• Title/Summary/Keyword: LEDE concept

Search Result 1, Processing Time 0.016 seconds

Design for the Reflection Free Zone with the Adequate Initial Time Delay Gap at the Control Room (음향조정실에서 적절한 초기지연시간을 갖는 무반사지역의 설계연구)

  • Rhee, Esther
    • The Journal of the Acoustical Society of Korea
    • /
    • v.26 no.1
    • /
    • pp.32-41
    • /
    • 2007
  • The control room has been usually designed by the consideration of only one listening position for the sound engineer. By this study. many listening positions with the very similar acoustical condition were located in the specific region, so-called 'the reflection free zone', where the several engineer could evaluate the quality of sound at the same time. For constructing the reflection free zone, the control room has been designed by the concept of the $LEDE^{TM}$, and the initial time delay gap has been controled by the structure of control room and the properties of sound-absorbing materials. diffuser, Helmholtz resonator and image source of sound. The occurrence of any harmful phenomena like the standing wave, acoustic focusing. coloring. Hass effect and flutter echo, has greatly reduced in the reflection free zone.