This paper review current situation of New Transit System (NTS) which mainly developed by the western countries. The paper classified NTS by it capacity, physical appearance, and so on. It reviewed the brief history of LRT, which became new guided transport system in terms of transport environment especially for transport handicapped. It also includes the merit of Linear Metro, which could be popular for the urban transport system. Finally, the paper prospects the future of NTS for the planning of urban transport system.
The purpose of this study was to determine the effect of treadmill training on gait, balance, and trunk control in a patient with hemiparesis. A female subject who had suffered a left hemiparesis 12 months previously was selected for this study. A single subject ABA design was used. Eight data-collection sessions were conducted during each of three phases (baseline-intervention-withdrawal). During baseline and withdrawal phases, the treatment based on Bobath approach was performed for the subject, and during the intervention phase, treadmill walking training was added. Assessment tools were made using the 10 m walk test, Rivermead Visual Gait Assessment(RVGA), Berg Balance Scale(BBS), and a seated Lateral Reach Test(LRT). During the intervention phase, the time measured in 10 m walk test and the scores of RVGA and BBS were significantly improved, and the number of steps in 10 m walk test and LRT showed a small improvement. During withdrawal phase, the time measured in 10 m walk test and the scores of RVGA and BBS were shown the carry-over effect. This findings indicate that treadmill training has significant effect to gait function and balance in a patient with chronic hemiparesis.
Due to the absence of design guidelines for elevated light-rail structures in Korea, most elevated light-rail structures have been designed and constructed based on the design codes of conventional railway bridges and on the codes recommended by foreign vehicle manufacturers. This is the main reason why most elevated light-rail structures are massive or over-designed or poorly constructed economically. In this paper, the authors carried out field tests to analyze the braking forces caused by braking a train running at speeds of 50km/h, 60km/h, and 70km/h, acting on the elevated structures of rubber-wheeled Light Rail Transit (LRT) trains. The authors also briefly describe the analyzed results of the braking force acting on the substructures of elevated light-rail structures. The test-results presented here in this paper can be referenced when establishing design guidelines or standards for elevated structures of LRT systems.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.19
no.2
/
pp.77-86
/
2005
The DC protection and control device for the feeding system of a Light Rail Transit(LRT) system is developed. For the development, the short circuit characteristics in the system are analyzed. As a result a protection algorithm for the DC fault selective relay (50F) is newly proposed, and principles of the DC fault selective relay, Line Test Device (LTD), DC Over Current Relay (DC OCR) are introduced From the development, the specifications and codes used to be unclear have become clarified and summarized. Moreover, the methods to examine the protective characteristics and Electromagnetic Compatibility (EMC) are established Finally, the performance and the effectiveness of the developed protective relay have been verified with the test based on IEC. For the reliability of the system, the relay has been installed and is being operated at the test track of the LRT system at Gyeong-San.
In this study, the contributions of emissions (foreign and domestic) and atmospheric physical and chemical processes to PM2.5 concentrations were evaluated during a high PM2.5 episode (March 24-26, 2018) observed on the Jeju Island in the spring of 2018. These analyses were performed using the community multi-scale air quality (CMAQ) modeling system using the brute-force method and integrated process rate (IPR) analysis, respectively. The contributions of domestic emissions from South Korea (41-45%) to PM2.5 on the Jeju Island were lower than those (81-89%) of long-range transport (LRT) from China. The substantial contribution of LRT was also confirmed in conjunction with the air mass trajectory analysis, indicating that the frequency of airflow from China (58-62% of all trajectories) was higher than from other regions (28-32%) (e.g., South Korea). These results imply that compared to domestic emissions, emissions from China have a stronger impact than domestic emissions on the high PM2.5 concentrations in the study area. From the IPR analysis, horizontal transport contributed substantially to PM2.5 concentrations were dominant in most of the areas of the Jeju Island during the high PM2.5 episode, while the aerosol process and vertical transport in the southern areas largely contributed to higher PM2.5 concentrations.
This paper presents the design of DC protection system of Light Rail Transit system. Especially, the composition and interface for DC Switchgear. Digital protection unit and sort of protection algorithm are focused. DC Switchgear (DCSWGR) for LRT testline consist of 5 different panels with peculiar characteristics are examined. Also Basic actuation principle for DC fault select relay (50F), Line Test Device (LTD), DC Overcurrent(OCR) relay are introduced.
THE RAILWAY VEHICLE IS CONSISTS OF CARBODY, BOGIE AND WHEELSETS, EACH OF COMPONENTS IS CONNECTED WITH RIGID MASS, SPRING AND DAMPER. EACH OF COMPONENTS HAS TRANSLATION MOTIONS OF LONGITUDINAL (X AXIS), LATERAL (Y AXIS) AND VERTICAL (Z AXIS) DIRECTIONS, ROTATION MOTIONS OF X, Y, Z AXIS WHICH ARE NAMED ROLLING, PITCHING AND YAWING. THE VIBRATION MODE OF RAILWAY VEHICLE IS DIFFICULT TO FIND THE CHARACTERISTICS OF MOTION DURING THE OPERATION ON THE TRACK BECAUSE THESE HAPPEN TO INDEPENDENCE OR DUPLICATION MOTION CAUSED BY VEHICLE, WHEEL/RAIL AND TRACK IRREGULARITY ETC. IT IS NAMED AN ABNORMAL VIBRATION THAT THE VIBRATION, WHICH WAS PASSED THE PRIMARY AND SECONDARY SUSPENSION, IS AFFECTED TO THE PASSENGER WITHOUT DAMPING. THIS PAPER DESCRIBES AN EXPERIENCE EVALUATION TO FIND THE CAUSE OF AN ABNORMAL VIBRATION WHICH WAS HAPPEN AT OPERATING SPEED 60KPH ZONE DURING THE MAINLINE TEST.
Our country is promoting the introduction of new means of transportation due to insufficient supply according to the existing demand of road traffic. Among them, manless light railroad transit is settled down as the most definite alternative. However, new traffic systems such as manless light railroad have certain difference between characteristics of hardware and software and subway system. Therefore, there will be many differences compared to the existing contingency system when accidents occur. Railway management organization has to establish railway contingency plan and acquire permission from the minister of the Ministry of Land, Transport, and Maritime Affairs. However, as commercial transportation is available, a new traffic system also should establish contingency plan. Therefore, the establishment of systematic contingency plan is suggested in order to analyze characteristics of manless light railroad in the beginning of introduction and to make contingency response available.
Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
Proceedings of the KSR Conference
/
2011.10a
/
pp.1282-1288
/
2011
Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.
Kim, Young-Taek;Cho, Dong-Il;Lee, Oh-Hyun;Park, Hee-Jun
Proceedings of the KSR Conference
/
2011.10a
/
pp.1108-1114
/
2011
In general, railway system uses wheels so detecting speed by tachometer. However, LRT(Light Rail Transits) stands out recently as alternatives transportation, and besides of that Maglev trains are emerged as an alternative means of transportation. Maglev operates above certain heights caused inability of the measurement by tachometer which used to detect speed of wheels. Velocity Detection Signal Device of Train Control System applied in "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train" which is prepared ahead of opening in 2013. This paper, therefore, explains the function and operation principal of Velocity Detection Signal Device, and suggests installation method of velocity detection loop installed around the track.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.