• 제목/요약/키워드: LFOR(Lightning flashover rate)

검색결과 2건 처리시간 0.015초

LPATS를 이용한 한반도 뇌격파라메터의 통계분포에 관한 연구('96~'98) (A Study on the Statistical Analysis of Lightning Parameters by Lpats in Korea ('96~'98))

  • 우정욱;심응보;정길조;김정부;이건웅
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제49권5호
    • /
    • pp.310-314
    • /
    • 2000
  • To study the basic research of the lightning parameters for power system operation, LPATS(Lightning Positioning and Tracking System) has been introduced since 1995 in KEPCO(Korea Electric Power Corporation). We have developed the lightning parameters analysis program which can produce accumulative magnitude distribution of lightning current and IKL map by LPATS data. We obtained the various statistical distributions of lightning current parameters since 1996 by the lightning analysis program for the pertinent insulation design. In this paper, we describe the LPATS system in KEPCO, the statistical distribution of lightning current parameters and the IKL(Isokeraunic Level) map from 1996 to 1998. And the compared results between the calculated LFOR(lightning flashover rate) and the observed rate are also described.

  • PDF

보조접지선 시공에 의한 송전선로의 내뢰성 향상효과 모의 (A Simulation of Lightning Faults Reducing Effects on the 154 kV Transmission Tower by Auxiliary Grounding)

  • 곽주식;심정운;심응보;최종기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 E
    • /
    • pp.1843-1846
    • /
    • 1997
  • This paper describes the fault reducing effects of the 154 kV transmission tower by auxiliary grounding from the top of the tower to ground. The grounding surge impedance of the auxiliary grounding system is calculated by CDEGS(:Current Distribution Electromagnetic Interference Grounding and Soil Structure Analysis), and the critical lightning back flashover current and arcing horn dynamic characteristics are simulated by EMTP/TACS(:Electromagnetic Transient Program/Transient Analysis of Control Systems). The calculated results of total LFOR(Lightning Flashover Rate) shows that the LFOR can be reduced from 5.2(count/100km. year) to 3.4 by auxiliary grounding on the 154 kV transmission tower with one ground wire shielding system.

  • PDF