• Title/Summary/Keyword: Landscaping Construction

Search Result 103, Processing Time 0.031 seconds

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.

A Study on Keijo Imperial University's Landscaping Characteristics and Construction Process in the Period of Japanese Occupation (일제강점기 경성제국대학 정원 특성과 시행과정 고찰)

  • Kim, Hai-Gyoung;Yu, Joo-Eun
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.30 no.3
    • /
    • pp.1-11
    • /
    • 2012
  • This study examines the implementation process of landscaping projects in Japanese colonial era focusing on landscaping of Keijo Imperial University and draws conclusions as follows. First, landscaping of Keijo Imperial University in Japanese colonial era progressed based on Hoegyebeop and it provides important materials including the floor plan of the garden, detailed statement and other documents required for the construction. Second, it was all Japanese enterprises that took part in landscaping of Keijo Imperial University and the construction progressed under a private contract by lowest-price contract-awarding system after five enterprises' submitting estimates. Third, according to the floor plan for the landscaping, the garden had a shape of a quadrant and its boundaries were utilized as side gutters and connected to a drainage system. Fourth, though the floor plan doesn't clarify specific names of trees, detailed statement shows sorts of trees of the time. Trees of Chosun were plentifully introduced due to regional features and pines were the most expensive one when they were voluminous. This study has significance that it conducts an empirical research on main materials and techniques of landscaping projects in Japanese colonial era.

A Basic Study on the Improvement of Construction Management Engineer Placement According to Workload (업무량에 따른 건설사업관리기술자 배치개선에 관한 기초연구)

  • Lee, Taick-Oun;Lee, Kook-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.114-115
    • /
    • 2018
  • Since the introduction of the C.M(Construction Management)system in the Basic Law of the Construction Industry in 1997, the recent arrangement of construction management engineers in public sector buildings has generally been based on architecture·civilengineering·machinery·landscaping, electricity, telecommunication, fire fighting by the number of M/M(Man and Month). In the field of engineers arrangement in each field, the arrangement of M/M according to the workload of architecture.civilengineering.machinery.landscaping and electricity is inadequate causing conflicts and C.M among construction management engineers. Therefore, this study aims at basic research that is used to identify the problems through the questionnaire and to prepare future improvement plans.

  • PDF

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

A Study on Landscape Ordinance of the Korean Building Code (건축허가기준으로서 조경법규에 대한 고찰)

  • Suh, Eung-Chul
    • KIEAE Journal
    • /
    • v.11 no.4
    • /
    • pp.79-85
    • /
    • 2011
  • Landscaping on building sites has been regulated by Building Code in Korea. By Article 42 of the Code, landscaping is mandated in the process of building construction and people should comply with the code to get the building permit. On the other hand, sustainability tends to be a prime value these days. Because of the intrinsic nature of Korea Building Code, the landscaping was not adequately implemented in reality. After studies on the landscape ordinance, the major problems on the mandated landscaping has been speculated as follows: 1. As far as landscaping has been regulated by single building code, there seems to be a limitation. Urban Planning Code etc. would be another mean to adequate landscaping. 2. Speculations on landscape details associated with landscape plans are needed for building permit process. 3. By any level of law, the landscape should be reinforced for public buildings and developments because of its own publicity. 4. Locally sound landscape would be implemented through Special Architectural District etc.

A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction - (실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로-)

  • 박원규;김두하;안동만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.1
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

A Study on the Design & Construction Method of Traditional Landscape Space through the 『Imwongyeongjeji』 「Seomyongji」 and the 'Standard Specification for Repairing Cultural Heritages' (『임원경제지』 「섬용지」와 문화재수리 표준시방서를 통해 본 전통조경공간 설계 시공방법)

  • Lee, Jung-Han
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The purpose of this study is to examine the design & construction methods of the traditional landscape space of the past and the repair and maintenance of cultural heritages to maintain it today. To this end, the method of narrative description, process extraction and construction related to traditional landscaping were compared to each other based on the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages'. The results are as follows; First, to analyze at the description methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages' and related processes in the field of traditional landscaping. 『Imwongyeongjeji』 「Seomyongji」 was an encyclopedia of the overall construction method of the living space, describing the location, effect, and advantages and disadvantages of each component and presenting quantitative figures to institutionalize the construction of traditional landscaping spaces. 'Standard Specification for Repairing Cultural Heritages' presented the entire process of repairing cultural heritages, and it is becoming a kind of guide for reference at the site. Among them, foundation construction, roof construction, landscape construction, and fence construction were drawn as items that could be applied to traditional landscaping areas. Second, the traditional landscape space construction method was divided into the processes of foundation construction, roof construction, landscaping construction, and fence construction. Foundation construction is a way of repeating the process of land-tramping. During the construction of the roof, the tile-roofed building was built on top of the rafters and roofed with tiles. And thatched roof was made to a number of rice straws bundles to cover the roof one after the other. Instead of tiles, the stone roof was made of thin and wide stones, and the wooden boards were used for the single roof and the bark roof were constructed with many layers of dried corrugations. Landscape construction mainly consists of the Paving technique through tramping rubble and the construction of terraced flower by planting stone, plants, and shrubs on the top. According to the building materials, the wall construction was derived from the earth-stacked earthen wall, stone walls using stone and clay, marble walls made of tile patterns, and the construction of a board wall using a wood board as a wall. Third, comparing the construction methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages', 『Imwongyeongjeji』 「Seomyongji」 focuses on standardizing the construction methods to create a new traditional space. There is a difference in the setting of the scope of the 『Imwongyeongjeji』 「Seomyongji」 and the construction because 'Standard Specification for Repairing Cultural Heritages' provides the overall construction procedure considering the diversity of the cultural heritages. In addition, the traditional landscape space used to be a residential space in the past, but today, the maintenance process of the already established facilities as designated cultural heritages has been carried out, and construction methods have been added to create viewing conditions. In terms of the succession of traditional knowledge, some similar methods were found in the repair of cultural assets today, and some cases were also confirmed in the reconstruction of traditional technologies such as application of some materials or mix, separation of added facilities and introduction of efficient construction methods.

An Analysis of the Types of Planting Design Change Orders and on Its Feasibility Cognition in the Landscape Planting Construction - Focused on the Planting Construction of Apartment Complex Practiced by 'A' Housing Corporation - (조경식재공사 설계변경 유형 및 변경 적합성에 대한 인식 분석 - A공사 아파트단지 식재공사를 중심으로 -)

  • Park, Jae-Young;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.1
    • /
    • pp.18-26
    • /
    • 2014
  • This study was conducted to analyze the recognition of the validity of the design changes that classified the type of design changes that occurred in the Apartment Complex Landscaping Planting Construction that have been ordered in 'A' work. This research was also carried out for the purpose of presentation of the basic data in order to effectively manage the change order of landscape-planting construction's future work. The following conclusions were derived. First, the 7 types of change orders in planting design were delineated as 'design changes for image improvement', 'design changes due to the mismatch of design statement', 'design changes due to lack of field study', 'design changes for consideration of the user', 'design changes due to consideration of the workability', 'the design changes for ease of maintenance', and the 'design changes due to the relationship with the Engineering species of other.' Second, it is possible to produce a negative impact of all construction costs have increased due to design changes of landscaping planting construction is grasped. Third, There were the most frequent change order in planting design for the 'image improving', 'due to the mismatch of planting design to the site situation.' Fourth, the results of confirmatory targeting professional landscaping areas, was found that the statistics of the type of change landscaping planting construction design seven derived in this study is valid.