• Title/Summary/Keyword: Kem Deckplate

Search Result 1, Processing Time 0.013 seconds

A Study on the Productivity Analysis of Slab Construction Methods - Focused on Conventional Slab, Form Deckplate, Ferro Deckplate, and Kem Deckplate - (슬래브 공법간의 생산성 분석$\cdot$비교에 관한 연구 - 재래식 슬래브, 골형 데크플레이트, 철근트러스 데크플레이트, 그리고 내화구조용 뎨크플레이트를 중심으로 -)

  • Yoo Jin-Ho;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-405
    • /
    • 2001
  • The purpose of this study is to provide productivity analysis of conventional slab method productivity and deckplate methods in building construction. Productivity analysis was performed on the data in construction sites and a interview survey. The results of this study are as follow: 1. Kem deckplate is analyzed to the most economic in a view of the cost. 2. Kem deckplate is analyzed to the most economic and order Ferro deckplate, Form deckplate and conventional slab method in a view of the productivity. 3. Kem deckplate is analyzed to the superior slab method in a view of the quality. 4. Conventional slab method is investigated disaster of precipitation and Deckplate method is hazard of an eletric shock. Therefore, Kem deckplate method is analyzed to the superior productivity

  • PDF