the unreasonable traditional methods of these core processes that can be reflected in the field repeated the construction proposed technique as a result of the utility that can be applied for substantial construction.

A Study on the Curricular Development of the Dept. of Landscape Architecture in Junior Colleges (專門大學 造景科 敎育課程 修正開發에 關한 硏究)

  • Ahn, Seong-Ro;Yoon, Keun-Young;Kim, Hak-Beom
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.18 no.3 s.39
    • /
    • pp.99-113
    • /
    • 1990
  • The purpose of this study was to prepare some more up-dated and advanced curriculum in Landscape Architecture in Junior College education to bring up a leading professional who can meet the changing social needs. To achieve this goal, the data about the actual employment status of graduates, current relevant systems and legistations, the questionnaires of Landscape companies, graduates and undergraduates, and the current relevant curriculum of domain 6 junior colleges and Japanese relevant curriculum was gathered and analyzed The results are as follows ; 1. Currently the majority of the graduates are employed in Construction field, but the employment trend of graduates shows diversification and subdividing as following 5 fields, that is Construction, Design, Maintenance, Administration and Indoor Landscaping. 2. It is essential to bring up a Landscape Technician who has a Landscape Certificate of qualifications(esp. 2nd class). 3. Lately, the actual Practice came to be one item of the qualifying examination, so the subjects of Landscape Design, Landscape Construction and Landscape Estimation Should be emphasized, Accordingly, current curriculum should be revised. 4. Currant curriculum model(1979) made by the Ministry of Education doesn't play a real and adequate role and should be up-dated in view of the current curriculum of domain 6 junior colleges has no regular standards. In preparation for new standardized curriculum model, following criterior could be suggested, that is, ratio of the Major Required Subjects vs. The Major Optional Subjects would be 50 : 50, and the Major Optional Subject would be 48 credits which is 150% of the Required Credits(32 credits) 5. The subjects such as Basic Agriculture, Afforestation, Nature Conservation, Sketch, Civil Engineering, Landscape Seminar and Modelling Practice would be deleted in the curriculum model established in 1983. 6. The subjects such as Perspective Practice, Indoor Landscaping, Landscape Legislation and Landscape Design( III ) could be newly opened to meet the social needs, to prepare for the qualifying examination and to serve well in the employment fields. 7. The subjects of Surveying ( I ) & ( II ) would be unified into one Subject as Surveying, and some in view of the average situation of 6 junior colleges. 8. It is urgent to open some subject related to computer. At first, An Introduction to Computer could be recommended in the cultural studies course and Landscape Computer Technique as the Major Optional Subjects.

  • PDF

A Study on the Selection of Environmental Impact Assessment Factors through Public Participation (주민참여를 통한 환경영향평가 항목선정에 관한 연구 : 원자력발전소 개발사업을 대상으로)

  • Kim, Kwi-Gon;Youn, So-Won;Sung, Hyun-Chan;Park, Byoung-Won
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.1
    • /
    • pp.25-35
    • /
    • 1995
  • The objective of the study is to produce preferential impact assessment factors for Environmental Impact Assessment by considering regional features and public participation in the initial stages of EIA. In order to produce preferential impact assessment factors, the study was carried out through theoretical research and a survey of public awareness as a ways to reflect public participation based on theoretical research. The survey of public awareness was conducted in the form of an interview to review the impact which the construction of atomic power plants at Hyo-am village, Jang-an, Kyungsang Province and Bi-hak village, Suhsang-myon, Ulsan-Kun will have on the surrounding environment: to reflect public participation on deciding preferential assessment: and to determine the extent of alternatives of the proposed project. As the result of the study, the following were identified as preferential assessment factors in the settlement and surrounding areas cultivation marine products, change of temperature of seawater due to flow of warm water, land use(negative), noise vibration during construction, existing plants, erosion accumulation, influx of manpower for construction(negative), recreation landscaping during construction and operation, change in flow of transportation during construction, the quality of seawater during construction and operation were produced as preferential assessment factors in both settlement area and neighboring areas. In the settlement area, the educational environment(negative & positive) and positive aspects of the influx of manpower for construction were also identified as preferential assessment factors.

  • PDF

A Study on the Selection of Environmental Impact Assessment Factors through Public Participation (주민참여를 통한 환경영향평가 항목선정)

  • Kim, Kwi-Gon;Youn, So-Won;Sung, Hyun-Chan;Park, Byoung-Won
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.15-26
    • /
    • 1995
  • The objective of the study is to produce preferential impact assessment factors for Environmental Impact Assessment by considering regional features and public participation in the initial stages of EIA. In order to produce preferential impact assessment factor, the study was carried out through theoretical research and a survey of public awareness as way to reflect public participation based on theoretical research. The survey of public awareness was conducted in the form of an interview to review the impact which the construction of atomic power plants at Hyo-am village, Jang-an, Kyungsang Province and Bi-hak village, Suhsang-myon, Ulsan-Kun will have on the surrounding environment : to reflect public participation on deciding preferential assessment: and to determine the extent of alternatives of the proposed project. As the result of the study, the followings were identified as preferential assessment factors in the displacing settlement and surrounding areas: cultivation marine products, change of temperature of seawater due to flow of warm water, land use (negative), noise vibration during construction, existing vegetations, erosion sedimentation, influx of manpower for construction(negative), recreation landscaping during construction and operation, change in flow of transportation during construction, the quality of seawater during construction and operation were produced as preferential assessment factors in both displacing area and neighboring areas. In the displacing settlement area, the educational environment(negative & positive) and positive aspects of the influx of manpower for construction were also identified as preferential assessment factors.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.