• Title/Summary/Keyword: Land Development Expense

Search Result 15, Processing Time 0.023 seconds

The Study of Seabed Organic Sediment Dredging Equipment Development Used the Pressure Difference (수두차를 이용한 해저 유기퇴적물 준설장비 개발에 관한 기초연구)

  • SON CHOONG-YUL;JEONG UH-CHEUL;EEO JOON;CHOI JAE-KWON;LEE JUNG-TAK
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.57-61
    • /
    • 2004
  • According to the research result of existing regarding the seabed organic sediment, contamination it flows from the land and the sea become the enemy in the coastal water. It was caused with the summer season water temperature rise and dispersing recall respect advancement. Phosphorus which is a main reason of red tide actual condition came to reveal vast quantity with the facts that it gushes. Specially, in the case of the coastal closing waters and the nursery, as the corpse and the fresh fish washing veterinarian was imbrued, it is the actual condition where is more deepened. Consequently the development of shallow layer dredging method of that suction power which is stabilized is demanded to be able to dredge only the sediment layer which has not become the pressure and is a main reason of being imbrued. The dredging methods using the pressure difference minimize the suction of the seabed sediment. This method is stable that suction power which occurs from guard difference of the guard and the guard of the dredging system inland water. That's why it is possible to sort dredging of the organic sediment ranging in upper layer sediment and it will be able to expect the minimization of dredging quantity. Increase of the expense that it followsin orthocenter with the fact will not grow. Because the pressure difference of the dredger inland water is occurred by the suction power. Maintenance administrative costs are reduced, because the one of smallest dredging system maneuvers and the barge which affixes an integrated operation system is mainly in a resting. To reduce a dredging hour, it will be able to solve in the condensed water as operating the jar guard post.

  • PDF

Landslide Susceptibility Prediction using Evidential Belief Function, Weight of Evidence and Artificial Neural Network Models (Evidential Belief Function, Weight of Evidence 및 Artificial Neural Network 모델을 이용한 산사태 공간 취약성 예측 연구)

  • Lee, Saro;Oh, Hyun-Joo
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.2
    • /
    • pp.299-316
    • /
    • 2019
  • The purpose of this study was to analyze landslide susceptibility in the Pyeongchang area using Weight of Evidence (WOE) and Evidential Belief Function (EBF) as probability models and Artificial Neural Networks (ANN) as a machine learning model in a geographic information system (GIS). This study examined the widespread shallow landslides triggered by heavy rainfall during Typhoon Ewiniar in 2006, which caused serious property damage and significant loss of life. For the landslide susceptibility mapping, 3,955 landslide occurrences were detected using aerial photographs, and environmental spatial data such as terrain, geology, soil, forest, and land use were collected and constructed in a spatial database. Seventeen factors that could affect landsliding were extracted from the spatial database. All landslides were randomly separated into two datasets, a training set (50%) and validation set (50%), to establish and validate the EBF, WOE, and ANN models. According to the validation results of the area under the curve (AUC) method, the accuracy was 74.73%, 75.03%, and 70.87% for WOE, EBF, and ANN, respectively. The EBF model had the highest accuracy. However, all models had predictive accuracy exceeding 70%, the level that is effective for landslide susceptibility mapping. These models can be applied to predict landslide susceptibility in an area where landslides have not occurred previously based on the relationships between landslide and environmental factors. This susceptibility map can help reduce landslide risk, provide guidance for policy and land use development, and save time and expense for landslide hazard prevention. In the future, more generalized models should be developed by applying landslide susceptibility mapping in various areas.

Dynamic Peak Load Calculation for Friendly Environment Energy Supply and Demand Plan at the Newport Area in Busan (부산 신항만지역 환경친화적 에너지 수급을 위한 동적 열부하계산)

  • Yee, Jurng-Jae;Lee, Sun-Ae;Cho, Yong-Soo;Doe, Geun-Young
    • Journal of Navigation and Port Research
    • /
    • v.28 no.3
    • /
    • pp.269-276
    • /
    • 2004
  • The reclaimed land has peculiar characteristic of nature environment unlike midtown or inland and also, in comparison with inland, has bad weather condition, such as low temperature, strong wind, excessive sunshine, and moisture involved in a salt. Therefore the case of developing water front needs understanding characteristic of weather environment mused by reclamation in detail and proper development and organized maintenance. If development which doesn't investigate topographic and climate characteristic sufficiently is drove ahead, a rise of expense for energy and maintenance is going to be mused by deteriorating weather environmental, occurring a flaw of facility and calculating inaccurate capacity of facility. We looked into the weather state and drew up the standard weather data of the newport area in Busan which is reclaiming and developing now. In this research at the base qf the standard weather data, we calculate the dynamic peak loads for commerce, business and residence and then we utilize the results of the load calculation as basic information to determine facility capacity in the rear city of the newport area.

Technology Trends of Metal Recovery from Wastewater (폐수(廢水) 중(中) 유가금속(有價金屬) 회수기술(回收技術) 동향(動向))

  • Hwang, Young-Gil;Kil, Sang-Cheol;Kim, Jong-Heon
    • Resources Recycling
    • /
    • v.22 no.3
    • /
    • pp.91-99
    • /
    • 2013
  • Steel industry which has been accomplishes the base of our country economy, automobile and electronic industry are taking charge of the role, whose electroplating is important. Large amount of wastewater and various metal salts, including hazardous materials was generated from the electroplating pre-treatment, plating, washing and post-plating. Currently, the general wastewater follows in the environmental law and neutralization after controlling, sludge where the various metal is mixed reclaims below multiple regulative and trust it is controlling. The sludge which includes the gas price metal reclaims in the field and trust it controls. a reclamation price of land it is insufficient but and the control expense holds plentifully and it loses the gas price metal which is valuable. Consequently, The research regarding to recover a gas price metal actively from this waste water, it is advanced. A new method to recover valuable metals from electroplating wastewater synthesis of metal sulfides using topical methods utilizing iron oxidizing bacteria, reagent of sulfides and solvent extraction using an organic solvent, such as the development of the law to recover these metals and metal sulfides of wastewater using selective recovery have been studied. By using these wastewater treatment method under frequency above 95%, it has been obtained the valuable metal from the wastewater, where the metal ion of Fe, Cu, Zn and Ni complexes was mixed. As we discuss the wastewater, which has been discharged from electroplating process, it is important and will be applied to the resources of metal in the urban mine.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF