• Title/Summary/Keyword: Korea power system

Search Result 12,486, Processing Time 0.053 seconds

Investigation of the Preventive Diagnostic Criteria for Power Transformer (전력용 변압기 예방진단 기준치 검토)

  • Kweon, D.J.;Koo, K.S.;Kang, Y.W.;Woo, J.W.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.592-596
    • /
    • 2005
  • The preventive diagnostic system prevents transformers from power failure by giving alarm and observing transformers in service. And it helps to establish the plan for optimum maintenance of transformer as well as to find location or cause of fault using accumulated data. KEPCO has adopted the preventive diagnostic system at nine 345kV substations since 1997. Techniques for component sensors of preventive diagnostic system were settled but diagnostic algorithm, diagnostic criteria and practical use of accumulated data are not yet established. This paper, to build up the base of preventive diagnostic algorithm for the power transformer, investigated the preventive diagnostic criteria for power transformer.

  • PDF

A Study on the Statistical Analysis of Lightning Parameters by Lpats in Korea ('96~'98) (LPATS를 이용한 한반도 뇌격파라메터의 통계분포에 관한 연구('96~'98))

  • Woo, Jeong-Wook;Shim, Eung-Bo;Jung, Gil-Jo;Kim, Jung-Bu;Lee, Geon-Woong
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.49 no.5
    • /
    • pp.310-314
    • /
    • 2000
  • To study the basic research of the lightning parameters for power system operation, LPATS(Lightning Positioning and Tracking System) has been introduced since 1995 in KEPCO(Korea Electric Power Corporation). We have developed the lightning parameters analysis program which can produce accumulative magnitude distribution of lightning current and IKL map by LPATS data. We obtained the various statistical distributions of lightning current parameters since 1996 by the lightning analysis program for the pertinent insulation design. In this paper, we describe the LPATS system in KEPCO, the statistical distribution of lightning current parameters and the IKL(Isokeraunic Level) map from 1996 to 1998. And the compared results between the calculated LFOR(lightning flashover rate) and the observed rate are also described.

  • PDF

Hybrid Control System for Managing Voltage and Reactive Power in the JEJU Power System

  • Seo, Sang-Soo;Choi, Yun-Hyuk;Kang, Sang-Gyun;Lee, Byong-Jun;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.4
    • /
    • pp.429-437
    • /
    • 2009
  • This paper proposes a hybrid voltage controller based on a hierarchical control structure for implementation in the Jeju power system. The hybrid voltage controller utilizes the coordination of various reactive power devices such as generators, switched shunt devices and LTC to regulate the pilot voltage of an area or zone. The reactive power source can be classified into two groups based on action characteristics, namely continuous and discrete. The controller, which regulates the pilot bus voltage, reflects these characteristics in the coordination of the two types of reactive power source. However, the continuous type source like generators is a more important source than the discrete type for an emergency state such as a voltage collapse, thereby requiring a more reactive power reserve of the continuous type to be utilized in the coordination in order to regulate the pilot bus voltage. Results show that the hybrid controller, when compared to conventional methods, has a considerable improvement in performance when adopted to control the pilot bus voltage of the Jeju island system.

DEVELOPMENT OF A STEAM GENERATOR LANCING SYSTEM

  • Jeong Woo-Tae;Kim Seok-Tae;Hong Sung-Yull
    • Nuclear Engineering and Technology
    • /
    • v.38 no.4
    • /
    • pp.391-398
    • /
    • 2006
  • It is recommended to clean steam generators of nuclear power plants during plant outages. Under normal operations, sludge is created and constantly accumulates in the steam generators. The constituents of this sludge are different depending on each power plant characteristics. The sludge of the Kori Unit 1 steam generator, far example, was found to be composed of 93% ferrous oxide, 3% carbon and 1% of silica oxide and nickel oxide each. The research to develop a lancing system that would remove sludge deposits from the tubesheet of a steam generator was started in 1998 by the Korea Electric Power Research Institute (KEPRI) of the Korea Electric Power Corporation (KEPCO). The first commercial domestic lancing system in Korea, the $KALANS^(R)-I$ Lancing System, was completed in 2000 for Kori Unit 1 for cleaning the tubesheet of its Westinghouse Delta-60 steam generator. Thereafter, the success of the development and site implementation of the $KALANS^(R)-I$ lancing system for YGN Units 1&2 and Ulchin Units 3&4 was also realized in 2004 for sludge removal at those sites. The upper bundle cleaning system for Westinghouse model F steam generators is now under development.

A Study on the Remote Monitoring and Control of Ship's Emergency Lighting System (선박 비상조명 원격 모니터링 제어)

  • Yang, Hyun-Suk;Kim, Kun-Woo;Lim, Hyun-Jung;Moon, Jung-Pil;Lee, Sung-Geun;Kim, Yoon-Sik
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.207-210
    • /
    • 2005
  • This paper describes a design of several ship's emergency lighting system(SELS) that power factor is improved and power is controlled extensively, and techniques to control and monitor this system in remote distance by PC serial communication. The remote monitoring control system is composed of emergency power supply system (EPSS), half bridge(HB)inverter, fluorescent lamp(FL), microprocessor, multi communication interface. EPSS checks the voltage of the emergency backup battery in real time. In case that the voltage of 13[V] or less has been detected for 5[msec] or longer for 3 times in a row, charger circuit is connected for battery charging. Experimental works using proposed system confirm that speedy and stable power to be supplied when main power source cut-off, compared with conventional analog type, and input power up to 35.0[%] by adjusting of pulse frequency of the HB inverter.

  • PDF

hydraulic-power generation of electricity plan of multi-Purpose dam in electric Power system (전력계통에서의 다목적댐 수력발전계획)

  • Kim, Seung-Hyo;Ko, Young-Hoan;Hwang, In-Kwang
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1248-1252
    • /
    • 1999
  • To provide electricity power of good quality, it is essential to establish generation of electricity plan in electric power system based on accurate power-demand prediction and cope with changes of power-need fluctuating constantly. The role of hydraulic-power generation of electricity in electric power system is of importance because responding to electric power-demand counts or reservoir-type hydraulic-power generation of electricity which is designed for additional load in electric power system. So hydraulic-power generation of electricity must have fast start reserve. But the amount of water, resources of reservoir-type hydraulic-power generation of electricity is restricted and multi-used, so the scheduling of management by exact forecasting the amount of water is critical. That is why efficient hydraulic-power generation of electricity makes a main role on pumping up the utility of energy and water resource. This thesis introduced the example of optimal generation of electricity plan establishment which is used in managing reservoir-type hydraulic-power generation of electricity.

  • PDF

Development of Optimal Power Flow for the Ancillary Service of Reactive Power Generation under Restructuring Environment (전력산업 구조개편 환경 하에서 무효전력 보조서비스 운용을 위한 최적조류계산법 개발)

  • Song, T.Y.;Jeong, M.H.;Lee, B.;NamGoong, J.Y.;Moon, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.58-61
    • /
    • 2001
  • Under restructuring, not only real power pricing but also reactive power pricing is important for the system operation Especially, making a reasonable reactive power pricing is becoming more important than any other time. In this paper, the authors set a proper power factor and price the portion of the reactive power generation that exceeds the power factor. To apply this method to an optimization problem, we developed optimal power flow based on interior point method. By using this IPM for the power system, the System operator can use this strategy for reactive power generation pricing and also the Generators can got the motivation to generate reactive power.

  • PDF

Development of Web-based Power Plant Simulator System (원격 훈련용 발전 시뮬레이터 개발)

  • Byun, Seung-Hyun;Kang, Hae-su;Woo, Joo-Hee;Lee, Jee-Hoon;Kim, Duck-Ho
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.277-283
    • /
    • 2021
  • Power plant simulators have been used for operator training, control verification and engineering verification. In general, simulators can be used in the place where they are installed by only single user group at a time. Considering high cost of simulator development, a lot of available scenarios, the diversity of user level and accessibility based on users' work location, development of simulator system that can be used by multiple user groups regardless of location is required in order to enhance utilization of simulators. In this paper, the simulator system that can be used by multiple user group simultaneously without location limitation is proposed. The simulator system is composed of simulator servers, database servers, HMI servers, a web server, web clients. Simulator server consists of control model, process model that are developed for Circulating Fluidized Bed power plant located overseas. A web server manages user accounts, operation procedures, multiple server access between web client group and simulator server group. In other words, a web server makes a user group select a simulator server at a time. The developed simulator system is integrated after implementing process model, control model, HMI, and web server. Web client systems are installed on local site where power plant is located, while simulator servers, HMI servers, database servers, and a web server are located in KEPCO RI. The developed simulator system is verified by steady-state test, malfunction test and so on via remote access.

A sensitivity analysis about reactive power according to the interconnection distance of wave-offshore hybrid generation system (복합발전 계통연계 시 보상장치 필요성 분석을 위한 거리에 따른 무효전력 민감성 분석)

  • Jung, Seungmin;Yoo, Yeuntae;Song, Sungyoon;Jang, Gilsoo
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.251-252
    • /
    • 2015
  • The designed hybrid generation system (HGS) not only consider the voltage condition of grid connection point but also do reactive power support according to the transmission system operator's directions. The PCS operation plan in HGS should be supported by precise transferred quantity expectation about reactive power because the system has large physical areas and also be interconnected with grid through long transmission system. Therefore, the realistic measuring process about transferred reactive power quantity by utilizing HGS is required to consider additional compensation plan. In this paper, an reactive power transferred capability of HGS with expected parameter is analyzed, and imposed to the simulation process that is performed on EMTDC environment. Basically, grid information and system characteristics were utilized with Jeju island in Korea, and the performance analysis is carried out based on the composed layout in ongoing project.

  • PDF

Basic study on the protection of Korean power system applying superconducting devices (초전도 전력기기 적용에 따른 계통보호문제 고찰)

  • Lee, Seung-Ryul;Yoon, Jae-Young;Lee, Byong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.625-626
    • /
    • 2007
  • This study is on the protection system of Korean power system applying superconducting power devices. We investigates firstly protection systems of Korean power system and then do a basic study on the impact of relay systems in the power system with superconducting devices. For the more reliable result, we will carry out relay operation tests in the power system applying superconducting facilities using RTDS(Real Time Digital Simulator) in the future.

  • PDF