• Title/Summary/Keyword: LON Bus

Search Result 3, Processing Time 0.021 seconds

A Study of Voltage Control for Lower Side Parallel Transformer (병렬운전 변압기 전압제어 및 저압축 모선보호방식연구)

  • Yun, Gi-Seob;Baek, Seung-Do;Choi, Hyuck-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.233-236
    • /
    • 2001
  • Parallel operation scheme to several transformers is adopted because of the load increase, economic problem, or load shedding. For the transformer's parallel operation, loads proportional to each transformer's capacity must be allotted, and circulation currents must be limited as much as without causing any problem in a real operation. But, both transformers in parallel operation can be tripped when either faults at lower voltage side of a transformer or faults in a bus occurs. Therefore, parallel operation scheme to distribution transformers in Korea is not adopted in a normal state but only when loaded or load-shedded. These are due to the insufficiency of the construction in communication network and AVR scheme. Besides that, those are because bus bar protection scheme to lower voltage side of a transformer is not applied. In spite of enormous initial investment costs, advanced countries take so much account of power system reliability and stable supply that they adopt the parallel operation scheme in a normal state. One of the problems in parallel operation is the overheat of transformers due to the excessive circulation currents. This paper presents the scheme that controls voltages between both transformers using circulation currents that occurs in parallel operation.

  • PDF

The Construction Of Water Treatment Operation System Using Fieldbus (필드버스(Lonworks)를 이용한 수운영시스템 구축)

  • Park, J.S.;Kim, I.S.;Song, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 2004.07d
    • /
    • pp.2257-2259
    • /
    • 2004
  • Water Treatment Operation System is applied in most water treatment plants with DCS(Distributed Control System) or PLC(Programmable Logic Controller) system. But it has a lot of problems in viewpoint of cost and expansibilities. Therefore, we rose demand about a system that it was easier, convenient and a few costs. So, It was appeared at a Fieldbus as an alternative about this. It is used in ail industrial fields, but because of the economic reality that we can't removes the existing system, and cannot introduce new technology. Because it is actual to be hard to find an actual implementation reward and way of domestic fieldbus technology, we cannot be acknowledged with reliability in the industrial spot. Therefore, We is going to look into a fieldbus application reward in this paper. That is, We recognize structure and a kind of a fieldbus in a Chapter 2. And we is going to look into difference between a PLC method and fieldbus methods in a Chapter 3. Also, We are going to compare the system that used PLC with the system that used fieldbus (LonWorks). And the objects are JinAn and Wonju where a field bus was applied to.

  • PDF

The Novel Configuration of Integrated Network for Building Energy System (빌딩 에너지시스템 통합네트워크 구축에 관한 연구)

  • Hong, Won-Pyo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.229-234
    • /
    • 2008
  • The new millennium has started with several innovations driven by fast evolution of the technologies in energy sector. A strong impulse towards the diffusion of new economical efficient technologies regulatory incentives related to energy production from renewable source and a small scale building trigeneration and to promotion of more sustainable environmental-friendly generation solutions, the evolution of electricity markets, more and more binding local emission constraints, and the need for improving the security of supply to reduce the energy system vulnerability. The 24 percentage energy quantify of total energy consumption consumes in commercial buildings and residential houses and the 30% portion of total $CO_2$ emissions covers also in the commercial buildings and residential houses sector. To cope with efficiently this energy sinuation in building sector, Building microgrid or building tooling, heating & power(BCHP) system has been interested in recent day due to meeting thermal and electric energy requirements efficiently and with appropriate energy quality. A multi agent system is a collective of intelligent agents that communicate with each other and work cooperatively to achieve common goals. Also, it is to medicate and coordinate communication between Control Areas and Security Coordinators for teal-time control of the BCHP system and the power pid. In this new circumstance, it is very important to integrate the power and energy delivery system and the information system(communication, networks, and intelligent equipment) that controls it. Therefore, development of smart control modules with open communication protocol and seamlessly interchange the data and information between control network and data network including extranet and intranet give a great meanings. We designed and developed the TCP/IP-CAN IED agent modules and ModBus./LonTalk/(TCP/IP) IED agent ones to configure the multi-agent system based smart energy network of commercial buildings and also intelligent algorithms for inverter fault diagnostics which ran be operated in control level or agent level network.

  • PDF