• 제목/요약/키워드: Landscape Impact

검색결과 685건 처리시간 0.026초

경관영향평가서의 실효성 평가 -경관영향평가서와 환경영향평가서의 내용분석을 중심으로- (An Evaluation on the Efficacy of Landscape Impact Statement -through Content Analysis of Landscape Impact Statements and Environment Impact Statements-)

  • 이영경
    • 한국조경학회지
    • /
    • 제27권5호
    • /
    • pp.66-79
    • /
    • 2000
  • Landscape impact assessment(LIA) is an aid to decision-making. For the decision maker, LIA provides a scientific examination of the predicted landscape implications of a proposed action and of the mitigation measures, before a decision is taken. Thus, the efficacy of LIA depends on the scientific credibility of the prediction and mitigation measures described in the landscape impact statement. The purpose of this paper was to examine the efficacy of LIA through the content analysis of prediction and mitigation measures in the selected 39 landscape impact statements and 34 environmental impact statements. The content of the selected statements was analyzed in terms of the quantification, precision, significance, and likelihood. The results showed that both prediction and mitigation measures were very low in the scientific credibility. Specifically, the prediction was ambiguously described without scientific probability, and the effect of mitigation measures was not specifically presented in the reports. Thus, landscape impact statement can not give credible information in the decision making process, which weakens the efficacy as an aid to decision-making. Based on the results, several suggestions were presented to enhance the efficacy of LIA.

  • PDF

독일 환경영향평가에서의 자연환경의 평가절차 (Use of Methods and Evaluation Systems of the Impact Mitigation Principle in German EIA)

  • Peters, Wolfgang
    • 환경영향평가
    • /
    • 제2권2호
    • /
    • pp.49-53
    • /
    • 1993
  • Before the EIA was established in the Federal Republic of Germany, the impact mitigation principle - a planning instrument, which has its legal foundation in the German nature conservation legislation already had {and still has} the function to valuate environmental impacts. The valuation principles and methods which have been developed in correlation to this instrument are now also used in the EIA. Particularly for the valuation of alternating effects on the different ecological landscape functions and for the valuation of ecological mitigation and compensation measures this valuation methods are used. These methods base on a special kind of modelling nature and environment Following the aim of the nature conservation act, which is to save the capacity of the landscape to perform its essential functions, not the ecological factors (soil, water, air etc.) itselfs are evaluated but the ecological functions of the landscape, which are based on the ecological factors.

  • PDF

경관영향평가제도의 개선에 관한 연구 - 사전환경성검토와 환경영향평가를 중심으로 - (A Study on Improvements of Landscape Impact Assessment - EIA and PER in Priority -)

  • 최형석
    • 한국환경복원기술학회지
    • /
    • 제8권4호
    • /
    • pp.68-80
    • /
    • 2005
  • This study intends to analysis problems and propose of EIA(Environmental Impact Assessment) and PER(Pre-Environmental Review) especially on division of landscape impacts. The problems of EIA and PER are first, on analysis of existing conditions side, insufficiency of the list of landscape elements and their descriptions and presentations, and the number of viewpoints and each validity second, on estimation of landscape impacts, the methods and techniques of estimation and simulation, and the process of impact estimation, third, on suggestion of reduction plans, reduction devices covering impacts, the lack of influence reduction forecasting devices, the deficiency of execution power of reduction plans, finally, the systematic connection of impact estimation with existing conditions analysis and reduction plans. Therefore, on each step from existing condition analysis to reduction plan suggestion, the solutions to each problem are proposed.

지구단위계획에서 사용된 경관영향평가 기법에 관한 연구 (A Study on Landscape Impact Assessment Techniques in District Unit Plan)

  • 봉종진;정영덕;이봉수;조영준
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2005년도 추계학술대회 논문집
    • /
    • pp.219-222
    • /
    • 2005
  • District unit plan was arranged for rational induction and regulation of development due to increase of demand for comfortable environment and change of recognition of urban view. This study analyzes cases of district unit plan since 2003 and draws the following conclusions to provide basic material necessary for landscape impact assessment and analysis of actual conditions. It used regulation of design factors and analysis of physical index in making view plan and focuses on characteristics of visual perception in predicting impact through simulation. Future landscape impact assessment must establish a variety of indices and application of various techniques.

  • PDF

개발사업에 의한 자연경관 영향 저감방안 중요도 분석에 관한 연구 (A Study on the Analysis of the Importance of Natural Landscape by the Development Project)

  • 신민지;신지훈
    • 농촌계획
    • /
    • 제25권2호
    • /
    • pp.99-117
    • /
    • 2019
  • Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.

국립공원 및 인접지역 경관관리 방안에 관한 연구 - 설악산 국립공원을 중심으로 - (A Study on the Visual Resource Management for Soraksan National Parks and Adjacent Area)

  • 임승빈;신지훈
    • 한국조경학회지
    • /
    • 제26권2호
    • /
    • pp.283-292
    • /
    • 1998
  • The purpose of this study is to suggest visual resource management methods for the national parks and adjacent areas, where visual impacts by high rise buildings such as hotel, condominium, etc. become serious problems. In this study Soraksan National Park has been selected as a case study for landscape management planning. The results of this study are as follows: 1) Comprehensive landscape management planning for National Parks and adjacent areas is necessary to solve visual impact problems by high rise buldings such as hotel, condominium, etc. 2) It is suggested to investigate visual resources and conceptual landscape management ideas, to select landscape control points and lines, landscape management areas, and to prepare building height control plan for proper landscape management plan. 3) In case of Soraksan national park, the landscape management plan includes three landscape management areas : Landscape preservation area, General landscape management area, and special landscape management area. 4) In the part of special landscape management area, it is necessary to introduce landscape impact assessment system to more effective landscape management.

  • PDF

경관변화에 따른 시각적 영향의 분석 : Computer Graphics 활용을 중심으로 (Analysis of Visual Impact by Landscape Change: Computer Graphics Application)

  • 김귀곤;오규식;전성우
    • 환경영향평가
    • /
    • 제1권1호
    • /
    • pp.41-50
    • /
    • 1992
  • To prevent unwanted visual impacts of proposed projects before they are actually built, Visual Impact Assessment(VIA) is conducted in current landscape planning and management process. The application of VIA to actual projects raises some important questions: "What views will the project affect?" "What tools and techniques are effective for predicting and portraying future landscape conditions?" "Who should determine the value of the impacts?" and "How can the impacts be measured?" Types and levels of visual impacts should be decided through analyzing both the existing landscape and the proposed project. Computer-based visual simulations will play a pivotal role as effective prediction and communication tools. With professionals' assistance, the public participation in the VIA process will produce meaningful solutions for planning and managing the future landscape. Also, the use of a proper response format and sensitive assessment criteria in measuring the public's opinion will enrich outcomes of the assessment. Based on the methodological framework, the case study briefly explains an application of VIA to an actual project.

  • PDF

도시개발사업에 대한 환경영향평가에서 경관영향분석 사례 연구 - 경관영향평가를 위한 3D Simulation 기법의 활용을 중심으로- (A Study on the landscape impact assessment in evaluating the environment impact of the urban development projects)

  • 이민훈;조병호;임영택;최봉문
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2007년도 추계 종합학술대회 논문집
    • /
    • pp.22-26
    • /
    • 2007
  • 본 연구에서는 개발사업 사례를 선정하여, 경관영향평가 프로세스와 세부 평가항목을 검토하고, 특히 평가항목 중 위락 경관요소 측면에 환경영향평가작성등에 관한 규정에 명시되어 있는 프로세스를 따르고 있는지, 각 실제 개발사업에서 현황조사나 사업 시행으로 인한 영향예측, 저감방안 등이 합리적으로 실행되어지고 있는지의 여부를 판단하고 개선방안을 도출하고자 하였다. 본 연구는 자연환경이나 경관의 중요성에 대한 인식이 높아지는 것에 맞추어 환경영향평가에서 합리적 경관영향평가를 위해 3D Simulation을 활용하여 각 개발 분야의 특성을 고려하고 그에 맞는 합리적인 대안 제시에 기여할 수 있을 것으로 기대된다.

  • PDF

경관영향평가 기법을 통한 댐건설에 대한 경관영향평가 (The Visual Impact Assessment in Dam Construction Using Visual Impact Assessment Method)

  • 김대현;구본학
    • 한국조경학회지
    • /
    • 제27권4호
    • /
    • pp.80-86
    • /
    • 1999
  • The purpose of this study was to suggest a case study and anlaysis of the visual impact in dam construction through visual impact assessment method in Dong-sang river. The results can be summarized as follows; 1) For the evaluation of the visual impact of dam construction, five steps such as field analysis of visual status, finding visual sensitivity area and visual control point, making visual simulation material and evaluation, and visual impact analysis and assessment were suggested as desirable. 2) In the case study, the visual impact of dam construction was evaluated to be simple, unique, modern, static, cool and unfamiliar. 3) There was a few difference between the pre-construction and post-construction in statistical test. Especially, The dam in Man-Jee area was evaluated to be artificial, unique and destroyed in statistical difference, and then we design dam structure with visual friendliness. 4) In conclusion, there was high correlation between pre-construction landscape and post-construction landscape through semantic differential scale method using eleven adjectives. Therefore, we state that there is no visual impact for the dam construction for the moment.

  • PDF

자연경관 내 개발사업에 대한 경관영향예측 시뮬레이션 (A Study on the Landscape Impact Simulation for Development Projects in Natural Landscape)

  • 신민지;신지훈
    • 농촌계획
    • /
    • 제25권3호
    • /
    • pp.59-66
    • /
    • 2019
  • This study saw developed to build a landscape monitoring methodology by simulation of landscape effect prediction. A Visual landscape planning and management system has been introduced and implemented by each ministry so as to solve the problems of visual landscape destruction due to recognition on the value of natural landscape of beautiful territory and various development projects. At present, this system emphasizes the importance of the visual and perceptual aspect of the landscape however, there is a lack of techniques required for comprehensively predicting, evaluating, and managing it. Furthermore, sustainable landscape management after the completion of development projects has been inadequately carried out, as the focus has been only on consultation in the planning process of the development project in institutional performance. The viewpoint for judging the change in the visual landscape of the development plan and development project should be selected as the effective point where the development project is expected to result in a remarkable landscape change. As for the method of selecting effective viewpoints, the main viewpoints are selected by analyzing the visible area of the target viewpoint. When selecting the viewpoint centered on the viewpoint target, it was judged that it is possible to reduce the procedure of selecting and checking the existing preliminary viewpoints and widening the effective visible range. The proposed visual landscape monitoring is expected to be able to solve the existing institutional problems, and to be used when the implementers and authors of the development projects review the effects on the landscape.