• Title/Summary/Keyword: Labor cost

Search Result 1,110, Processing Time 0.029 seconds

Personnel Scheduling of Restaurant using Integer Programming (정수계획법을 이용한 외식인력 스케줄링)

  • Choi, Kyu-Wan
    • Korean Journal of Community Nutrition
    • /
    • v.12 no.5
    • /
    • pp.630-638
    • /
    • 2007
  • The purpose of this study is to investigate an efficient use of labor in personnel scheduling for the restaurant industry. More specifically, this study attends to reduce overall labor cost while not sacrificing both full-time and part-time employees' schedules. The customers' demands were measured by sales in this analysis. Historically, server scheduling in the restaurant has been practiced by manager's experience and intuition; however, those practices provided drawbacks because managers often fail to consider external factors such as a employees' working conditions and change in a restaurant's size. The result of a new method in personnel scheduling provided significant cost saving compared to a previous scheduling technique. This study found that a new method in personnel scheduling allowed the restaurant to save labor cost. The outcome of this study should of for important strategic implication for the restaurant managers.

Analysis of Current Operational Practices and Issues of Contract-Managed Foodservice Companies in Republic of Korea (위탁급식 전문업체의 운영 현황 조사 및 현안과제 분석)

  • Eom, Yeong-Ram;Ryu, Eun-Sun
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.3
    • /
    • pp.197-208
    • /
    • 2003
  • This study was surveyed to provide the information on current operational practices and issues of contract-managed foodservice companies. Questionnaires were distributed to 79 contract-managed foodservice companies (eight large-size, 48 mid-size, 23 small-size companies) from March to May in 2002. The contract-managed foodservice companies provided averages of 269,184 (range 140,036-503,500), 14,837 (range 450-75,269), and 4,065 (range 930-8,050) meals daily from large, medium, and small-size companies, respectively. The companies managed to averages of 268.2 (160-619) foodservice contracts at large-size companies, 21.9 (5-63) contracts at mid-size companies, and 4.7 (1-10) contracts at small-size companies. The average numbers of dietitians were 298.6 (range 104-671) in large-size companies, 22.2(6-86) in mid-size companies, and 3.8(1-9) in small-size companies. The averages of sales were 156.5 billion at large-size companies, 6.7 billion at mid-size companies, and 1.7 billion at small-size companies in 2001. The contract was two types including management fee contract(5%), and profit and loss contract(95%). The cost ratios for office foodservice were 59.5% at food cost, 24.2% at labor cost, 6.3% at profit, and 10.1% at other cost. For hospital foodservice, the ratios were 54.0% at the food cost, 34.6% at labor cost, 3.0% at profit, and 11.8% at other cost. For high school foodservice, the ratios were 62.2% at the food cost, 21.5% at labor cost, 5.4% at profit, and 11.2% at other cost. When the contractors managed to the foodservice, the most important matters were the sanitation management and customer satisfaction. Also, the difficult problems were excess investment of equipments and low meal prices.

  • PDF

Dental implant cost by top-down approach (하향식(Top-down)방식을 적용한 치과 임플란트 원가산정)

  • Shin, Hosung;Kim, Min-Young
    • The Journal of the Korean dental association
    • /
    • v.52 no.7
    • /
    • pp.416-424
    • /
    • 2014
  • The purpose of this study is to analyze the cost of dental implant by top-down method and, on that basis, to provide salient information for the suitable standard of dental insurance fee. A survey data and accounting documents from 36 samples of dental clinics secured with the organisation authority are used and analysed for extracting the representative sample of dental clinic. A researcher visited the dental clinics in person and conducted additional interviews in the omitted case of accounting documents. A dental implant cost by top-down method was estimated to 1,430,000 won. Labor cost accounted for 43% of the total cost structure, ranking it 1st and, management cost, material cost and interest cost on investment cost in order are investigated. Labor cost counts of the total cost that shows the similar aspect to the existing result. Cost in cost accounting of medical care would be used for the judge that cost pursed value for dental service, not price or fee.

Development of Labor Management System Based on RFID Technology for Construction Field (RFID기술을 활용한 건설현장의 노무관리시스템 프로토타입구축)

  • Han, Jae-Goo;Kwon, Soon-Wook;Cho, Moon-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.853-858
    • /
    • 2007
  • Construction industry is traditionally labor intensive. And construction site is also in densely populated environment. So accurate labor monitoring is one of important issues for site management. Labor cost shares large amount of part in total construction cost. Therefore, it is a major element in site management and control. In this article, we explained development of prototype system for labor monitoring based on RFID technology and results of field tests using the system. According to the results, the system is able to expected to improve effectiveness of Labor management in construction site

  • PDF

The Characteristics and Impacts of the Relocating of Production Facilities to Abroad: A Case of Korea (생산시설 해외이전의 유형별 특성 및 효과분석)

  • 양희승;임채윤
    • Journal of Technology Innovation
    • /
    • v.6 no.2
    • /
    • pp.54-79
    • /
    • 1998
  • Entering the 1990s, Korean economies experienced the high-cost and low-efficiency situation which evetually caused many Korean firms led to relocate their production facilities to lower labor cost countries. This paper aims to draw out the characteristics of FDI and to evaluate the impacts of FDI in manufacturing sectors. Firstly, we try to categorize the indutries into three groups, labor intensive, capital intensive, and the technology intensive industries figuring out the characteristics of FDI of Korean firms. Secondly, we compare the three categories by grouping high and low foreign investment areas using value added data. Thirdly, we analyse the impacts of foreign production relocation the number of firms, production volume and jobs creation in Korea during the period 1991-1996. This paper concludes that the FDI of Korean firms concentrates to labor intensive industry and the hollowing effect caused by FDI was observed partially in the labor intensive industry.

  • PDF

Factors Affecting Productivity for University Food Service Operations (대학급식소의 생산성 요인분석)

  • 조순희;홍성야
    • Korean journal of food and cookery science
    • /
    • v.14 no.4
    • /
    • pp.407-415
    • /
    • 1998
  • The objectives of this study were to analyze the factors that affect the productivity for university food services. In a survey involving four-year university dining centers throughout the country, and correlations among thriteen different variables that affect productivity were determined. Productivity index (PI) was determined by meals per hour, the average score for 38 institutions was found to be 14.2 meals/hour. For serving methods, the fixed ration had a higher PI than the self-serving. When two types of serving trays were considered, the PI of the compartmantalized trays was higher than that of the tray accompanying saparate small dishes. When single (S)-or. multiple(M)-menu was compared with the cafeteria style, a higher PI was obtained by the S-or M-menu. Among the three operation systems, the PI was found to be the highest by direct operation (17.6 meals/hour), followed by contract operation (11.1 meals/hour) and rent operation (7.9 meals/hour). For the factors that affect the productivity of the university food services, the total number sewed (r=0.54, p<0.001) and the use of convenient food items (r=0.28, P<0.05) exhibited positive correlations, while food costs and labor costs showed negative correlations. This suggests that the productivity of university food service increases as the total number served and the use of convenient food item increased, but decreases as the food costs and labor costs per meal increased. A regression analysis showed that three variables - total number sewed, labor cost per meal, number of employees-influenced about 73% components of food service showed a negative correlation with PI and a positive correlation with the labor cost per meal.

  • PDF

A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects - (원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 -)

  • Kim, Woo-Young;Yi, June-Seong;Lee, Young-Hwan;Lee, Bok-Nam;Kim, Yoon-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.53-61
    • /
    • 2006
  • Korean Government started to publish Korean CCI(Construction Cost Index) again at February 2004 since CAK(Construction Association of Korea) stopped publishing it 1994. CCI is developed using the verified statistical data, that is, input-output table and producer price index by Korean Bank and labor unit cost by CAK. Though the method is available as it uses the verified statistical data, there is a limitation to reflect the characteristics of construction. For overcoming this limitation, this study suggests CCI development method investigating the input structure of labor and material cost for each type of construction project and applying the cost variations of the items.

Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.

Structural Design and Cost Evaluation of Double Hull Bulk Carrier (이중선체 벌크화물선의 선체구조설계 및 경제성 검토)

  • Song, H.C.;Yum, J.S.;Kim, B.I.
    • Journal of Power System Engineering
    • /
    • v.9 no.2
    • /
    • pp.106-111
    • /
    • 2005
  • After many casualties of conventional bulk carriers in recent years, a double hull bulk carrier was proposed to enhance the structural safety of a side shell and a transverse bulkhead. In this paper, two alternative structural designs of a double hull bulk carrier were carried out based on the Lloyd's rule. One has the double sided hull with longitudinal stiffeners and the other has that with a girder. The final structural design was examined in comparison with an existing single hull bulk carrier from the viewpoints of cargo hold capacity and the increases of weight and construction cost. Generally, the construction cost of a ship consists of the costs of material, labor and overhead cost. But, in this study, the relative construction cost concept was introduced to compare the economical validity more precisely. In this concept, fixed overhead cost is excluded in the assessment of construction cost, and only the variable overhead cost is added up to labor cost. As the result of this study, a double hull bulk carrier can be constructed within 1% increase of weight and construction cost.

  • PDF

Investigating the Maintenance Cost of Rest Areas: A Case Study of Nevada

  • Shrestha, Kishor;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.624-631
    • /
    • 2022
  • Highway Rest Areas are envisioned to provide an accessible space for rest and parking for travelers, especially those driving a long distance. In addition, modern highway Rest Areas provide many amenities to highway users, including wifi service, picnic tables, litter barrels, running water, public telephones, and sometimes even free coffee. Various studies were conducted in the domain of Rest Area facility design and their operating costs in different states; however, limited studies were conducted on the maintenance costs of these facilities. Therefore, this study's main objective is to compute the annual maintenance cost of Rest Areas in the state of Nevada. This study also analyzes the main cost categories of the maintenance works. The raw cost data of Nevada Rest Area maintenance from 1990 to 2012 were collected from the Nevada Department of Transportation (NDOT). Results show that the maintenance cost fluctuated over the study period; the maintenance cost decreased from 1991 to 2004 and then increased until 2012. The primary cost categories of maintenance work are labor, equipment, and material costs. Among these, labor cost was the largest category with 56 percent of the total maintenance cost, followed by equipment cost and material cost. The findings of this study may help NDOT and other transportation agencies plan their budget for future Rest Area maintenance activities.

  • PDF