• Title/Summary/Keyword: Landfill gas(LFGs)

Search Result 2, Processing Time 0.015 seconds

A Study on Landfill Gases in Old Open Dumping Landfill Site (단순 매립지내의 매립가스에 관한 연구)

  • Yeon, Ik-Jun;Ju, So-Young;Yoon, Chol;Yi, Myoung-Sun;Kim, Kwang-Yul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.1 no.1
    • /
    • pp.13-18
    • /
    • 2000
  • The purposes of this study are the analysis of landfill gases(LFGs) in old open dumping landfill site near middle city and offer the useful data for reusing the landfill site as the residental, commercial and other purposes. The concentration of $CO_2$ and $CH_4$ were lower as 8.28 vol% and 1,247 ppm but the concentrations of $NH_3$ and $H_2S$ were 7 times and 12 times higher than TLV-TWA standard. The concentration of $CH_4$ and other gases were lower than the ACGIH criterion. As the result of the environmental assessment on the open dumping landfill, if appears that this landfill is maturation phase and the formation of LFGs is reduced. If the treatment facility of $NH_3$ and $H_2S$ gases is prepared, it can be safely used as this landfill site.

  • PDF

A Study on Variation of Landfill Gases in Completed Refuse Landfill Site after the Stabilization (사용종료 매립지의 지반안정화 후 매립가스의 변화)

  • Lee, Min-Hee;Ju, So-Young;Park, Jun-Kyu;Yeon, Ik-Jun;Kim, Kwang-Yul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.1
    • /
    • pp.27-34
    • /
    • 2004
  • The reclaimed waste layer in a completed refuse small landfill site was stabilized by JSP(Jumbo Special Pattern System) method. There were some variations of landfill gases(LFGs) after the stabilization. This study investigated the landfill gases emitted from a open dumping landfill site. We measured concentration of landfill gases before and after the construction, and 28 months later. As a result, the concentrations of $H_2S$ and $NH_3$ gases before the construction were 123.51ppm and 171.54ppm, respectively. These values were higher than TWA(Time Weighted Average) values. But the concentrations of $H_2S$ and $NH_3$ gases after the construction were 55.59ppm and 20.51ppm, and they also decreased 9.04ppm and 11.82ppm in 28 months. $CH_4$ and other landfill gases after the construction were little or a little detected in the landfill site. Hence we found out that concentrations or classes of landfill gases causing some problems extremely decreased by way of the stabilization.

  • PDF